Clarification of work requirements for.docx

DOCX document 11 KB Posted

Attached to
Construct catwalk for HVAC at building 238
Solicitation number
FA8201-10-B-0002
Issued by

About this file

This documents explains the Method of Procedure (MOP).

View the file

Other files

File Type Posted
Amendment 2.pdf PDF
Questions and answers.doc DOC document
Group A photos.pdf PDF
Group C photos.pdf PDF
Group D photos.pdf PDF
Document.pdf PDF
Group B photos.pdf PDF
B238K072115-01-G001.pdf PDF
B238K072115-06-S502.pdf PDF
05 51 33 Metal Ladders.pdf PDF
05 05 23 Welding Structural.pdf PDF
01 14 00 Work Restrictions.pdf PDF
01 14 00 time change-2am.pdf PDF
Solicitation.doc DOC document
B238K072115-10-MH301.pdf PDF
23 00 00 - Air Supply Distribution Ventilation and Exhaust Systems.pdf PDF
B238K072115-08-MD101.pdf PDF
B238K072115-05-S501.pdf PDF
B238K072115-03-S001.pdf PDF
B238K072115-07-S503.pdf PDF
23 64 26 - Chilled Chilled-Hot and Condenser Water Piping Systems.pdf PDF
05 12 00 Structural Steel.pdf PDF
B238K072115-02-G002.pdf PDF
B238K072115-09-MH101.pdf PDF
B238K072115-04-S101.pdf PDF
09 90 00 Paints and Coatings.pdf PDF
01 00 00 General Requirements.pdf PDF
23 03 00.00 20 - Basic Mechanical Materials and Methods.pdf PDF
05 50 13 Misc Metal Fabrications.pdf PDF
B238K072115-11-MH501.pdf PDF
23 05 93 - Testing Adjusting and Balancing for HVAC Systems.pdf PDF
23 07 00 - Thermal Insulation for Mechanical Systems.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification of work requirements for “CATWALKS TO OVERHEAD HVAC BLDG 238”

Contractor shall provide for submittal a Schedule for the entire project from start to finish. This project schedule shall also be accompanied with a Method of Procedure (MOP) explaining the phased approach plan as to how the contractor will demolish and transition all VAV’s as well as installation of the new Cat Walks. The Schedule and MOP will be reviewed by the Government Project Manager for approval. It is the objective for the relocation of the VAV’s to be done with little to now affect on normal day time operation of current users. In relocating VAV’s the contractor will not be allowed to shut down any one VAV for more than three days, so as to avoid impacting normal work functions of the users.