This file is a Self-Score Sheet and Cross Reference Matrix for the Tinker Air Force Base Multiple Award Construction Contract (MACC) Solicitation FA8137-25-R-0013, serving as Appendix D to Section L of the RFP. It functions as a scoring template and evaluation guide for offerors submitting relevant experience and qualifications.

The matrix establishes evaluation criteria across five primary categories: (1) Relevant Construction Experience, including commercial/industrial/residential building, U.S. Government construction projects, parallel multi-trade construction, utility system construction, secured area construction, and individual trade specializations; (2) Design Experience as prime on design-build projects; (3) Staffing qualifications including trade/construction workers, architects/engineers, and certified specialists (Safety Managers, Building Energy Consultants, Fire Protection Specialists, and Hazardous Materials Abatement); and (4) Geographic Expertise with existing office locations. Each project submission receives a maximum point value ranging from 100 to 400 points depending on project complexity and contractor size thresholds (under $250K, $250K-$1.0M, $1.0M+, $500K+, or $750K+). Offerors must submit work samples within the last 10 years of the RFP release date with at least 80 percent completion by March 31, 2025. Projects must be referenced using DD Forms 1155, Statements of Work, and supporting documentation. The matrix allows submission of multiple projects per category (ranging from 0-12 depending on category) and includes specialized construction experience areas such as AT/FP measures, fire protection/suppression systems, roofing, airfield construction, and HEMP shielding/collective protection systems.

View the file

Other files

File Type Posted
Attachment_3__Section_L_ 4 May 26.pdf PDF
Copy of Attachment_3c_Appendix_C_MACC_SBSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
Copy of Attachment_3e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
Table 1 Historical Project Magnitude Information.docx DOCX document
Table 2 Anticipated Project Magnitude Information.docx DOCX document
Attachment_4_Section_M_Evaluation_Criteria 4 May 26.pdf PDF
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX document
Copy of Attachment_3d_Appendix_D_MACC_FOSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
Attachment_3__Section_L_Instructions_to_Offerors 4 May 26.pdf PDF
MACC Section L and M Industry Feedback.docx DOCX document
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX spreadsheet
MACC RFI Responses 12 Feb 26.pdf PDF
MACC RFIs 06 Jan 26.pdf PDF
Attachment_3e_Appendix_E_Past_Performance_Information_Sheet.pdf PDF
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.pdf PDF
Attachment_3__Section_L_Instructions_to_Offerors 22 Sept.pdf PDF
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures.pdf PDF
Section M 22 Sep 25.pdf PDF
Attachment_3d_Appendix_D_MACC_Cross_Reference_Matrix.pdf PDF
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet.pdf PDF
003 CDRL - TO Progress Mtg.pdf PDF
MACC_SOW.pdf PDF
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.xlsx XLSX spreadsheet
Attachment_3d_Appendix_D_MACC_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_3__Section_L_Instructions_to_Offerors 17 Sept.docx DOCX document
Attachment_4_Section_M_Evaluation_Criteria2 17 Sept.docx DOCX document
002 CDRL - Quaterly Progress Mtg.pdf PDF
001 CDRL - Organization Chart.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Score Sheet

Air Force Sustainment Center PZIOC MACC
Solicitation No.: FA813725R0013
Appendix D to Section L, Cross Reference Matrix
ElementOfferor to Fill per Column C, Appendix CDeliverablesWork Sample NumberReference
Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable)Notes / Clarifications (Optional)

Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents

EXAMPLE$
Instruction to Offeror ParagraphPrime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.3Contract, SOWWS2Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1)DD Form 1155s Block 24 shows effective date of work sample and contract value

SOW shows nature of work Add rows as necessary 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work

Instruction to Offeror ParagraphSection 1 – RELEVANT CONSTRUCTION EXPERIENCE
Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)
Category 1Commercial, Industrial & Residential Bldg. Multi Trade
Paragraph 5.2.1.1.1.Submit a Project for each threshold, up to 4 total multiple trade projects for each0-4 Projects
Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts.
Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts
Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts.
Paragraph 5.2.1.1.2Identify the number of trades according the Tinker AFB Facility, Mechanical, Fire Protection and Electrical Standards managed for each project above0-12 Projects
Number of trades <5 Note: each project submitted receives a max point value of 50pts.
Number of trades 5-10 Note: each project submitted receives a max point value of 200pts.
Number of trades >10 Note: each project submitted receives a max point value of 300pts.
Category 2Construction for the US Government
Paragraph 5.1.1.2.Submit a Project executed for the US Government for each threshold, up to 4 total projects for each0-4 Projects
Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts.
Category 3Multiple Construction Multi Trade
Paragraph 5.1.1.3.Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according to UFC and ICC or standards2-5 Projects
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts.
Category 4Utility System Construction (e.g. distribution lines, power plants, utility distribution bldgs. etc.)
Paragraph 4.6.1.4.Submit a Project for each threshold, up to 3 total projects for each0-3 Projects
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.
Category 5Construction in secured areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.)
Paragraph 4.6.1.5.Submit a Project for each threshold, up to 3 total projects for each0-3 Projects
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.
Category 6Individual Trade (Individual trade shall be at least 60% of total project)
Paragraph 4.6.1.6.Submit a Project for each threshold, up to 2 total individual trade projects for each0-2 Projects
Prime Contractor Under $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.
Instruction to Offeror ParagraphSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)
Category 7Experience as Prime on Design-Build Projects (KTR Designing then Building)
Paragraph 5.1.2.1.Submit a Project with Design Build effort, up to 2 total projects0-2 Projects
Prime Contractor over $1M: Note: each project submitted receives a max point value of 400pts.
Instruction to Offeror ParagraphSection 4 - STAFFING
Category 9Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 5.1.4.1.Trade/Construction Workers
Submit number of personnel, pick only oneYes or No
1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts
Paragraph 5.1.4.2.Architects/Engineers
Submit number of personnel, pick only one
1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.3.Certified Safety Manager
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.4.Certified Building Energy Consultant
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.5.Certified Fire Protection Specialist
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.6.Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances)
Certificate: Only one Yes which = 200pts max /No = 0pts.
Instruction to Offeror ParagraphSection 5 - GEOGRAPHIC EXPERTISE
Category 11Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 4.6.5.1.Existing office withinYes or No
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.5.2.Existing office within
Certificate: Only one Yes which = 200pts max /No = 0pts.

Remarks: For Section 1 & 2 Projects can be submitted multiple times

File details come from the government source that posted it. Updated .