Demonstration_Project_Attachment_2_Addendum_1_dated_April_15_2019.pdf
PDF 89 KB Posted
- Attached to
- CEMACC II Federal contract opportunity
- Solicitation number
- FA8501-19-B-A001
About this file
This solicitation is for an Indefinite-Delivery Indefinite-Quantity construction contract to provide maintenance, repair, alteration and new construction work at Robins Air Force Base. The contract has a one year base period with four one-year options and has a maximum value of $95 million to be awarded across multiple contracts. Task order values will typically range from $250,000 to $3 million. Work may include new building construction, renovation, repair of structures and facilities, utilities work, hazardous material abatement, and design-build services. The solicitation is restricted to service-disabled veteran-owned small businesses. The contractor must be registered in the System for Award Management and be a U.S.-owned entity. Bonds valued up to the full task order amount will be required on orders over $35,000. The solicitation includes revisions to the statement of work and evaluation procedures.
Demonstration Project Attachment 2 Addendum 1 dated April 15 2019
View the file
Other files for this federal contract opportunity
Show all 50
CEMACC II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision No. 3 Cover Page
15 April 2019
REVISION NO. 1
TO
PROJECT UHHZ 130375
Cnst/Inst Maint Platform RAC 2, Acft Cor Con, B/38
Revision No. 1 consists of the following line items:
Item No. 1: SOW Revisions:
1. Plate S100, An existing ladder exists at the alcove (east) end of the of the duct sock chase and extends the full height of the chase. Ladder needs to be modified or replaced to meet OSHA requirements for configuration and fall protection devices. This also includes a ladder cage for sections 24 ft. or more above the bottom level. Affix an inspection tag to the ladder when work is completed. Ladder requirements shall also meet specifications for new ladders as per drawings and specifications.
2. Plate S100, Provide aluminum floor access hatch at each platform level as required to protect opening per OSHA requirements. Hatch shall pre-manufactured hinged unit with checkered plate top, rated to minimum 300 psf., have hold opens and have gas struts to assist opening/closing. Hatch shall be operable from both sides and shall not be lockable. Hatch shall allow for 30”x30” opening (adjust framing as required). Basis of design – Acudor or equal.
3. Plate E100, Provide Class 1, Div. 1 exit sign at each level and in mechanical room. Signs shall be LED with battery backup. Basis of design – Larson Electronics or equal.
4. Plate E100, At new ladders, change safety chains across openings to gates similar to Detail 3/S503. Also protect adjacent electrical conduit, boxes, etc. from being accidentally grasped with minimum 20 ga. continuous metal guards the full height of the ladder sections, both sides.
Guards shall have hemmed vertical edges to prevent injury if brushed against and shall extend at least 12 inches beyond the sides of the ladders.
5. At Detail 3/A503, add bottom rail to gate to act as a toe guard when gate is closed.
6. All railings shall have minimum 4” high toe guards.
7. Plate S100, change platform at west end on all 3 levels to extend to existing wall with necessary grating, beams and columns (delete note “Edge of new platform match existing steel angle all 3 new levels”). Purpose is to prevent multistory falls should one occur with a ladder next to railing.
8. Plate E100, All new electrical within the plenum shall be rated Class 1, Division 1 per NEC.
Revision No. 3 Cover Page
9. Protect all penetrations through the existing fire rated wall as required to maintain 1 Hr fire rating of wall. All penetrations shall require UL ratings and shall be so designated during shop drawing submittal. Utilize UL approved sleeved methods wherever possible.