Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx
XLSX spreadsheet 84 KB Posted
- Solicitation number
- FA8137-26-R-0040
About this file
This file is a cross-reference matrix appendix that establishes correlations between Fields of Competition (FOC) categories and the scope of work for the Tinker AFB 2026 Multiple Award Construction Contract (MACC). The matrix serves as a reference tool to map specific construction service requirements, project types, and work categories to their corresponding FOC classifications within the IDIQ contract structure. This document functions as a technical reference guide rather than a substantive statement of requirements or deliverables.
The matrix does not specify pricing terms, response dates, or award dates, as these elements are addressed in the primary RFP (FA8137-26-R-0040). Instead, the appendix provides organizational structure to assist potential contractors in understanding how various construction and design-build projects under the MACC will be categorized and cross-referenced for evaluation, scheduling, and task order assignment purposes. The document is supplementary to the main solicitation documents and is intended to clarify the relationship between different work categories and competition requirements.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Score Sheet
| Air Force Sustainment Center PZIOC MACC |
| Solicitation No.: FA813726R0040 |
| Appendix D to Section L, Cross Reference Matrix |
| Element | Offeror to Fill per Column C, Appendix C | Deliverables | Work Sample Number | Reference | |
| Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable) | Notes / Clarifications (Optional) |
Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents
| EXAMPLE | $ | |||||
| Instruction to Offeror Paragraph | Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | 3 | Contract, SOW | WS2 | Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) | DD Form 1155s Block 24 shows effective date of work sample and contract value |
SOW shows nature of work Add rows as necessary 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work
| Instruction to Offeror Paragraph | Section 1 – RELEVANT CONSTRUCTION EXPERIENCE | |
| Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025) | ||
| Category 1 | Commercial, Industrial & Residential Bldg. Multi Trade | |
| Paragraph 5.2.1.1.1. | Submit a Project for each threshold, up to 4 total multiple trade projects for each | 0-4 Projects |
| Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts. | ||
| Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts | ||
| Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts. | ||
| Paragraph 5.2.1.1.2 | Identify the number of trades according the Tinker AFB Facility, Mechanical, Fire Protection and Electrical Standards managed for each project above | 0-12 Projects |
| Number of trades <5 Note: each project submitted receives a max point value of 50pts. | ||
| Number of trades 5-10 Note: each project submitted receives a max point value of 200pts. | ||
| Number of trades >10 Note: each project submitted receives a max point value of 300pts. | ||
| Category 2 | Construction for the US Government | |
| Paragraph 5.1.1.2. | Submit a Project executed for the US Government for each threshold, up to 4 total projects for each | 0-4 Projects |
| Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts. | ||
| Category 3 | Multiple Construction Multi Trade | |
| Paragraph 5.1.1.3. | Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according to UFC and ICC or standards | 2-5 Projects |
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts. | ||
| Category 4 | Utility System Construction (e.g. distribution lines, power plants, utility distribution bldgs. etc.) | |
| Paragraph 4.6.1.4. | Submit a Project for each threshold, up to 3 total projects for each | 0-3 Projects |
| Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts. | ||
| Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | ||
| Category 5 | Construction in secured areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.) | |
| Paragraph 4.6.1.5. | Submit a Project for each threshold, up to 3 total projects for each | 0-3 Projects |
| Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts. | ||
| Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | ||
| Category 6 | Individual Trade (Individual trade shall be at least 60% of total project) | |
| Paragraph 4.6.1.6. | Submit a Project for each threshold, up to 2 total individual trade projects for each | 0-2 Projects |
| Prime Contractor Under $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts. | ||
| Prime Contractor Under $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | ||
| Prime Contractor Over $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | ||
| Instruction to Offeror Paragraph | Section 2 - DESIGN EXPERIENCE | |
| Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025) | ||
| Category 7 | Experience as Prime on Design-Build Projects (KTR Designing then Building) | |
| Paragraph 5.1.2.1. | Submit a Project with Design Build effort, up to 2 total projects | 0-2 Projects |
| Prime Contractor over $1M: Note: each project submitted receives a max point value of 400pts. | ||
| Instruction to Offeror Paragraph | Section 4 - STAFFING | |
| Category 9 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |
| Paragraph 5.1.4.1. | Trade/Construction Workers | |
| Submit number of personnel, pick only one | Yes or No | |
| 1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | ||
| Paragraph 5.1.4.2. | Architects/Engineers | |
| Submit number of personnel, pick only one | ||
| 1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | ||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 4.6.4.3. | Certified Safety Manager | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 4.6.4.4. | Certified Building Energy Consultant | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 4.6.4.5. | Certified Fire Protection Specialist | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 4.6.4.6. | Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances) | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Instruction to Offeror Paragraph | Section 5 - GEOGRAPHIC EXPERTISE | |
| Category 11 | Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | |
| Paragraph 4.6.5.1. | Existing office within | Yes or No |
| Certificate: Only one Yes which = 200pts max /No = 0pts. | ||
| Paragraph 4.6.5.2. | Existing office within | |
| Certificate: Only one Yes which = 200pts max /No = 0pts. |
Remarks: For Section 1 & 2 Projects can be submitted multiple times