This document is an Appendix D Cross Reference Matrix for an Air Force Sustainment Center Multiple Award Contract (MACC) Solicitation No. FA813725R0013. The matrix provides a comprehensive scoring framework for evaluating contractor qualifications across multiple construction and design experience categories, with point values assigned based on project characteristics such as contract value, number of trades, project complexity, and specialized capabilities.

The evaluation matrix covers seven primary experience categories including commercial/industrial building construction, government construction, multi-trade projects, utility system construction, secured area construction, individual trade specialties, and design-build efforts. Contractors can earn points by submitting relevant projects completed within the last 10 years, with maximum point values ranging from 100-400 points depending on the category. Additional points are available for staffing capabilities, including trade workers, architects/engineers, certified safety managers, and specialized technical certifications. Projects must be at least 80% completed by March 31, 2025, to be considered valid for scoring.

View the file

Other files

File Type Posted
Attachment_3__Section_L_ 4 May 26.pdf PDF
Attachment_4_Section_M_Evaluation_Criteria 4 May 26.pdf PDF
Table 1 Historical Project Magnitude Information.docx DOCX document
Copy of Attachment_3c_Appendix_C_MACC_SBSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
Copy of Attachment_3e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
Copy of Attachment_3f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX document
MACC Section L and M Industry Feedback.docx DOCX document
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX spreadsheet
Table 2 Anticipated Project Magnitude Information.docx DOCX document
Attachment_3__Section_L_Instructions_to_Offerors 4 May 26.pdf PDF
Copy of Attachment_3d_Appendix_D_MACC_FOSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
MACC RFI Responses 12 Feb 26.pdf PDF
MACC RFIs 06 Jan 26.pdf PDF
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.pdf PDF
Section M 22 Sep 25.pdf PDF
Attachment_3__Section_L_Instructions_to_Offerors 22 Sept.pdf PDF
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet.pdf PDF
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures.pdf PDF
Attachment_3e_Appendix_E_Past_Performance_Information_Sheet.pdf PDF
Attachment_4_Section_M_Evaluation_Criteria2 17 Sept.docx DOCX document
Attachment_3__Section_L_Instructions_to_Offerors 17 Sept.docx DOCX document
MACC_SOW.pdf PDF
003 CDRL - TO Progress Mtg.pdf PDF
002 CDRL - Quaterly Progress Mtg.pdf PDF
001 CDRL - Organization Chart.pdf PDF
Attachment_3d_Appendix_D_MACC_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Sustainment Center PZIOC MACC Solicitation No.: FA813725R0013 Appendix D to Section L, Cross Reference Matrix

Offeror to Fill per Column C, Appendix C

Deliverables Work Sample Number

Reference Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable)

Notes / Clarifications (Optional) Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents

EXAMPLE $

Instruction to Offeror Paragraph Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. 3 Contract, SOW WS2 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3

(Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work

Add rows as necessary 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1)

DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work

Instruction to Offeror Paragraph

Category 1 Commercial, Industrial & Residential Bldg. Multi Trade Paragraph 4.6.1.1.1. Submit a Project for each threshold, up to 4 total multiple trade projects for each 0-4 Projects

Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts.

Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts.

Paragraph 4.6.1.1.2. Identify the number of trades according the Tinker AFB Facility, Mechanical, Fire Protection and Electrical Standards managed for each project above 0-12 Projects Number of trades <5 Note: each project submitted receives a max point value of 50pts .

Number of trades 5-10 Note: each project submitted receives a max point value of 200pts.

Number of trades >10 Note: each project submitted receives a max point value of 300pts.

Category 2 Construction for the US Government Paragraph 4.6.1.2. Submit a Project executed for the US Government for each threshold, up to 4 total projects for each 0-4 Projects

Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts.

Category 3 Multiple Construction Multi Trade Paragraph 4.6.1.3. Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according to UFC and ICC or standards 2-5 Projects

Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts.

Category 4 Utility System Construction (e.g. distribution lines, power plants, utility distribution bldgs. etc.)

Paragraph 4.6.1.4. Submit a Project for each threshold, up to 3 total projects for each 0-3 Projects

Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.

Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.

Category 5 Construction in secured areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.)

Paragraph 4.6.1.5. Submit a Project for each threshold, up to 3 total projects for each 0-3 Projects

Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.

Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.

Category 6 Individual Trade (Individual trade shall be at least 60% of total project) Paragraph 4.6.1.6. Submit a Project for each threshold, up to 2 total individual trade projects for each 0-2 Projects

Prime Contractor Under $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts.

Prime Contractor Under $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts Prime Contractor Over $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.

Instruction to Offeror Paragraph

Category 7 Experience as Prime on Design-Build Projects (KTR Designing then Building) Paragraph 4.6.2.1.1. Submit a Project with Design Build effort, up to 2 total projects 0-2 Projects

Prime Contractor over $1M: Note: each project submitted receives a max point value of 400pts.

Instruction to Offeror

Paragraph Category 9 Does the Offeror have each or any of the following? Type the word Yes or No in Column C.

Paragraph 4.6.4.1. Trade/Construction Workers

Submit number of personnel, pick only one Yes or No 1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.

>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts

Paragraph 4.6.4.2. Architects/Engineers Submit number of personnel, pick only one 1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.

>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.

Paragraph 4.6.4.3. Certified Safety Manager Certificate: Only one Yes which = 200pts max /No = 0pts.

Paragraph 4.6.4.4. Certified Building Energy Consultant Certificate: Only one Yes which = 200pts max /No = 0pts.

Paragraph 4.6.4.5. Certified Fire Protection Specialist Certificate: Only one Yes which = 200pts max /No = 0pts.

Paragraph 4.6.4.6. Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances) Certificate: Only one Yes which = 200pts max /No = 0pts.

Instruction to Offeror Paragraph

Category 11 Does the Offeror have each or any of the following? Type the word Yes or No in Column C.

Paragraph 4.6.5.1. Existing office within Yes or No

Certificate: Only one Yes which = 200pts max /No = 0pts.

Paragraph 4.6.5.2. Existing office within

Certificate: Only one Yes which = 200pts max /No = 0pts.

Remarks: For Section 1 & 2 Projects can be submitted multiple times

Element

Section 2 - DESIGN EXPERIENCE

Section 1 – RELEVANT CONSTRUCTION EXPERIENCE

Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)

Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)

Section 4 - STAFFING

Section 5 - GEOGRAPHIC EXPERTISE

File details come from the government source that posted it. Updated .