Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix 06 May 26.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation number
FA8137-26-R-0040
Issued by

About this file

This file is a Self Scoring Matrix (Appendix D) for the Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) solicitation (FA8137-26-R-0040 and FA8137-25-R-0013). It establishes the evaluation criteria and point allocation methodology that offerors must use to self-score their qualifications across four primary evaluation categories with a maximum total score of 10,200 points and a minimum required score of 7,140 points.

The scoring matrix evaluates relevant construction experience (5,800 points maximum), design experience (1,800 points maximum), certifications (1,200 points maximum), and staffing capabilities (1,400 points maximum). Under construction experience, offerors may earn points by submitting completed projects in four categories: commercial/industrial/residential building multi-trade projects (up to 1,800 points), Department of Work construction projects (up to 1,200 points), multiple parallel construction projects (up to 400 points), and specialized construction including security measures, fire protection, roofing, airfield construction, and other infrastructure (up to 600 points). Design experience scoring requires submission of design-build projects with complete specifications, drawings, and calculations complying with Unified Facilities Criteria and International Code Council standards. The certifications category awards points for Project Management Professional, architect, engineer, LEED, safety, and quality professional credentials, with each certification worth 100-200 points. The staffing category evaluates the offeror's in-house personnel across seven functional areas including trade workers, architects/engineers, program managers, quality control managers, safety managers, and superintendents, with points awarded based on staffing levels exceeding specified thresholds.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00400005 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400005.pdf PDF
Solicitation Amendment FA813726R00400004 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400004.pdf PDF
Questions and Answers 16 Sep 2026.xlsx XLSX spreadsheet
Solicitation FA813726R0040.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Solicitation Amendment - FA813726R00400003.pdf PDF
Solicitation Amendment FA813726R00400003 SF 30.pdf PDF
FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx XLSX spreadsheet
Attachment_2__Section_L 18 Aug 26.pdf PDF
Solicitation Amendment FA813726R00400002 SF 30.pdf PDF
Solicitation Amendment - FA813726R00400002.pdf PDF
Attachment_2__Section_L 5 Aug 26.pdf PDF
Solicitation Amendment - FA813726R00400001.pdf PDF
Solicitation Amendment FA813726R00400001 SF 30.pdf PDF
Attachment_3_Section_M_Evaluation_Criteria 29 July 26.pdf PDF
Attachment_2b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX document
Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
003 CDRL - TO Progress Mtg Signed.pdf PDF
Attachment_2a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX spreadsheet
Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
002 CDRL - Quaterly Progress Mtg Signed.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
TAFB Facility Standards.pdf PDF
004 CDRL Data Rights.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafbi13-204.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
Appendix C UMRL.pdf PDF
B2 -TAFB Technical Requirements Div 02-48.pdf PDF
Attachment 1 - Statement of Work Jun26.pdf PDF
Solicitation - FA813726R0040.pdf PDF
Attachment_2__Section_L 29 Jul 26.pdf PDF
Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix 06 May 26.xlsx XLSX spreadsheet
001 CDRL - Organization Chart Signed.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
tinkerafbi21-100.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
UFC Binder 1.pdf PDF
TAFB Gen Specs Reference 1.pdf PDF
afi48-104.pdf PDF
Appendix B1 TAFB General Requirements Div 00-01.pdf PDF
Appendix A - Abbreviations.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Air Force Sustainment Center PZIOC MACC
Solicitation No.: FA813725R0013FA813726R0040
Appendix D to Section L, Self Scoring Matrix

Element Offeror to Fill This Column Only Point Value Score

Instruction to Offeror Paragraph Section 1 – RELEVANT CONSTRUCTION EXPERIENCE

Relevant Experience Projects: (The submitted projects must meet the conditions listed, cannot be awarded prior to 1 May 2021, and at least 80% complete as of solicitation date)
Category 1Commercial, Industrial & Residential Bldg. Multi Trade
Paragraph 5.1.1.1.1Submit a Project for each threshold (minimum of 1, up to 6 total) multiple trade projects for each threshold1-6 Projects Ea.Point Value EachTotal Across
Prime Contractor over $10M Multiple Trades: Note: each project submitted receives a point value of 300pts.63001800
Paragraph 5.1.1.1.2Identify the number of trades per definitions provided in referenced paragraph.0-6 ProjectsPoint Value EachTotal Across
Number of trades 5-10 Note: each project submitted receives a point value of 200pts.2000
Number of trades >10 Note: each project submitted receives a point value of 300pts.63001800
Category 2Construction for the DoW
Paragraph 5.1.1.2Submit a Project executed for the DoW for each threshold, up to 4 total projects for each0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Over $10M: Note: each project submitted receives a point value of 300pts.43001200
Category 3Multiple Construction Multi Trade
Paragraph 5.1.1.3.Submit 2 to 4 Projects executed in parallel during a period of at least 6 months, with multiple trades as defined in referenced paragraph.2-4 ProjectsPoint Value EachTotal Across
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a point value of 100pts.4100400
Category 4Specialized Construction (specified construction shall be at least 60% of total project)
Paragraph 5.1.1.4.Submit a Project for each threshold, up to 1 total individual trade projects for each0-1 ProjectsPoint Value EachTotal Across
Prime Contractor Over $10M AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a point value of 100pts.1100100
Prime Contractor Over $10M FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a point value of 100pts.1100100
Prime Contractor Over $10M ROAD/PARKING/PAVEMENT CONSTRUCTION: Note: each project submitted receives a point value of 100pts.1100100
Prime Contractor Over $10M HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a point value of 100pts.1100100
Prime Contractor Over $10M ROOFING: Note: each project submitted receives a point value of 100pts.1100100
Prime Contractor Over $10M AIRFIELD CONSTRUCTION: Note: each project submitted receives a point value of 100pts.1100100
SUBTOTAL SCORE FOR THIS SECTION ONLY:5800
Instruction to Offeror ParagraphSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, cannot be awarded prior to 1 May 2021, and at least 80% complete as of solicitation date)
Category 5Experience as Prime on Design-Build Projects (KTR Designing then Building)
Paragraph 5.1.2.1.Submit a Project with Design Build effort, up to 2 total projects0-2 ProjectsPoint Value EachTotal Across
Prime Contractor over $10M construction cost: Note: each project submitted receives a max point value of 400pts.2400800
Paragraph 5.1.2.2.For one of the Projects above submit all design documents in compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE)Yes or NoPoint Value EachTotal Across
Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 20pts.
Interior and exterior walls (vertical construction elements)yes2020
Ceilings (horizontal construction elements)yes2020
Roofsyes2020
Waste water, water, and gas systemsyes2020
Fire-extinguishing systemsyes2020
Heat-supply systemsyes2020
HVAC systemsyes2020
Electrical systemsyes2020
Communications, security and information systemsyes2020
Building automation and automation of engineering structuresyes2020
Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts.
Interior and exterior walls (vertical construction elements)yes4040
Ceilings (horizontal construction elements)yes4040
Roofsyes4040
Waste water, water, and gas systemsyes4040
Fire-extinguishing systemsyes4040
Heat-supply systemsyes4040
HVAC systemsyes4040
Electrical systemsyes4040
Communications, security and information systemsyes4040
Building automation and automation of engineering structuresyes4040
Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 40pts.
Interior and exterior walls (vertical construction elements)yes4040
Ceilings (horizontal construction elements)yes4040
Roofsyes4040
Waste water, water, and gas systemsyes4040
Fire-extinguishing systemsyes4040
Heat-supply systemsyes4040
HVAC systemsyes4040
Electrical systemsyes4040
Communications, security and information systemsyes4040
Building automation and automation of engineering structuresyes4040
SUBTOTAL SCORE FOR THIS SECTION ONLY:1800
Instruction to Offeror ParagraphSection 3 - CERTIFICATIONS
Category 6Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 5.1.3.1Certification for Project Management ProfessionalsYes or NoPoint Value EachTotal Across
Certificate: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 4.6.3.2.Certification for Credentialed Professionals
Certificate-Architect: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Civil Engineer: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Structural Engineer: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Mechanical/plumbing Engineer: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Electrical Engineer: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Fire Protection: Only one Yes which = 100pts max /No = 0pts.yes100100
Certificate-Interior Desgin (ref UFC 3-120-10): Only one Yes which = 100pts max /No = 0pts.yes100100
Paragraph 5.1.3.2.Certification for LEED Professionals
Certificate: Only one Yes which = 100pts max /No = 0pts.yes100100
Paragraph 5.1.3.3.Certification for Safety Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.yes100100
Paragraph 5.1.3.4.Certification for Quality Professional
Certificate: Only one Yes which = 100pts max /No = 0pts.yes100100
SUBTOTAL SCORE FOR THIS SECTION ONLY:1200
Instruction to Offeror ParagraphSection 4 - STAFFING
Category 7Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column C.
Paragraph 5.1.4.1.Trade/Construction Workers
Submit number of personnel, pick only oneYes or NoPoint Value EachTotal Across
1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.1000
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0ptsyes200200
Paragraph 5.1.4.2.Architects/Engineers
Submit number of personnel, pick only one
1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 5.1.4.3.Contract Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.1000
>1: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 5.1.4.4.Quality Control Manager
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 5.1.4.5.Site Safety and Health Manager
Submit number of personnel, pick only one for each level
Level 1
Only one Yes which = 200pts max /No = 0pts.yes200200
Level 2
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Level 3
1-3: Note: Only one Yes which = 100pts max /No = 0pts.1000
>3: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 5.1.4.6.Design Program Manager
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.1000
>1: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
Paragraph 5.1.4.7.Superintendents
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.1000
>2: Note: Only one Yes which = 200pts max /No = 0pts.yes200200
SUBTOTAL SCORE FOR THIS SECTION ONLY:1400
TOTAL POINTS SCORED10,200
MAXIMUM POINTS10,200
MINIMUM SCORE REQUIRED7,140

File details come from the government source that posted it. Updated .