Tinker General Requirements Specifications_Nov 2022_Change Log.pdf

PDF 94 KB Posted

Attached to
WWYK170123, Repair Roof, Log Facility Dep Ops B201
Solicitation number
FA8137-26-R-0035
Issued by

About this file

This document is a change log for Tinker General Requirements effective August 2022, detailing revisions made to various specification sections and contract requirements.

The most significant changes involve terminology updates throughout multiple sections, where "Contracting Officer" was replaced with "Contracting Officer's Representative" (COR) to reflect current contracting authority structures. Section 01 33 00 received the most substantive modifications, including a new definition of Contracting Officer's Representative in Section 1.2.3, and updates to Sections 1.4.2.1, 1.5.1, 1.5.3.3.2, 1.5.3.8.1, and 1.14 to reference the COR or designated alternate. Additional changes in Section 1.5.5 added language specifying that file naming conventions are detailed in contract documents, clarifying that the COR can modify submittal format requirements to PDF, and adding DOD Safe as an approved means for transmittal. Sections 1.8.2 and 1.8.7 modified submittal register requirements, with the register now required only with the final design submittal rather than monthly updates. Attachment 1 replaced AF Form 3000 with the new TAFB Form 3000. Section 01 78 00 underwent similar COR-related updates across Sections 1.2.1, 1.7.1, 1.7.2, and 1.7.3, while Section 1.4 changed the reference from "Interim DD Form 1354" to "DD Form 1354" and Section 3.6 added attachment references. Sections 00 70 00, 00 71 00, 00 72 00, 00 80 00, 00 80 05, 01 32 16.00 20, 01 33 16.00 10, 01 42 00, 01 45 00.00 10, 01 50 00, and 01 78 23 contained no changes.

View the file

Other files

File Type Posted
WWYK170123 B201 Roof Repair RFIs.pdf PDF
00 72 00.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
01 32 16.00 20.pdf PDF
Core Samples.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
00 80 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 45 00.00 10.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Mechanical Standard.pdf PDF
01 33 00.pdf PDF
00 80 05.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 50 00.pdf PDF
WWYK170123 Site Visit Sign in.pdf PDF
Wage Determination.pdf PDF
Solicitation - FA813726R0035.pdf PDF
Att9_170123_Liquidated Damages Signed.pdf PDF
Att11_170123_Submittal Register_ROOF_v0.pdf PDF
Att12_170123-Drawings_2026.pdf PDF
Att10_170123 MACB Roofing SOW.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker General Requirements Change Log – Aug 2022

00 70 00 No Changes

00 71 00 No Changes

00 72 00 No Changes

00 80 00 No Changes

00 80 05 No Changes

01 32 16.00 20 No Changes

01 33 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’

Section 1.2.3. Added definition of ‘Contracting Officers Representative.’

Section 1.4.2.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.1. First sentence revised for clarity.

Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.3.3.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.5.3.8.1. Added ‘and/or the Contracting Officer or designated alternate.’

Section 1.5.5. Multiple Changes

- Added Language specifying that file naming convention are specified in contract documents.

- Added language specifying that the COR can change requirement for submittals in PDF format.

- Added DOD Safe as means for transmittal of submittals.

Section 1.8.2. Changed requirement that Contractor’s Submittal Register must be submitted with final design submittal.

Section 1.8.7. Changed requirement that updated Submittal Register must be submitted monthly.

Section 1.14. Added ‘and/or Contracting Officer’s Representative.’

Attachment 1. Replaced AF Form 3000 with new TAFB Form 3000.

01 33 16.00 10 No Changes.

01 42 00 No Changes.

01 45 00.00 10 No Changes.

01 50 00 No Changes

01 78 00 Throughout document, changed ‘Contracting Officer’ to ‘Contracting Officers Representative.’

Section 1.1. Updated references as required to reflect most current.

Section 1.2.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.4. Changed ‘Interim DD Form 1354’ to ‘DD Form 1354.’

Section 1.7.1. Added ‘and/or Contracting Officer’s Representative.’

Section 1.7.2. Added ‘and/or Contracting Officer’s Representative.’

Section 1.7.3. Added ‘and/or Contracting Officer’s Representative.’

Section 3.6. Added ‘attachment’ references.

01 78 23 No Changes