23 64 26 - Chilled Chilled-Hot and Condenser Water Piping Systems.pdf
PDF 65 KB Posted
- Attached to
- Construct catwalk for HVAC at building 238
- Solicitation number
- FA8201-10-B-0002
About this file
Specification for Chilled Chilled-Hot and Condenser Water Piping Systems
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KRSM 072115 Catwalks to Overhead HVAC, Building 238 Hill AFB, Utah
HEATING WATER PIPING SYSTEMS 23 64 26-1
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
SECTION 23 64 26
HEATING WATER PIPING SYSTEMS
04/08
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.3 SUBMITTALS
1.4 MODIFICATIONS TO REFERENCES
1.4.1 Definitions
1.4.2 Administrative Interpretations
1.5 SAFETY REQUIREMENTS
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 PROJECT/SITE CONDITIONS
1.7.1 Verification of Dimensions
1.7.2 Drawings
1.7.3 Accessibility
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
2.2 STEEL PIPING
2.2.1 Pipe
2.2.2 Fittings and End Connections (Joints)
2.2.2.1 Threaded Connections
2.2.2.2 Flanged Connections
2.2.2.3 Welded Connections
2.2.2.4 Dielectric Waterways and Flanges
2.2 COPPER TUBING
2.3.1 Tube
2.3.2 Fittings and End Connections (Solder and Flared Joints)
2.3.3 Solder
2.3.4 Brazing Filler Metal
2.4 RELATED COMPONENTS/SERVICES
HEATING WATER PIPING SYSTEMS 23 64 26-2
2.4.1 Field Applied Insulation
2.4.2 Field Painting
2.4.3 Color Coding
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Welding
3.1.1.1 Employer's Record Documents (For Welding)
3.1.1.2 Welding Procedures and Qualifications
3.1.1.3 Welding Safety
3.1.2 Directional Changes
3.1.3 Functional Requirements
3.1.4 Fittings and End Connections
3.1.4.1 Threaded Connections
3.1.4.2 Brazed Connections
3.1.4.3 Welded Connections
3.1.4.4 Flanges and Unions
3.1.5 Valves
3.1.6 Air Vents
3.1.7 Drains
3.1.8 Pipe Hangers, Inserts, and Supports
3.1.8.1 Hangers
3.1.8.2 Inserts
3.1.8.3 C-Clamps
3.1.8.4 Angle Attachments
3.1.8.5 Saddles and Shields
3.1.8.6 Horizontal Pipe Supports
3.1.8.7 Pipe Guides
3.1.8.8 Steel Slides
3.1.8.9 Multiple Pipe Runs
3.1.8.10 Seismic Requirements
3.1.8.11 Structural Attachments
3.2 ELECTRICAL INSTALLATION
HEATING WATER PIPING SYSTEMS 23 64 26-3
3.3 CLEANING AND ADJUSTING
3.4 FIELD TESTS
3.4.1 Equipment and Component Isolation
3.4.2 Pressure Tests
3.4.3 Related Field Inspections and Testing
3.4.3.1 Piping Welds
3.4.3.2 HVAC TAB
3.5 INSTRUCTION TO GOVERNMENT PERSONNEL
-- End of Section Table of Contents --
HEATING WATER PIPING SYSTEMS 23 64 26-4
SECTION 23 64 26
HEATING WATER PIPING SYSTEMS
04/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2004; Errata 2004) Specification for Filler Metals for Brazing and Braze Welding
AWS BRH (2007) Brazing Handbook
AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel
AWS Z49.1 (2005) Safety in Welding, Cutting and Allied Processes
ASME INTERNATIONAL (ASME)
ASME B1.20.1 (1983; R 2006) Pipe Threads, General Purpose (Inch)
ASME B16.1 (2005) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.11 (2005) Forged Fittings, Socket-Welding and Threaded
ASME B16.18 (2001; R 2005) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.21 (2005) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.22 (2001; R 2005) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.26 (2006) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.39 (1998; R 2006) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B16.5 (2003) Standard for Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24
ASME B16.9 (2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings
ASME B31.9 (2008) Building Services Piping
ASTM INTERNATIONAL (ASTM)
ASTM A 733 (2003) Standard Specification for Welded and Seamless Carbon Steel and Austenitic Stainless Steel Pipe Nipples
HEATING WATER PIPING SYSTEMS 23 64 26-5
ASTM B 32 (2008) Standard Specification for Solder Metal
ASTM B 42 (2002e1) Standard Specification for Seamless Copper Pipe, Standard Sizes
ASTM B 62 (2002) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B 75 (2002) Standard Specification for Seamless Copper Tube
ASTM B 813 (2000; R 2009) Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube
ASTM B 88 (2003) Standard Specification for Seamless Copper Water Tube
ASTM D 3308 (2006) PTFE Resin Skived Taped
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY
(MSS)
MSS SP-25 (2008) Standard Marking System for Valves, Fittings, Flanges and Unions
MSS SP-58 (2002) Standard for Pipe Hangers and Supports - Materials, Design and Manufacture
MSS SP-69 (2003; R 2004) Standard for Pipe Hangers and Supports - Selection and Application
1.2 SYSTEM DESCRIPTION
Provide the water systems having the minimum service (design) temperature-pressure rating indicated. Provision of the piping systems, including materials, installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with the required and advisory provisions of ASME B31.9 except as modified or supplemented by this specification section or design drawings. This specification section covers the water systems piping which is located within, the building.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following submitted in accordance with Section 01 00 00:
SD-03 Product Data
SD-06 Test Reports
Piping welds NDE report
Pressure tests reports; G
Report shall be provided in bound (216 by 279 mm) 8 1/2 by 11 inch booklets. In the reports, document all phases of the tests performed. Include ini t ia l tes t summaries, a l l repairs/adjustments made, and the final test results.
SD-07 Certificates
Employer's Record Documents (For Welding) Welding Procedures and Qualifications
HEATING WATER PIPING SYSTEMS 23 64 26-6
Certificates shall be submitted for the following items showing conformance with the referenced standards contained in this section.
Fittings Unions Flanges Gaskets Bolting
SD-08 Manufacturer's Instructions
Lesson plan for the Instruction Course; G
1.4 MODIFICATIONS TO REFERENCES
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.
1.4.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions shall be considered mandatory, the word "should" shall be interpreted as "shall." Reference to the "code official" shall be interpreted to mean the "Contracting Officer." References to the "permit holder" shall be interpreted to mean the "Contractor."
1.4 .2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, shall be applied appropr ia te ly by the Contract ing Off icer as author ized by his administrative cognizance and the FAR.
1.5 SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices shall be installed so that proper operation of equipment is not impaired.
1.6 DELIVERY, STORAGE, AND HANDLING
Protect stored items from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation shall be the Contractor's responsibility. Any materials found to be damaged shall be replaced at the Contractor's expense. During installation, cap piping and similar openings to keep out dirt and other foreign matter. Any porous materials found to be contaminated with mold or mildew will be replaced at the Contractor's expense. Non-porous materials found to be contaminated with mold or mildew will be disinfected and cleaned prior to installation.
1.7 PROJECT/SITE CONDITIONS
1.7.1 Verification of Dimensions
HEATING WATER PIPING SYSTEMS 23 64 26-7
The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
1.7.2 Drawings
Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. The Contractor shall carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and shall arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.
1.7.3 Accessibility
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening.
The 2 year use shall include applications of equipment and materials under similar circumstances and of similar size. The 2 years experience shall be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures.
Products having less than a 2 year field service record shall be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. System components shall be environmentally suitable for the indicated locations.
The equipment items shall be supported by service organizations. These service organizations shall be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
2.2 STEEL PIPING
Water piping shall be steel pipe or copper tubing. Provide steel piping with a ANSI/ASME Class 125 service rating, which for 66 degrees C the pressure rating is 1207 kPa 150 degrees F, the pressure rating is 175 psig.
2.2.1 Pipe
Steel pipe, conform to ASTM A 53/A 53M, Schedule 40, Type E or S, Grades A or B. Do not use Type F pipe.
2.2.2 Fittings and End Connections (Joints)
Piping and fittings (25 mm) 1 inch and smaller shall have threaded connections.
Piping and fittings larger than (25 mm) 1 inch and smaller than (80 mm) 3 inches shall have either threaded, or welded connections. Piping and fittings (80 mm) 3 inches and larger shall have welded, or flanged connections. The manufacturer of each fitting shall be permanently identified on the body of the fitting in accordance with
MSS SP-25.
HEATING WATER PIPING SYSTEMS 23 64 26-8
2.2.2.1 Threaded Connections
Use threaded valves and pipe connections conforming to ASME B1.20.1. Used threaded fitting conforming to ASME B16.3. Use threaded unions conforming to ASME B16.39. Use threaded pipe nipples conforming to ASTM A 733.
2.2.2.2 Flanged Connections
Flanges shall conform to ASME B16.1, Class 150. Gaskets shall be nonasbestos compressed material in accordance with ASME B16.21, (1.59
mm) 1/16 inch thickness, full face or self-centering flat ring type. These gaskets shall contain aramid fibers bonded with styrene butadeine rubber (SBR) or nitrile butadeine rubber (NBR). Bolts, nuts, and bolt patterns shall conform to ASME B16.1.
2.2.2.3 Welded Connections
Welded valves and pipe connections (both butt-welds and socket-welds types) shall conform to ASME B31.9. Butt-welded fittings shall conform to ASME B16.9. Socket-welded fittings shall conform to ASME B16.11. Welded fittings shall be identified with the appropriate grade and marking symbol.
2.2.2.4 Dielectric Waterways and Flanges
Provide dielectric waterways with a water impervious insulation barrier capable of limiting galvanic current to 1 percent of short circuit current in a corresponding bimetallic joint. When dry, insulation barrier shall be able to withstand a 600-volt breakdown test. Provide dielectric waterways constructed of galvanized steel and have threaded end connections to match connecting piping.
Dielectric waterways shall be suitable for the required operating pressures and temperatures. Provide dielectric flanges with the same pressure ratings as standard flanges and provide complete electrical isolation between connecting pipe and/or equipment as described herein for dielectric waterways.
2.3 COPPER TUBING
Provide copper tubing and fittings with a ANSI/ASME Class 125 service rating, which for 66 degrees C, the pressure rating is 1207 kPa 150 degrees F., the pressure rating is 175 psig.
2.3.1 Tube
Use copper tube conforming to ASTM B 88M ASTM B 88, Type L or M for aboveground tubing, and Type K for buried tubing.
2.3.2 Fittings and End Connections (Solder and Flared Joints)
Wrought copper and bronze solder joint pressure fittings, including unions ands flanges, shall conform to ASME B16.22 and ASTM B 75M ASTM B 75. Provide adapters as required. Cast copper alloy solder-joint pressure fittings , including unions and flanges, shall conform to ASME B16.18. Cast copper alloy fittings for flared copper tube shall conform to
ASME B16.26 and ASTM B 62. ASTM B 42 copper pipe nipples with threaded end connections shall conform to ASTM B 42.
Copper tubing of sizes larger than 100 mm 4 inches shall have brazed joints. Brass or bronze adapters for brazed tubing may be used for connecting tubing to flanges and to threaded ends of valves and equipment.
HEATING WATER PIPING SYSTEMS 23 64 26-9
Extracted brazed tee joints may be used if produced with an acceptable tool and installed in accordance with tool manufacturer's written procedures.
2.3.3 Solder
Provide solder in conformance with ASTM B 32, grade Sb5, tin-antimony alloy.
Solder flux shall be liquid or paste form, non-corrosive and conform to ASTM B 813.
2.3.4 Brazing Filler Metal
Filler metal shall conform to AWS A5.8/A5.8M, Type Bag-5 with AWS Type 3 Flux, except Type BCuP-5 or BCuP-6 may be used for brazing copper-to-copper joints.
2.4 RELATED COMPONENTS/SERVICES
2.4.1 Field Applied Insulation
Requirements for field applied insulation is specified in Section 23 07 00 THERMAL
INSULATION FOR MECHANICAL SYSTEMS.
2.4.2 Field Painting
Requirements for painting of surfaces not otherwise specified, and finish painting of items only primed at the factory, are specified in Section 09 90 00.00 40 PAINTS
AND COATINGS.
2.4.3 Color Coding
Requirements for color coding for piping identification are specified in Section 09 90
00.00 40 PAINTS AND COATINGS.
PART 3 EXECUTION
3.1 INSTALLATION
Cut pipe accurately to measurements established at the jobsite, and work into place without springing or forcing, completely clearing all windows, doors, and other openings. Cutting or other weakening of the building structure to facilitate piping installation is not permitted without written approval. Cut pipe or tubing square, remove burrs by reaming, and fashion to permit free expansion and contraction without causing damage to the building structure, pipe, joints, or hangers.
Notify the Contracting Officer in writing at least 15 calendar days prior to the date the connections are required. Obtain approval before interrupting service. Furnish materials required to make connections into existing systems and perform excavating, backfilling, compacting, and other incidental labor as required. Furnish labor and tools for making actual connections to existing systems.
3.1.1 Welding
Provide welding work specified this section for piping systems in conformance with ASME B31.9, as modified and supplemented by this specification section and the accompanying drawings. The welding work includes: qualification of welding procedures, welders, welding operators, brazers, brazing operators, and nondestructive examination personnel; maintenance of welding records, and examination methods for welds.
3.1.1.1 Employer's Record Documents (For Welding)
HEATING WATER PIPING SYSTEMS 23 64 26-10
Submit for review and approval the following documentation. This documentation and the subject qualifications shall be in compliance with ASME B31.9.
a. List of qualified welding procedures that is proposed to be used to provide the work specified in this specification section.
b. List of qualified welders, brazers, welding operators, and brazing operators that are proposed to be used to provide the work specified in this specification section.
c. List of qualified weld examination personnel that are proposed to be used to provide the work specified in this specification section.
3.1.1.2 Welding Procedures and Qualifications
a. Specifications and Test Results: Submit copies of the welding procedures specifications and procedure qualification test results for each type of welding required. Approval of any procedure does not relieve the Contractor of the responsibility for producing acceptable welds.
Submit this information on the forms printed in ASME BPVC SEC IX or their equivalent.
b. Certification: Before assigning welders or welding operators to the work, submit a list of qualified welders, together with data and certification that each individual is performance qualified as specified. Do not start welding work prior to submitting welder, and welding operator qualifications. The certification shall state the type of welding and positions for which each is qualified, the code and procedure under which each is qualified, date qualified, and the firm and individual certifying the qualification tests.
3.1.1.3 Welding Safety
Welding and cutting safety requirements shall be in accordance with
AWS Z49.1.
3.1.2 Directional Changes
Make changes in direction with fittings, except that bending of pipe 100 mm 4 inches and smaller is permitted, provided a pipe bender is used and wide weep bends are formed.
Mitering or notching pipe or other similar construction to form elbows or tees is not permitted. The centerline radius of bends shall not be less than 6 diameters of the pipe.
Bent pipe showing kinks, wrinkles, flattening, or other malformations is not acceptable.
3.1.3 Functional Requirements
Pitch horizontal supply mains down in the direction of flow as indicated. The grade shall not be less than (2 mm in 1 m) 1 inch in 40 feet. Reducing fittings shall be used for changes in pipe sizes. Cap or plug open ends of pipelines and equipment during installation to keep dirt or other foreign materials out of the system.
Pipe not otherwise specified shall be uncoated. Connections to appliances shall be made with malleable iron unions for steel pipe (65 mm) 2-1/2 inches or less in diameter, and with flanges for pipe (80 mm) 3 inches and above in diameter. Connections between ferrous and copper piping shall be electrically isolated from each other with dielectric waterways or flanges.
Equipment and piping arrangements shall fit into space allotted and allow adequate
HEATING WATER PIPING SYSTEMS 23 64 26-11
acceptable clearances for installation, replacement, entry, servicing, and maintenance. Electric isolation fittings shall be provided between dissimilar metals.
3.1.4 Fittings and End Connections
3.1.4.1 Threaded Connections
Threaded connections shall be made with tapered threads and made tight with PTFE tape complying with ASTM D 3308 or equivalent thread-joint compound applied to the male threads only. Not more than three threads shall show after the joint is made.
3.1.4.2 Brazed Connections
Brazing, AWS BRH, except as modified herein. During brazing, the pipe and fittings shall be filled with a pressure regulated inert gas, such as nitrogen, to prevent the formation of scale. Before brazing copper joints, both the outside of the tube and the inside of the fitting shall be cleaned with a wire fitting brush until the entire joint surface is bright and clean. Do not use brazing flux. Surplus brazing material shall be removed at all joints. Steel tubing joints shall be made in accordance with the manufacturer's recommendations. Piping shall be supported prior to brazing and not be sprung or forced.
3.1.4.3 Welded Connections
Branch connections shall be made with welding tees or forged welding branch outlets. Pipe shall be thoroughly cleaned of all scale and foreign matter before the piping is assembled. During welding, the pipe and fittings shall be filled with an inert gas, such as nitrogen, to prevent the formation of scale. Beveling, alignment, heat treatment, and inspection of weld shall conform to ASME B31.9. Weld defects shall be removed and rewelded at no additional cost to the Government. Electrodes shall be stored and dried in accordance with AWS D1.1/D1.1M or as recommended by the manufacturer. Electrodes that have been wetted or that have lost any of their coating shall not be used.
3.1.4.4 Flanges and Unions
Except where copper tubing is used, union or flanged joints shall be provided in each line immediately preceding the connection to each piece of equipment or material requiring maintenance such as coils, pumps, control valves, and other similar items. Flanged joints shall be assembled square end tight with matched flanges, gaskets, and bolts. Gaskets shall be suitable for the intended application.
3.1.5 Valves
Isolation gate or ball valves shall be installed on each side of each piece of equipment, at the midpoint of all looped mains, and at any other points indicated or required for draining, isolating, or sectionalizing purpose. Isolation valves may be omitted where balancing cocks are installed to provide both balancing and isolation functions. Each valve except check valves shall be identified. Valves in horizontal lines shall be installed with stems horizontal or above.
3.1.6 Air Vents
Air vents shall be provided at all high points, on all water coils, and where indicated to ensure adequate venting of the piping system.
3.1.7 Drains
HEATING WATER PIPING SYSTEMS 23 64 26-12
Drains shall be provided at all low points and where indicated to ensure complete drainage of the piping. Drains shall be accessible, and shall consist of nipples and caps or plugged tees unless otherwise indicated.
3.1.8 Pipe Hangers, Inserts, and Supports
Pipe hangers, inserts, and supports shall conform to MSS SP-58 and MSS SP-69, except as supplemented and modified in this specification section. Pipe hanger types 5, 12, and 26 shall not be used. Hangers used to support piping 50 mm (2 inches) 2 inches and larger shall be fabricated to permit adequate adjustment after erection while still supporting the load. Piping subjected to vertical movement, when operating temperatures exceed ambient temperatures, shall be supported by variable spring hangers and supports or by constant support hangers.
3.1.8.1 Hangers
Type 3 shall not be used on insulated piping. Type 24 may be used only on trapeze hanger systems or on fabricated frames.
3.1.8.2 C-Clamps
Type 19 and 23 C-clamps shall be torqued per MSS SP-69 and have both locknuts and retaining devices, furnished by the manufacturer.
Field-fabricated C-clamp bodies or retaining devices are not acceptable.
3.1.8.3 Angle Attachments
Type 20 attachments used on angles and channels shall be furnished with an added malleable-iron heel plate or adapter.
3.1.8.4 Saddles and Shields
Where Type 39 saddle or Type 40 shield are permitted for a particular pipe attachment application, the Type 39 saddle, connected to the pipe, shall be used on all pipe (100 mm)4 inches and larger when the temperature of the medium is (16 degrees C) 60 degrees F or higher. Type 40 shields shall be used on all piping less than (100 mm) 4 inches and all piping 100 mm4 inches and larger carrying medium less than (16 degrees C) 60 degrees F. A high density insulation insert of cellular glass shall be used under the Type 40 shield for piping 50 mm 2 inches and larger.
3.1.8.5 Horizontal Pipe Supports
Horizontal pipe supports shall be spaced as specified in MSS SP-69 and a support shall be installed not over (300 mm) 1 foot from the pipe fitting joint at each change in direction of the piping. Pipe supports shall be spaced not over 1.5 m 5 feet apart at valves. Pipe hanger loads suspended from steel joist with hanger loads between panel points in excess of 23 kg 50 pounds shall have the excess hanger loads suspended from panel points.
3.1.8.6 Pipe Guides
Type 35 guides using, steel, reinforced polytetrafluoroethylene (PTFE) or graphite slides shall be provided where required to allow longitudinal pipe movement.
Lateral restraints shall be provided as required. Slide materials shall be suitable for the system operating temperatures, atmospheric conditions, and bearing loads encountered.
3.1.8.7 Steel Slides
HEATING WATER PIPING SYSTEMS 23 64 26-13
Where steel slides do not require provisions for restraint of lateral movement, an alternate guide method may be used. On piping (100 mm) 4 inches and larger, a Type 39 saddle shall be used. On piping under (100 mm) 4 inches, a Type 40 protection shield may be attached to the pipe or insulation and freely rest on a steel slide plate.
3.1.8.8 Multiple Pipe Runs
In the support of multiple pipe runs on a common base member, a clip or clamp shall be used where each pipe crosses the base support member. Spacing of the base support members shall not exceed the hanger and support spacing required for an individual pipe in the multiple pipe run.
3.1.8.9 Seismic Requirements
Piping and attached valves shall be supported and braced to resist seismic loads as specified by SMACNA Seismic Restraint Manual: Guidelines for Mechanical Systems. Structural steel required for reinforcement to properly support piping, headers, and equipment but not shown shall be provided under this section.
Material used for support shall be as specified under Section 05 12 00
STRUCTURAL STEEL.
3.1.8.10 Structural Attachments
Attachment to building structure concrete and masonry shall be by cast-in concrete inserts, built-in anchors, or masonry anchor devices. Inserts and anchors shall be applied with a safety factor not less than 5. Supports shall not be attached to metal decking. Supports shall not be attached to the underside of concrete filled floors or concrete roof decks unless approved by the Contracting Officer.
Masonry anchors for overhead applications shall be constructed of ferrous materials only. Structural steel brackets required to support piping, headers, and equipment, but not shown, shall be provided under this section. Material used for support shall be as specified under Section 05 12 00 STRUCTURAL STEEL.
3.2 ELECTRICAL INSTALLATION
Install electrical equipment in accordance with NFPA 70 and manufacturer’s instructions.
3.3 CLEANING AND ADJUSTING
Pipes shall be cleaned free of scale and thoroughly flushed of all foreign matter. A temporary bypass shall be provided for all water coils to prevent flushing water from passing through coils.
Strainers and valves shall be thoroughly cleaned. Prior to testing and balancing, air shall be removed from all water systems by operating the air vents. Temporary measures, such as piping the overflow from vents to a collecting vessel shall be taken to avoid water damage during the venting process. Air vents shall be plugged or capped after the system has been vented.
Control valves and other miscellaneous equipment requiring adjustment shall be adjusted to setting indicated or directed.
3.4 FIELD TESTS
Field tests shall be conducted in the presence of the QC Manager or his designated representat ive to ver ify systems compliance with specifications. Any material, equipment, instruments, and personnel required for the test shall be provided by the Contractor.
3.4.1 Equipment and Component Isolation
Prior to testing, equipment and components that cannot withstand the tests shall be properly
HEATING WATER PIPING SYSTEMS 23 64 26-14
isolated.
3.4.2 Pressure Tests
Each piping system shall be hydrostatically tested at a pressure not less than (1297 kPa) (gage)188 psig for period of time sufficient to inspect every joint in the system and in no case less than 2 hours. Test pressure shall be monitored by a currently calibrated test pressure gauge. Leaks shall be repaired and piping retested until test requirements are met.
No leakage or reduction in gage pressure shall be allowed.
Leaks shall be repaired by rewelding or replacing pipe or fittings. Caulking of joints will not be permitted. Concealed and insulated piping shall be tested in place before concealing.
Submit for approval pressure tests reports covering the above specified piping pressure tests; describe the systems tested, test results, defects found and repaired, and signature of the pressure tests' director. Obtain approval from the QC Manager before concealing piping or applying insulation to tested and accepted piping.
3.4.3 Related Field Inspections and Testing
3.4.3.1 Piping Welds
Examination of Piping Welds is specified in the paragraph above entitled "Examination of Piping Welds".
3.4.3.2 HVAC TAB
Requirements for testing, adjusting, and balancing (TAB) of HVAC water piping, and associated equipment is specified in Section 23 05 93 TESTING,ADJUSTING, AND BALANCING. Coordinate with the TAB team, and provide support personnel and equipment as specified in Section 23 05 93 TESTING, ADJUSTING AND BALANCING to assist TAB team to meet the TAB work requirements.
3.5 INSTRUCTION TO GOVERNMENT PERSONNEL
Furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the heating water piping system.
Instructors shall be thoroughly familiar with all parts of the installation and shall be instructed in operating theory as well as practical operation and maintenance work.
Conduct a training course for the operating staff and maintenance staff selected by the Contracting Officer. Give the instruction during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished shall be one/half man-day. Use approximately half of the time for classroom instruction and the other time for instruction at the location of equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
-- End of Section --