Section_L_Attachment_11_PSSC_Transition_Matrix.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Propulsion Subsystem Support Contract Federal contract opportunity
Solicitation number
FA8214-14-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Section L Attachment 11 PSSC Transition Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Propulsion Subsystem Support Contract, newest first.
File Type Posted
PSSC_Questions_and_Answers_3.xlsx XLSX spreadsheet
Section_L_PSSC_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
FA821414R0003_______0003.pdf PDF
Section_J_Attachment_1_PSSC_Performance_Work_Statement.pdf PDF
Section_J_Attachment_3_PSSC_CDRL_Package.pdf PDF
PSSC_Questions_and_Answers_2.xlsx XLSX spreadsheet
Section_J_Attachment_1_PSSC_Performance_Work_Statement.pdf PDF
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_3_CDRL_Package_PSSC.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories.pdf PDF
PSSC_Questions_and_Answers_1.xlsx XLSX spreadsheet
Section_L_PSSC_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
Section_J_Attachment_6_PSSC_Mapping_Worksheet.xlsx XLSX spreadsheet
FA821414R0003_______0001.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories.pdf PDF
Section_J_Attachment_6_PSSC_Mapping_Worksheet.xlsx XLSX spreadsheet
Section_L_Attachment_7_PSSC_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Section_L_Attachment_1_PSSC_PPI_Tool.pdf PDF
Section_L_Attachment_4_PSSC_Consent_Form.pdf PDF
Section_L_Attachment_9_PSSC_EZSource_Instructions.pdf PDF
Section_L_Attachment_8_PSSC_Encryption_Instructions.pdf PDF
PPITool.accdb —
Section_J_Attachment_8_PSSC_GFP_Listing.pdf PDF
Section_L_Attachment_3_PSSC_Questionnaire.pdf PDF
Section_J_Attachment_9_PSSC_DD254.pdf PDF
Section_J_Attachment_2_PSSC_Government_Rights_in_Data_(GRID).docx DOCX document
FA821414R0003.pdf PDF
Section_L_Attachment_12_Sample_BOE_Summary.xlsx XLSX spreadsheet
Section_L_Attachment_5_PSSC_Commercial_Client_Auth.pdf PDF
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_7_PSSC_QASP.pdf PDF
PSSC_Bidders_Library_Instructions.docx DOCX document
Section_L_Attachment_6_PSSC_Roles_and_Responsibilities.xlsx XLSX spreadsheet
Section_M_PSSC_Evaluation_Factors_for_Award.pdf PDF
Section_L_Attachment_10_PSSC_CLIN_Pricing_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_3_PSSC_CDRL_Package.pdf PDF
Section_J_Attachment_1_PSSC_Performance_Work_Statement.pdf PDF
Section_J_Attachment_2_PSSC_Government_Rights_in_Data_(GRID)_20140718.docx DOCX document
Section_L_Attachment_11_PSSC_Transition_Matrix_20140717.xlsx XLSX spreadsheet
Section_L_Attachment_12_Sample_BOE_Summary.xlsx XLSX spreadsheet
Section_J_Attachment_1_PSSC_Performance_Work_Statement_20140714.docx DOCX document
Section_J_Attachment_4_PSSC_Labor_Rate_Matrix_20140717.xlsx XLSX spreadsheet
Section_J_Attachment_3_PSSC_CDRL_Instructions_and_Master_Listing_16_Jul_14.pdf PDF
Section_M_PSSC_20140714.docx DOCX document
Draft_RFP_Release_Comment_and_Replies_20140717.xlsx XLSX spreadsheet
ICBM_PSSC_GFP_Listing_20140718_Location.docx DOCX document
FA821414R0003.pdf PDF
Section_J_Attachment_5_PSSC_Labor_Categories_20140717.docx DOCX document
Section_L_Attachment_10_PSSC_CLIN_Pricing_Matrix_20140717.xlsx XLSX spreadsheet
Section_L_PSSC_20140717.docx DOCX document
Show all 50

Propulsion Subsystem Support Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transition Matrix

Column AColumn BColumn CColumn DColumn EColumn FColumn GColumn HColumn IColumn JColumn KColumn LColumn M
Section L - Attachment 11: PSSC Transition Matrix
Notes and Instructions:
1. The purpose of this spreadsheet is to supplement Section L, paragraph 4.2.3.3.1 PWS Requirements Transfer and 4.2.3.3.2 Facilities, Equipment, Processes, Personnel, and Data.
2. List risk category and level (Technical/Schedule/Cost (T/S/C) and High/Moderate/Low (H/M/L)). Descriptions of risk(s) should be included in the Transition Strategy.
PWS SectionPWS ElementDoes your transition strategy require the relocation / requalification of any process(es)? (Yes/No)Does your transition strategy require the relocation of any GFP tooling or equipment?
(Yes/No)Does your transition strategy require the acquisition of any government-owned
models? (Yes/No)Does your transition strategy include the ability to conduct simulations with government-owned
models? (Yes/No)Does your transition strategy require the acquisition of any
additional facilities? (Yes/No)Does your transition strategy include any additional personnel training or qualification? (Yes/No)Does your transition strategy require the acquisition of any
additional data? (Yes/No)Does your transition strategy require the acquisition of
any additional documentation? (Yes/No)Provide Transition Strategy References for Transition ApproachTransition Duration
(months)Transition Risks Category and Level
(T/S/C) - (H/M/L)Provide Transition Strategy References for Transition Exit Criteria
Column1Column2Column3Column4Column5Column52Column6Column7Column8Column9Column10Column11Column12Column13
ExampleAging SurveillanceYesYesYesYesYesYesYesYesProvide references to transition strategy (i.e. page and paragraph)6T-H
Provide references to transition strategy (i.e. page and paragraph)Provide references to transition strategy (i.e. page and paragraph)
1.6.5.1Risk Management
1.6.5.3Modification/Replacement/New Requirement Oversight
1.6.5.4Program Task Management
1.6.5.9Program Administration
1.6.6.1.1Systems Engineering
1.6.6.1.2Systems Requirements Determination
1.6.6.1.3Nuclear Surety
1.6.6.1.4Nuclear Control
1.6.6.1.5Environmental Conditions
1.6.6.1.6Trade Studies
1.6.6.1.7Configuration Management (CM)
1.6.6.1.8Software Support
1.6.6.1.9Maintenance Support
1.6.6.1.10Technical Order (TO) Support
1.6.6.1.11Hardware Support
1.6.6.1.12Systems Safety
1.6.6.1.13Demilitarization and Disposal
1.6.6.1.14Corrosion
1.6.6.1.15Emergency Response Support
1.6.6.1.16Weapon System Interface Control
1.6.6.1.17Subsystem and End Item Specifications
1.6.6.1.18Electromagnetic Radiation
1.6.6.1.19Nameplates and Product Marking
1.6.6.1.20Diminishing Manufacturing Sources and Material Shortages (DMSMS)
1.6.6.1.21Test and Evaluation (T&E)
1.6.6.2.1Technical Risk Assessment
1.6.6.2.2Availability
1.6.6.2.3Maintainability
1.6.6.2.4Nuclear Hardness and Survivability
1.6.6.2.5Reliability and Accuracy
1.6.6.2.6Aging Surveillance
1.6.6.2.6.1Solid Propulsion Aging Surveillance
1.6.6.2.6.2Liquid Propulsion Aging Surveillance
1.6.6.2.6.3Ordnance Aging Surveillance
1.6.6.2.6.4Flight Controls Assessment
1.6.6.2.6.5Flight Battery Aging Surveillance
1.6.6.2.7Subsystem Component
1.6.6.2.8Assessment Data
1.6.6.2.9Anomaly Resolution
1.6.6.2.10Modeling and Simulation
3.1Government-Furnished Property (GFP) and Services
3.2Nuclear Weapons-Related Materiel (NWRM)
4.10Safety Requirements

File details come from the government source that posted it. Updated .