05 05 23 Welding Structural.pdf
PDF 29 KB Posted
- Attached to
- Construct catwalk for HVAC at building 238 Federal contract opportunity
- Solicitation number
- FA8201-10-B-0002
About this file
Specification for welding structural
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KRSM 072115 Catwalks to Overhead HVAC, Building 238 Hill AFB, Utah
WELDING, STRUCTURAL 05 05 23 - 1
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 05 23
WELDING, STRUCTURAL
11/08
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Class 3 Weld Joints
1.2.2 Class 6 Weld Joints
1.3 SYSTEM DESCRIPTION
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Welder, Welding Operator, and Tacker Qualification
1.5.2 Inspector Qualification
1.5.3 Symbols and Safety
PART 2 PRODUCTS
2.1 WELDING EQUIPMENT AND MATERIALS
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
3.1.2 Identification
3.2 QUALITY CONTROL
3.3 STANDARDS OF ACCEPTANCE
3.3.1 Nondestructive Examination
3.3.2 Destructive Tests
3.4 GOVERNMENT INSPECTION AND TESTING
3.5 CORRECTIONS AND REPAIRS
-- End of Section Table of Contents --
WELDING, STRUCTURAL 05 05 23 - 2
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2005) Specification for Structural Steel Buildings, with Commentary
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ASNT RP SNT-TC-1A (2006) Recommended Practice
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2007) Standard Symbols for Welding, Brazing and
Nondestructive Examination AWS A3.0 (2001) Standard Welding Terms and Definitions Including
Terms for Adhesive Bonding, Brazing, Soldering, Thermal Cutting and Thermal Spraying
AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel AWS D1.3/D1.3M (2008; Errata 2008) Structural Welding Code - Sheet Steel AWS D1.4/D1.4M (2005; Errata 2005) Structural Welding Code - Reinforcing Steel AWS D14.1/D14.1M (2005) Welding Industrial and Mill Cranes and Other Material
Handling Equipment AWS D14.4/D14.4M (2005) Welded Joints for Machinery andEquipment AWS Z49.1 (2005) Safety in Welding, Cutting and Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM E 165 (2002) Standard Test Method for Liquid Penetrant Examination ASTM E 709 (2008) Standard Guide for Magnetic Particle Examination
1.2 DEFINITIONS
Definitions of welding terms are in accordance with AWS A3.0. The following classifications indicate the project's class(es) of weld joints.
1.2.1 Class 3 Weld Joints
This covers both complete and partial penetration groove weld joints and fillet weld joints. These weld joints apply where failure would not affect the efficiency of a system nor create a hazard to personnel. Class 3 weld joints are connections of secondary members not subject to dynamic action and/or low stressed miscellaneous applications.
1.2.2 Class 6 Weld Joints
This covers plug and slot weld joints as applicable to the requirements of the project's code(s).
1.3 SYSTEM DESCRIPTION
Conform the design of welded connections to AISC 360, unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified
WELDING, STRUCTURAL 05 05 23 - 3
and the submittals approved by the Contracting Officer. Perform all testing at or near the work site. Each Contractor performing welding shall maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 00 00
SD-03 Product Data
Welder, Welding Operator, and Tacker Qualification, G Inspector Qualification
SD-06 Test Reports
Nondestructive Examination
1.5 QUALITY ASSURANCE
1.5.1 Welder, Welding Operator, and Tacker Qualification Each welder, welding operator, and tacker assigned to work on this contract shall be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used.
1.5.1.1 Previous Personnel Qualifications At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:
a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.
b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
c. The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
d. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.5.1.2 Certificates. Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. The certification must state the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.
1.5.1.3 Renewal of Qualification. Re-qualification of a welder or welding operator is required under any of the following conditions:
a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.
WELDING, STRUCTURAL 05 05 23 - 4
b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.
c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.
d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he is qualified, unless there is some specific reason to question the tacker's ability. In such a case, the tacker is required to pass the prescribed tack welding test.
1.5.2 Inspector Qualification. Inspector qualifications shall be in accordance with AWS
D1.1/D1.1M. Qualify all nondestructive testing personnel in accordance with the requirements of ASNT RP SNT-TC-1A for Levels I or II in the applicable nondestructive testing method. The inspector may be supported by assistant welding inspectors who are not qualified to ASNT RP SNT-TC-1A, and assistant inspectors may perform specific inspection functions under the supervision of the qualified inspector.]
1.5.3 Symbols and Safety. Symbols shall be in accordance with AWS A2.4, unless otherwise indicated. Safe weldiing practices and safety precautions during welding shall conform to
AWS Z49.1.
PART 2 PRODUCTS
2.1 WELDING EQUIPMENT AND MATERIALS. Provide all welding equipment, electrodes, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures. All welding equipment and materials shall comply with the applicable requirements of AWS D1.1/D1.1M.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements. Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M and AISC 360. When AWS D1.1/D1.1M and the AISC 360 specification conflict, the requirements of AWS D1.1/D1.1M govern.
3.1.2 Identification. Identify all welds in one of the following ways:
a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.
b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Identification with die stamps or electric etchers is not allowed.
3.2 QUALITY CONTROL
Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. Perform visual inspections to determine conformance with paragraph STANDARDS OF ACCEPTANCE. Conform procedures and
WELDING, STRUCTURAL 05 05 23 - 5
techniques for inspection with applicable requirements of AWS D1.1/D1.1M, ASTM E 165, ASTM E 709.
3.3 STANDARDS OF ACCEPTANCE
Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M and the contract drawings. Perform nondestructive testing by visual inspection. The minimum extent of nondestructive testing must be as indicated on the drawings.
3.3.1 Nondestructive Examination
The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment.
3.4 GOVERNMENT INSPECTION AND TESTING
In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.
3.5 CORRECTIONS AND REPAIRS
If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners.
After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds shall meet the inspection requirements for the original welds. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present.
-- End of Section --