00212PWS.docx
DOCX document 80 KB Posted
- Attached to
- PLUG-IN UNIT, ELECTRICAL
- Solicitation number
- FA8517-15-Q-00212
About this file
PERFORMANCE WORK STATEMENT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00212_PKGRQMT_REPORT.pdf | ||
| 00212_TRNSPDATA_REPORT.pdf | ||
| 00212_CDRL_A004_DI-NDTI-80566A.pdf | ||
| WD_SantaClara_CA.pdf | ||
| 00212_CDRL_A009_DI-MISC-81832.pdf | ||
| 00212_CDRL_A005_DI-NDTI-80809B.pdf | ||
| 00212_CDRL1_REPORT.pdf | ||
| 00212SOW_CAVAF_CFM_V17_8Aug2014.docx | DOCX document | |
| FA851715Q00212.pdf | ||
| 00212_CDRL_A001_DI-QCIC-80125B.pdf | ||
| 00212APCSAFE.doc | DOC document | |
| 00212_CDRL_A006_DI-SAFT-81536-T.pdf | ||
| 00212_CDRL_A002_DI-QCIC-80126B.pdf | ||
| 00212_CDRL_A007_DI-MGMT-81803.pdf | ||
| 00212_CDRL_A008_Dl-MGMT-81804A.pdf | ||
| WD_Cook_Illinois.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance-based Work Statement for F-15 Electronics System Test Set (ESTS)
NSN: 6625-01-434-1238KV
PR: FD2060-15-00212
29 October 2014
1.0 Description of Services
1.1 Objective(s): This Performance-based Work Statement (PWS) describes the services required to keep the F-15 Electronic Systems Test Set (ESTS) available and operational condition. The ESTS is used to test, troubleshoot, and repair a variety of highly complex, high cost digital, radio frequency (RF), analog, electro-mechanical, and optical of the F-15 avionics line replaceable units (LRUs) both at home site and deployed locations. The NSN 6625-01-434-1238, listed below is a Commercial-off-the-shelf (COTS) item which is essential electronic instrument for operation of the ESTS tester and associated Test Program Sets. These services include the repair of this item to serviceable condition in accordance with the manufacturer’s specifications. Presently, there is 2 surge, & 2 MICAPs high priority backorders on this item.
1.1.1 Background: The F-15 ESTS was designed as a replacement for the existing F-15 AIS. The majority of the instruments that make up the F-15 ESTS are COTS items. One of these COTS items is the Plug-In Unit Electrical/Electronic Test Equipment, NSN 6625014341238. They were integrated by Northrop Grumman Corp (NGC) into the ESTS tester that is not sold to the private sector. The ESTS is used to test, troubleshoot, and repair a variety of highly complex, high cost digital, radio frequency (RF), analog, electromechanical, and optical F-15 avionics line replaceable units (LRUs) both at home site and deployed locations.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by sustaining the F-15 Electronics System Test Set (ESTS) which will enable the warfighter to continue to test and fault isolate deficiencies in F15 radar Line Replaceable Units (LRUs). The F-15 ESTS Plug-In Unit Electrical/Electronic Module is vital to the Air Force providing close air support, air interdiction, and force protection for the warfighter. Close air support roles include supporting ground troops, escorting convoys, and flying urban operations. Air interdiction missions are conducted against planned targets and targets of opportunity. Force protection missions include defending air bases and other facilities.
2.0 Services Summary
| Performance Objective |
| PWS Reference |
| Performance Threshold |
| Comply with the quality levels of repair necessary to return assets in serviceable condition. |
| 4.2.4.1, 4.2.4.2 |
| The asset(s) shall be repaired in accordance with T.O. 00-25-234. |
The asset(s) shall pass initial screening/test/inspection, at a minimum, 95% of the time per contract year. The remaining (5% or less) of failed asset(s) shall pass on the second attempt.
There shall be no more than one PQDR per contract year.
| Provide on time Turnaround time (TAT) for exchangeable SURGE and MICAP requirements |
| 4.2.3.1 |
| 100% of requirements met within 15 days of receipt of exchangeable surge requirements notification. |
| Provide on time TAT for routine requirements |
| 4.2.3.1 |
| TAT of 90 calendar days from unit induction with no more than two late per quarter. |
| Provide Mishap Notification and Reporting of all instances |
| 5.5.3.1, 5.5.3.2 |
| No more than one instance of late mishap notification per year. |
| Provide timely and accurate reporting in CAV-AF. |
| 4.5 |
| All CAV-AF transactions shall be accomplished daily or as transactions occur basis. The following metrics will be monitored: |
GFM In-Transit Repairable GFM Accountability Assets Not on Contract
3.0 Government Property and Services
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at the site below.
http://farsite.hill.af.mil
3.2 Government Property to be Provided: Government property will not be provided.
3.3 Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
4.0 Technical Requirements
4.1 Period and Place of Performance
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order extends for a one year basic contract with one year options.
4.1.2 Place of Performance: These services shall be performed at the Contractor’s facility.
4.2 Item Unique Identification (IUID)
4.2.1 In accordance with DFARS 252-211.7003(a), Item Identification and Valuation / Definitions, “ ‘DoD unique item identification’ means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.” Unique item identification is required for all items that meet the criteria established by DFARS 211.274-2, Policy for unique item identification.
4.2.2 The Contractor shall mark items in accordance with DFARS 211.274-2, DFARS 252-211.7003, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property.
4.2.3 In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government user will add item(s) to the Department of Defense (DoD) IUID Registry. The Government user or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record(s) in the DoD IUID Registry.
4.2.4. IUID MARKING PLAN: The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130N, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by the Government Engineering organization, prior to implementation.
Data Item description: Item Unique Identification (IUID) Marking Plan (19 July 2011). (DI-MGMT-81803, A007)
4.2.5. IUID MARKING ACTIVITY, VALIDATION AND VERIFICATION REPORT: The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. Data Item Description: Item Unique Identification (IUID) Marking Activity and Verification Report (19 JUL 2011).(DI-MGMT-81804A, A008)
4.3 Packaging
4.3.1 The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129P, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1D, Standard Practice for Military Packaging. The Contractor shall ensure that classified material is packaged, marked and shipped in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.3.2 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to static discharge damage in accordance with MIL-STD-1686C, Military Standard: Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
4.3.3 In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
4.3.4 Palletization: The Contractor shall palletize loads for shipment in accordance with MIL-STD-147E, Department of Defense Standard Practice: Palletized Unit Loads.
4.3.5 Counterfeit Electronics Parts: The Contractor shall establish policy and procedures to mitigate the risk of counterfeit electronics parts being installed in end items or otherwise entering the USAF/DoD inventory in accordance with Aerospace Standard (AS)5553, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition. (CDRL A009 DI-MISC-81832 Counterfeit Prevention Plan)
4.4 Government-Industry Data Exchange Program (GIDEP)
4.4.1 The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction (AFJI) 63-108, Government-Industry Data Exchange Program (GIDEP), and GIDEP Operations Manual S0300-BT-PRO-010, Government-Industry Data Exchange Program. The Contractor shall submit all applicable data to GIDEP, as it is generated, in accordance with the CDRLs.
4.4.2 The Contractor shall review each Alert/Safe-Alert report received from GIDEP to determine if the item or process for which the Alert/Safe Alert report is issued is applicable to the contract/order and take appropriate action. Upon the determination that an Alert/Safe-Alert report is applicable, the Contractor shall inform the impacted organizations and subcontractors in accordance with the CDRLs. The Contractor shall maintain a record of the status and disposition of all Alert/Safe-Alert reports in accordance with the CDRLs.
[CDRL A001, DI-QCIC-80125B, Alert/Safe-Alert Report; CDRL A002, DI-QCIC-80126B, Response to an Alert/Safe Alert Response]
4.5 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be monitored:
GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@robins.af.mil.
[CDRL A003, DI-MGMT-81634B, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report]
4.6 Repair Acceptance Test/Inspection Approval.
The Contractor shall develop detailed repair acceptance test procedures which must be approved by the Government. The test plan & test procedures shall identify the test instruments being used by manufacturer, model number, serial number and associated test software. Additionally, the test procedures shall address critical Original Equipment Manufacturers’ (OEM) specification requirement (CDRL A004, DI-NDTI-80566A, Test Plan). After Government approval of repair acceptance test procedures, the Contractor shall utilize the procedures to perform repair of the 1st repair acceptance test unit. The Contractor shall perform acceptance testing of their 1st repair unit at a Government facility to be determined by the Government. The testing shall be witnessed by a Government representative. The Contractor shall submit a Repair Acceptance Test/Inspection Report not to exceed thirty (15) days after completion of the testing. Upon receipt of the report, the Government shall have 15 days to approve/disapprove the report (CDRL A005, DI-NDTI-80809B, Test/Inspection Report). Note: This type of testing does not apply to approved sources.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis
5.1.1 Definition of Mission-Essential Services: In accordance with DFARS 252.237-7023(a)(1), Continuation of Essential Contractor Services, “ ‘Essential contractor service’ means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, … associated support activities, … and similar services provided to foreign military sales customers under the Security Assistance Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.”
5.1.2 Designation of Services as Mission-Essential: In accordance with DFARS 237.7602(a), The Continuation of Essential Contractor Services / Policy, DFARS 252.237-7023(a)(2), and Air Force Instruction (AFI) 10-403, Deployment Planning and Execution, paragraph 1.9.1.33.2, the Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in accordance with FAR 52.204-2, Security Requirements.
5.2.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.
5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual 5205.02-M to protect U.S. Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.
5.2.4 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or CUI in accordance with DoD 5220.22-M. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.
5.2.5 Security Clearance: The Contractor shall ensure applicable Contractor personnel have security clearances at the Secret level for proper accomplishment of contract/order requirements. The security clearance shall be obtained in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification. Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified information and/or CUI and classified items.
5.2.6 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.
5.2.7 Security of Contractor System(s): The Contractor shall ensure the security of Automated Information System(s) (AIS) at the Contractor’s facility to preclude potential security incidents or violations including potential unauthorized disclosure or compromise of classified information and/or CUI.
5.2.8 Access to Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to an unclassified or classified Government AIS have the appropriate background check or security investigation conducted. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
5.2.9 Access to Government Facility: The Contractor shall ensure Contractor personnel who require access to a Government facility comply with the security requirements of the facility.
5.3 Environmental Management System (EMS)
5.3.1 Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and E.O. 13514, Federal Leadership in Environment, Energy, and Economic Performance, establish the requirement for an EMS.
5.3.2 In accordance with the Assistant Secretary of the Air Force (SAF) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 11 Dec 06, and the Air Force Materiel Command/Vice Commander (AFMC/CV) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 1 Aug 07, Contractor personnel who perform work on any USAF installation shall comply with the EMS requirements established by the installation.
5.3.3 These services shall be performed only at the Contractor’s facility; therefore, the EMS requirement does not apply.
5.4 Green Procurement Program (GPP)
5.4.1 Under Secretary of Defense (USD) Memorandum, Establishment of the DoD Green Procurement Program, dated August 27 2004, establishes the requirement for a GPP. The GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally-preferable products and services. In accordance with FAR 23.404, Agency Affirmative Procurement Programs, the GPP requires 100% of purchases of Environmental Protection Agency (EPA)-designated products, included in the Comprehensive Procurement Guidelines (CPG) list, contain recovered materials unless the item cannot be acquired competitively within a reasonable timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price. In accordance with FAR 23.101, Sustainable Acquisition Policy / Definition, the GPP requirement applies to all acquisitions, including services, using U.S. Government appropriated funds.
5.4.2 The prime Contractor shall ensure subcontractors comply with the GPP requirement.
5.5 Safety Requirements
5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoDD 4715.1E, Environmental, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program.
5.5.2 Voluntary Protection Program (VPP): The USAF is a participant in the OSHA VPP. Additional information regarding VPP is available at the site below.
http://www.osha.gov/dcsp/vpp/index.html
5.5.3 Mishap Notification/Investigation
5.5.3.1 In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.4.6.1.1, the Contractor shall report mishaps involving damage or injury to USAF interests. In accordance with AFI 91-204, paragraph 1.3.1.1, damage or injury includes: damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by USAF operations.
5.5.3.2 In accordance with AFI 91-204, paragraph 2.4.6.1.1, the Contractor shall ensure the USAF [Safety Office] and the applicable contract management authority are notified of mishaps. The Contractor shall contact the MFT [Contracting Officer’s Representative (COR), if available, or another MFT member] by telephone within 24 business hours. The MFT will notify the Safety Office and the PCO.
5.5.3.3 In accordance with AFI 91-204, paragraph 2.4.6.1.2, the Contractor shall cooperate with USAF safety investigations.
5.6 Safety and Health
5.6.1 While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.4.6.1.1, the Contractor shall report mishaps involving damage or injury to USAF. The Contractor shall notify the Government Representative (GR), within eight hours of any damage to Government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to Government property less than $500,000.00 during the execution of the contract.
5.6.2 Mishap notifications shall contain, at a minimum, the following information:
| 1) | Contract, Contract Number, Name and Title of Person(s) Reporting |
| 2) | Date, time and exact location of accident/incident |
| 3) | Brief narrative of accident/incident (Events leading to accident/incident) |
| 4) | Cause of accident/incident, if known |
| 5) | Estimated cost of accident/incident (material and labor to repair/replace) |
| 6) | Nomenclature of equipment and personnel involved in accident/incident |
| 7) | Corrective actions (taken or proposed) |
| 8) | Other pertinent information |
5.6.3 If requested by the designated GR, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. (A006, DI-SAFT-81563/T Accident/incident report)
5.7 Inspection of Services
5.7.1 In accordance with FAR 52.246-4, Inspection of Services – Fixed-Price, the Government reserves the right to inspect Contractor performance.
5.7.2 In accordance with FAR 52.246-4, the Contractor shall maintain an inspection process acceptable to the Government. The Contractor and shall maintain records of inspections which shall be made available to the Government as long as the contract requires.
5.8 Trafficking in Persons
5.8.1 The Contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons below.
http://www.state.gov/j/tip
5.8.2 In accordance with the Defense Contingency COR Handbook section on Combating Trafficking in Persons, the COR must inform the PCO if the Contractor fails to comply with the requirements of FAR 52.222.50. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).
5.9 Contract Manpower Reporting
5.9.1 In accordance with the Secretary of the Air Force for Acquisition (SAF/AQ) Memorandum, Implementation of FY11 NDAA [National Defense Authorization Act] Section 8108 [of Public Law 112-10 of the Department of Defense and Full-Year Continuing Appropriations Act, 2011], Contractor Inventory, dated Nov 13 2012, the Contractor shall provide an annual count of Contractor personnel performing work if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT) [currently $150,000.00].
5.9.2 In accordance with the Office of the Secretary of Defense (OSD) Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated Nov 28 2012, the Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the Enterprise-wide Contract Manpower Reporting Application (eCMRA) site below. Reporting shall be conducted for each fiscal year (FY), which extends October 1 through September 30. While inputs may be made any time during the FY, all data shall be reported no later than October 31 of the following FY. The Contractor may direct questions to the help desk at the eCMRA site below.
http://www.ecmra.mil
5.10 Invoicing/Payment and Receipt/Acceptance
5.10.1 In accordance with DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Wide Area Workflow (WAWF). Additional information regarding WAWF is available at the site below.
https://wawf.eb.mil
5.10.2 CDRL deliverables may be submitted using WAWF or be submitted directly to the applicable MFT member in accordance with the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.
5.10.3 Services will be accepted by the Program Manager.
PR: FD2060-15-00212 PWS REVISION: 0 1
6.0 Appendices
6.1 Appendix 1, References
| Publication |
| Title of Publication |
| Date of Publication |
| Section(s) that Apply |
| USD Memorandum |
| Establishment of the DoD Green Procurement Program |
August 27 2004 http://www.wbdg.org/pdfs/dod_gpp_082704.pdf
Entire
| AFI 91-204 |
| Safety Investigations and Reports |
| 9 August 2012 |
reissued 8 April 2013 http://www.e-publishing.af.mil/
Paragraphs 1.3.1.1, 2.4.6.1.1- 2.4.6.1.2
| AFMC/CV Policy Letter |
| Conformance with Air Force Environmental Management (EMS) Requirements for Contracts Performed on Air Force Installations |
| 1 August 2007 |
| Entire |
| Public Law 91-596 |
| Occupational Safety and Health Act of 1970 |
| December 29, 1970 |
as amended through January 1, 2004 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT
Entire
| None |
| Defense Contingency COR Handbook |
Version 2 September 2012 http://www.acq.osd.mil/dpap/ccap/cc/corhb/Files/DCCOR_Handbook_2012.pdf
Section on Combating Trafficking in Persons in Chapter 8, Monitoring the Contractor
| AFI 10-403 |
| Deployment Planning and Execution |
| 20 September 2012 |
Change 1 – 29 April 2013 http://www.e-publishing.af.mil/
Paragraph 1.9.1.33
| DoDD 4715.1E |
| Environmental, Safety, and Occupational Health (ESOH) |
| March 19, 2005 |
http://www.dtic.mil/whs/directives/corres/pub1.html
Entire
| DoDD 5205.02E |
| DoD Operations Security (OPSEC) Program |
| June 20, 2012 |
http://www.dtic.mil/whs/directives/corres/pub1.html
Entire
| DoD Manual 5205.02-M |
| DoD Operations Security (OPSEC) Program Manual |
| November 3, 2008 |
http://www.dtic.mil/whs/directives/corres/pub1.html
Entire
| FAR and supplements |
| Federal Acquisition Regulation |
http://farsite.hill.af.mil
Sections applicable to contract and PWS
DoD 5220.22-M
| National Industrial Security Program Operating Manual (NISPOM) |
| February 28, 2006 |
Change 1 - March 28, 2013 http://www.dtic.mil/whs/directives/corres/pub1.html
Entire
| GIDEP Operations Manual S0300-BT-PRO-010 |
| Government-Industry Data Exchange Program |
September 2009 http://www.gidep.org/
Chapter 2, Participation Requirements
| E.O. 13423 |
| Strengthening Federal Environmental, Energy, and Transportation Management |
January 24, 2007 http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf
Entire
| E.O. 13514 |
| Federal Leadership in Environment, Energy, and Economic Performance |
5 October 2009 http://www.whitehouse.gov/assets/documents/2009fedleader_eo_rel.pdf
Entire
| AFJI 63-108 |
| Government-Industry Data Exchange Program (GIDEP) |
15 May 1980 http://www.e-publishing.af.mil/
Entire
AS5553A
Fraudulent /Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition
Revision A 2013-01-21
Entire
| none |
| Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, |
Version 2.5
September 15, 2012 www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf
Entire
File details come from the government source that posted it. Updated .