APPENDIX_D_Explosive_awareness.pdf

PDF 16 KB Posted

Attached to
Paving Federal contract opportunity
Solicitation number
FA8201-17-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

SOW Appendix D

View the file

Other files for this federal contract opportunity

Other files attached to Paving, newest first.
File Type Posted
Questions_and_Answers_dated_25Jul2017_B.pdf PDF
Questions_and_Answers_dated_25Jul2017.pdf PDF
Site_Visit_12Jul2017-_Attendee_Roster-_Corrected24Jul2017.pdf PDF
Site_Visit_12Jul2017-_Attendee_Roster.pdf PDF
Questions_and_Answers_Dated_20_Jul_2017.pdf PDF
ProjectLimits_New_Waterway_and_ADA_Ramp.JPG JPG image
HWY_&_Roads_121.pdf PDF
HWY_&_Roads_142.pdf PDF
Concrete_Vault.pdf PDF
ProjectLimits_Southwest_Gate.JPG JPG image
Core_Sample_Results.pdf PDF
Questions_and_Answers_19Jul2017.pdf PDF
HWY_&_Roads_223.pdf PDF
HWY_&_Roads_141.pdf PDF
Seed_Project_Statement_of_Work_-6th_Street_Southgate_to_SW_Gate_Revised_19Jul2017.pdf PDF
HWY_&_Roads_131.pdf PDF
Waterway_drawing.JPG JPG image
ProjectLimits_Southgate_Avenue.JPG JPG image
Questions_and_Answers_10Jul2017.pdf PDF
Questions_and_Answers_dated_6Jul2017.pdf PDF
Seed_project_site_maps.pdf PDF
Basic_IDIQ_Statement_of_Work_26JUN2017.pdf PDF
Seed_Project_Statement_of_Work_-6th_Street_Southgate_to_SW_Gate.docx DOCX document
Paving_Site_Visit_memo.pdf PDF
SF_1442_Paving_Solicitation.pdf PDF
Section_M_13_June_2017.docx DOCX document
Paving_Wage_Decisions.pdf PDF
Pricing_Matrix_16Jun2017.xlsx XLSX spreadsheet
Section_L_13_June_2017.docx DOCX document
BASE_FACILITY_DESIGN_STANDARD_-_13_Apr_2017.docx DOCX document
Section_M_Draft.pdf PDF
APPENDIX_A.docx DOCX document
APPENDIX_C_Safety_Plan.pdf PDF
Paving__Draft_SOW_15_March_2017.pdf PDF
Section_L_Draft.pdf PDF
FA8201-17-R-0007_Draft_RFP.pdf PDF
6th_Street_Southgate_to_SW_Gate_Seed_SOW.pdf PDF
APPENDIX_E_Landfill_Map.pdf PDF
Question_Comment_Res_Matrix_Paving.xlsx XLSX spreadsheet
APPENDIX_B.docx DOCX document
Copy_of_Attachment_14_-_Construction_cost_estimate_breakdown_Rev2.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX D (MINIMUM EXPLOSIVE AWARENESS)

A. When working in the Explosive Clear Zone (MAMS I, MAMS II, as well as areas of the Airfield, Little Mountain and UTTR as described in Section 13 (SAFETY REQUIREMENTS), specifically Sections 13.4:

1. Smoke only in posted “Designated Smoking Areas.”

2. “Hot Work” (welding, cutting, brazing, open flames, spark producing equipment, high heat appliances, tools, etc.) requires AF Form 592 issued by the HAFB Fire department before work begins.

3. A speed limit of 25 mph shall be enforced.

4. Park vehicles 100 feet from any explosive facility on a surface free of combustibles. If the vehicle is not required as part of the work effort, it shall be parked in established parking areas or lots.

5. The use of cell phones pagers or radios shall not be used within 10 feet of any explosive facility.

6. Explosive laden vehicles have the right of way at all times.

7. Roads posted “Explosive Operation in Progress” shall not be used.

8. Each work site shall have, as a minimum, two Type ABC fire extinguishers.

9. Work on facilities, or in areas with explosives requires the prior approval of the facility supervisor and OO-ALC/SEW. Unless the explosives have been removed by USAF personnel before work begins.

a. When working in the explosive areas, use only the minimum number of workers to accomplish the job.

Remain in the explosive areas for the minimum amount of time to complete the job. Leave the explosive areas for breaks and lunches. The cardinal rule for the explosive areas: Limit exposure to a minimum number of persons, for a minimum amount of time, to the minimum amount of ammunition and explosives consistent with safe and efficient operations. When lightning is within 5 nautical miles (5.75 land Miles) of HAFB, ALL personnel shall evacuate the Explosive Clear Zone, which is determined as the gated areas of these zones.

b. Emergency procedures in the event of accident, fire, and/or electrical storm:

1. Maintain a capability to communicate with OO-ALC emergency services (telephone 911, cellular phone 801-777-1911, radio with frequency authorized by the Project Manager or other suitable means).

2. Maintain a capability to be contacted by emergency services or the Project Manager.

c. Only tasks consistent with the contract shall be accomplished in explosive areas.

d. Contact shall be made with the 75 CEG Weapons Safety Manager to determine if the contractor employees will be required to attend a briefing before work begins.

I have read and completely understand the above minimum safety requirements and shall comply as they apply with this contract.

PRINTED NAME: _____________________________

SIGNATURE: _________________________________

DATE:____________________________________

APPENDIX D (MINIMUM EXPLOSIVE AWARENESS)
A. When working in the Explosive Clear Zone (MAMS I, MAMS II, as well as areas of the Airfield, Little Mountain and UTTR as described in Section 13 (SAFETY REQUIREMENTS), specifically Sections 13.4:
1. Smoke only in posted “Designated Smoking Areas.”
2. “Hot Work” (welding, cutting, brazing, open flames, spark producing equipment, high heat appliances, tools, etc.) requires AF Form 592 issued by the HAFB Fire department before work begins.
3. A speed limit of 25 mph shall be enforced.
4. Park vehicles 100 feet from any explosive facility on a surface free of combustibles. If the vehicle is not required as part of the work effort, it shall be parked in established parking areas or lots.
5. The use of cell phones pagers or radios shall not be used within 10 feet of any explosive facility.
6. Explosive laden vehicles have the right of way at all times.
7. Roads posted “Explosive Operation in Progress” shall not be used.
8. Each work site shall have, as a minimum, two Type ABC fire extinguishers.
9. Work on facilities, or in areas with explosives requires the prior approval of the facility supervisor and OO-ALC/SEW. Unless the explosives have been removed by USAF personnel before work begins.
a. When working in the explosive areas, use only the minimum number of workers to accomplish the job. Remain in the explosive areas for the minimum amount of time to complete the job. Leave the explosive areas for breaks and lunches. The cardinal rule...
b. Emergency procedures in the event of accident, fire, and/or electrical storm:
1. Maintain a capability to communicate with OO-ALC emergency services (telephone 911, cellular phone 801-777-1911, radio with frequency authorized by the Project Manager or other suitable means).
2. Maintain a capability to be contacted by emergency services or the Project Manager.
c. Only tasks consistent with the contract shall be accomplished in explosive areas.
d. Contact shall be made with the 75 CEG Weapons Safety Manager to determine if the contractor employees will be required to attend a briefing before work begins.