23 03 00.00 20 - Basic Mechanical Materials and Methods.pdf

PDF 18 KB Posted

Attached to
Construct catwalk for HVAC at building 238 Federal contract opportunity
Solicitation number
FA8201-10-B-0002
Issued by
Department of the Air Force Materiel Command Ogden Air Logistics Complex

About this file

Specification for Basic Mechanical Materials and Methods

View the file

Other files for this federal contract opportunity

Other files attached to Construct catwalk for HVAC at building 238, newest first.
File Type Posted
Amendment 2.pdf PDF
Questions and answers.doc DOC document
Group C photos.pdf PDF
Group A photos.pdf PDF
Group D photos.pdf PDF
Document.pdf PDF
Group B photos.pdf PDF
Clarification of work requirements for.docx DOCX document
B238K072115-05-S501.pdf PDF
05 12 00 Structural Steel.pdf PDF
B238K072115-09-MH101.pdf PDF
B238K072115-04-S101.pdf PDF
09 90 00 Paints and Coatings.pdf PDF
05 05 23 Welding Structural.pdf PDF
05 51 33 Metal Ladders.pdf PDF
B238K072115-01-G001.pdf PDF
Solicitation.doc DOC document
B238K072115-10-MH301.pdf PDF
B238K072115-08-MD101.pdf PDF
23 00 00 - Air Supply Distribution Ventilation and Exhaust Systems.pdf PDF
01 14 00 time change-2am.pdf PDF
B238K072115-03-S001.pdf PDF
B238K072115-07-S503.pdf PDF
23 64 26 - Chilled Chilled-Hot and Condenser Water Piping Systems.pdf PDF
B238K072115-02-G002.pdf PDF
01 00 00 General Requirements.pdf PDF
23 07 00 - Thermal Insulation for Mechanical Systems.pdf PDF
05 50 13 Misc Metal Fabrications.pdf PDF
B238K072115-11-MH501.pdf PDF
23 05 93 - Testing Adjusting and Balancing for HVAC Systems.pdf PDF
B238K072115-06-S502.pdf PDF
01 14 00 Work Restrictions.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KRSM 072115 Catwalks to Overhead HVAC, Building 238 Hill AFB, Utah

BASIC MECHANICAL MATERIALS AND METHODS 23 03 00.00 20-1

SECTION TABLE OF CONTENTS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

SECTION 23 03 00.00 20

BASIC MECHANICAL MATERIALS AND METHODS

01/07

PART 1 GENERAL

1.1 REFERENCES

1.2 RELATED REQUIREMENTS

1.3 QUALITY ASSURANCE

1.3.1 Material and Equipment Qualifications

1.3.2 Alternative Qualifications

1.3.3 Service Support

1.3.4 Manufacturer's Nameplate

1.3.5 Modification of References

1.3.5.1 Definitions

1.3.5.2 Administrative Interpretations

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 INSTRUCTION TO GOVERNMENT PERSONNEL

1.6 ACCESSIBILITY

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

BASIC MECHANICAL MATERIALS AND METHODS 23 03 00.00 20-2

SECTION 23 03 00.00 20

BASIC MECHANICAL MATERIALS AND METHODS

01/07

PART 1GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

1.2 RELATED REQUIREMENTS

This section applies to all sections of Divisions: 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.

1.3 QUALITY ASSURANCE

1.3.1 Material and Equipment Qualifications

Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening.

The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.

1.3.2 Alternative Qualifications

Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

1.3.3 Service Support

The equipment items shall be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations shall be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.3.4 Manufacturer's Nameplate

Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.3.5 Modification of References

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.

BASIC MECHANICAL MATERIALS AND METHODS 23 03 00.00 20-3

1.3.5.1 Definitions

For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions shall be considered mandatory, the word "should" shall be interpreted as "shall."

Reference to the "code official" shall be interpreted to mean the "Contracting Officer."

References to the "permit holder" shall be interpreted to mean the "Contractor."

1.3 .5 .2 Administrative Interpretations

For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, shall be applied appropr ia te ly by the Contract ing Off icer as author ized by his administrative cognizance and the FAR.

1.4 DELIVERY, STORAGE, AND HANDLING

Handle, store, and protect equipment and materials to prevent damage before and dur ing ins ta l la t ion in accordance with the manufacturer 's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.

1.5 INSTRUCTION TO GOVERNMENT PERSONNEL

When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system. Instructors shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work.

Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished shall be as specified in the individual section. When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.

When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.

1.6 ACCESSIBILITY

Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

File details come from the government source that posted it. Updated .