004 CDRL Data Rights.pdf

PDF 99 KB Posted

Attached to
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation number
FA8137-26-R-0040
Issued by

About this file

This document is a PDF file display error message. The document failed to render properly and contains only Adobe Reader troubleshooting instructions and trademark information. No contract opportunity details, solicitation information, or substantive content is available in this file. To access the actual contract document, the PDF file must be re-submitted in a readable format or opened with an updated version of Adobe Reader.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00400005.pdf PDF
Solicitation Amendment FA813726R00400005 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400004.pdf PDF
Solicitation Amendment FA813726R00400004 SF 30.pdf PDF
Questions and Answers 16 Sep 2026.xlsx XLSX spreadsheet
Solicitation FA813726R0040.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Solicitation Amendment - FA813726R00400003.pdf PDF
Solicitation Amendment FA813726R00400003 SF 30.pdf PDF
FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Attachment_2__Section_L 18 Aug 26.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Attachment_2__Section_L 5 Aug 26.pdf PDF
Attachment_3_Section_M_Evaluation_Criteria 29 July 26.pdf PDF
Attachment_2b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX document
Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
003 CDRL - TO Progress Mtg Signed.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafbi13-204.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
Appendix C UMRL.pdf PDF
B2 -TAFB Technical Requirements Div 02-48.pdf PDF
Attachment 1 - Statement of Work Jun26.pdf PDF
Solicitation - FA813726R0040.pdf PDF
Attachment_2__Section_L 29 Jul 26.pdf PDF
Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix 06 May 26.xlsx XLSX spreadsheet
Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix 06 May 26.xlsx XLSX spreadsheet
001 CDRL - Organization Chart Signed.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
UFC Binder 1.pdf PDF
TAFB Gen Specs Reference 1.pdf PDF
afi48-104.pdf PDF
Appendix B1 TAFB General Requirements Div 00-01.pdf PDF
Appendix A - Abbreviations.pdf PDF
Attachment_2a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX spreadsheet
Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
002 CDRL - Quaterly Progress Mtg Signed.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
TAFB Facility Standards.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of (Updated 20260512) Instructions

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of (Updated 20260512)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
show:
hide:
A. CONTRACT LINE ITEM NUMBER: CLIN 006
exhibit:
C. CATEGORY: Select for "TDP.": 1
C. CATEGORY: Select for "TM.": 1
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.": Provisioning, O&M Manuals, Config.
System: MACC IDIQ
ContractNum:
Contractor: TDB
1. DATA ITEM NUMBER: A001
titleDataItem: Data Accession List
subtitle: N/A
4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-81453C
contractRef: SOW Sections 7, 11
reqOffice: 72 ABW/CE
7. DD 250 REQUIREMENT: DD
8. APPROVAL CODE : A
9. DISTRIBUTION STATEMENT REQUIRED: D
freq: MTHLY
asOfDate: N/A
dateFirstSub: 30 DAC
dateSubseqSub: SEE BLK 16
16. REMARKS: Block 4: The content requirements of the DID are tailored to require the delivery of the elements in accordance with PWS Sections 7 and 11, with sufficient details such that the Government can not only assess and understand how the Contractor intends to meet all requirements outlined in the PWS, but also asserts ownership of the said data.

Block 9: All products produced as a result of this CDRL shall have a Distribution Statement of "D", unless an Original or Derivative Classifier promotes the document to a classified disposition, and requires a Distribution Statement other than "D", at which time the appropriate markings and Distribution statements shall be applied.

Block 13: Date of subsequent submissions will not exceed the 30 days after the first submission. Requests for additional time to be approved by the Government.

The Government retains the rights to the data produced as part of The data shall be in electronically delivered-reproducible Microsoft Office format (unless otherwise approved by the Government) to the contracting officer and the 72 ABW/CE.

Click to add/remove continuation field for Remarks:
Click to delete CURRENT data items for 1 through 18, unless this is the only data item.:
Click to add a page of data items for 1 through 18 immediately following the current page.:
14. DISTRIBUTION - a. ADDRESSEE, new line: 72 ABW/CE
15.TOTAL - Total draft copies is automatically calculated.: 1
15.TOTAL - Total draft copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 2
15.TOTAL - Total final regular copies is automatically calculated.: 2
15.TOTAL - Total final reproducible copies is automatically calculated.: 1
15.TOTAL - Total final reproducible copies is automatically calculated.: 1
priceGrp:
estTotalPrice:
remarks_cont:
preparedBy: Arnaud Kouemo
H. SIGNATURE: H. SIGNATURE
H. SIGNATURE:
approvedBy: Ray Green
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
Click to add additional data items 1 through 18 to the end of the form.:

File details come from the government source that posted it. Updated .