Attachment_3d_Appendix_D_MACC_Cross_Reference_Matrix.xlsx

XLSX spreadsheet 96 KB Posted

Attached to
Tinker AFB 2026 Multiple Award Construction Contract (MACC)- Draft Request for Proposal (RFP)
Solicitation number
FA8137-25-R-0013
Issued by

About this file

This file is a self-score sheet for the Tinker AFB 2026 Multiple Award Construction Contract (MACC) Solicitation, detailing a comprehensive evaluation matrix for potential contractors. The document outlines six categories of relevant construction experience, including commercial/industrial building projects, government construction, multi-trade projects, utility system construction, secured area construction, and individual trade specialties. Contractors can earn points across categories by demonstrating project experience, with maximum point values ranging from 100 to 400 points depending on project complexity and contract value.

The scoring matrix also evaluates contractors on design experience, certifications, staffing capabilities, and geographic expertise. Key evaluation areas include design-build project experience, professional certifications (such as Project Management, LEED, and engineering credentials), workforce composition (trade workers, architects, engineers, managers), and proximity to specific base locations. Contractors must submit projects completed within the last 10 years, with at least 80% completion by March 31, 2025, to be considered. The solicitation is a draft Request for Proposal issued by the Department of the Air Force Materiel Command Air Force Sustainment Center, seeking early industry engagement and feedback before finalizing the contract requirements.

View the file

Other files

File Type Posted
Attachment_3__Section_L_ 4 May 26.pdf PDF
Attachment_4_Section_M_Evaluation_Criteria 4 May 26.pdf PDF
Table 1 Historical Project Magnitude Information.docx DOCX document
Copy of Attachment_3c_Appendix_C_MACC_SBSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
Copy of Attachment_3e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
Copy of Attachment_3f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx XLSX spreadsheet
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx DOCX document
Table 2 Anticipated Project Magnitude Information.docx DOCX document
Attachment_3__Section_L_Instructions_to_Offerors 4 May 26.pdf PDF
Copy of Attachment_3d_Appendix_D_MACC_FOSelf_Scoring_Matrix 4 May 26.xlsx XLSX spreadsheet
MACC Section L and M Industry Feedback.docx DOCX document
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx XLSX spreadsheet
MACC RFI Responses 12 Feb 26.pdf PDF
MACC RFIs 06 Jan 26.pdf PDF
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.pdf PDF
Attachment_3e_Appendix_E_Past_Performance_Information_Sheet.pdf PDF
Section M 22 Sep 25.pdf PDF
Attachment_3__Section_L_Instructions_to_Offerors 22 Sept.pdf PDF
Attachment_3d_Appendix_D_MACC_Cross_Reference_Matrix.pdf PDF
Attachment_3b_Appendix_B_Work_Sample_Cover_Sheet.pdf PDF
Attachment_3a_Appendix_A_Corporate_Relationships_and_Structures.pdf PDF
Attachment_4_Section_M_Evaluation_Criteria2 17 Sept.docx DOCX document
Attachment_3__Section_L_Instructions_to_Offerors 17 Sept.docx DOCX document
MACC_SOW.pdf PDF
003 CDRL - TO Progress Mtg.pdf PDF
Attachment_3c_Appendix_C_MACC_Self_Scoring_Matrix 17 Sept.xlsx XLSX spreadsheet
002 CDRL - Quaterly Progress Mtg.pdf PDF
001 CDRL - Organization Chart.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Score Sheet

Air Force Sustainment Center PZIOC MACC
Solicitation No.: FA813725R0013
Appendix D to Section L, Cross Reference Matrix
ElementOfferor to Fill per Column C, Appendix CDeliverablesWork Sample NumberReference
Document Title, Document Date, Page, Paragraph, Table Number (if applicable), Block (if applicable)Notes / Clarifications (Optional)

Clarifying facts to further substantiate the claim, such as coordinates of remotes sites named in Reference Documents

EXAMPLE$
Instruction to Offeror ParagraphPrime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.3Contract, SOWWS2Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1)DD Form 1155s Block 24 shows effective date of work sample and contract value

SOW shows nature of work Add rows as necessary 1 Contract, SOW WS3 Example Contract #2 DD Form 1155, 1 Feb 2021, Pg 1 (block 24); SOW Pg 3 (Para 1.5.1) DD Form 1155s Block 24 shows effective date of work sample and contract value SOW shows nature of work

Instruction to Offeror ParagraphSection 1 – RELEVANT CONSTRUCTION EXPERIENCE
Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)
Category 1Commercial, Industrial & Residential Bldg. Multi Trade
Paragraph 4.6.1.1.1.Submit a Project for each threshold, up to 4 total multiple trade projects for each0-4 Projects
Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts.
Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts
Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts.
Paragraph 4.6.1.1.2.Identify the number of trades according the Tinker AFB Facility, Mechanical, Fire Protection and Electrical Standards managed for each project above0-12 Projects
Number of trades <5 Note: each project submitted receives a max point value of 50pts.
Number of trades 5-10 Note: each project submitted receives a max point value of 200pts.
Number of trades >10 Note: each project submitted receives a max point value of 300pts.
Category 2Construction for the US Government
Paragraph 4.6.1.2.Submit a Project executed for the US Government for each threshold, up to 4 total projects for each0-4 Projects
Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts.
Category 3Multiple Construction Multi Trade
Paragraph 4.6.1.3.Submit 2 to 5 Projects executed in parallel during a period of at least 6 months, with at least 10 trades according to UFC and ICC or standards2-5 Projects
Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts.
Category 4Utility System Construction (e.g. distribution lines, power plants, utility distribution bldgs. etc.)
Paragraph 4.6.1.4.Submit a Project for each threshold, up to 3 total projects for each0-3 Projects
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.
Category 5Construction in secured areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.)
Paragraph 4.6.1.5.Submit a Project for each threshold, up to 3 total projects for each0-3 Projects
Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts.
Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts.
Category 6Individual Trade (Individual trade shall be at least 60% of total project)
Paragraph 4.6.1.6.Submit a Project for each threshold, up to 2 total individual trade projects for each0-2 Projects
Prime Contractor Under $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K AT/FP MEASURES (e.g. SECURITY FENCE/BARRIERS, WINDOWS): Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $500K HEMP SHIELDING/COLLECTIVE PROTECTION SYSTEMS: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts.
Prime Contractor Under $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts
Prime Contractor Over $750K AIRFIELD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts.
Instruction to Offeror ParagraphSection 2 - DESIGN EXPERIENCE
Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 10 years of the release date of the MACC solicitation, and at least 80% completed no later 31 March 2025)
Category 7Experience as Prime on Design-Build Projects (KTR Designing then Building)
Paragraph 4.6.2.1.1.Submit a Project with Design Build effort, up to 2 total projects0-2 Projects
Prime Contractor over $1M: Note: each project submitted receives a max point value of 400pts.
Paragraph 4.6.2.1.2.For one of the Projects above submit all design documents in compliance with Unified Facilities Criteria (UFC) and the corresponding International Code Council (ICC) model codes and/or standards (i.e. NFPA, ASTM, ASCE)Yes or No
Specifications: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 200pts.
Interior and exterior walls (vertical construction elements)
Ceilings (horizontal construction elements)
Roofs
Waste water, water, and gas systems
Fire-extinguishing systems
Heat-supply systems
HVAC systems
Electrical systems
Communications, security and information systems
Building automation and automation of engineering structures
Drawings: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 400pts.
Interior and exterior walls (vertical construction elements)
Ceilings (horizontal construction elements)
Roofs
Waste water, water, and gas systems
Fire-extinguishing systems
Heat-supply systems
HVAC systems
Electrical systems
Communications, security and information systems
Building automation and automation of engineering structures
Calculations: Note: completeness and accuracy of documents and compliance with local code requirements receives a max point value of 400pts.
Interior and exterior walls (vertical construction elements)
Ceilings (horizontal construction elements)
Roofs
Waste water, water, and gas systems
Fire-extinguishing systems
Heat-supply systems
HVAC systems
Electrical systems
Communications, security and information systems
Building automation and automation of engineering structures
Instruction to Offeror ParagraphSection 3 - CERTIFICATIONS/INNOVATION
Category 8Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 4.6.3.1.Certification for Project Management ProfessionalsYes or No
Certificate: Only one Yes which = 100pts max /No = 0pts.
Paragraph 4.6.3.2.Certification for Credentialed ProfessionalsYes or No
Certificate-Architect: Only one Yes which = 100pts max /No = 0pts.
Certificate-Civil Engineer: Only one Yes which = 100pts max /No = 0pts.
Certificate-Structural Engineer: Only one Yes which = 100pts max /No = 0pts.
Certificate-Mechanical/plumbing Engineer: Only one Yes which = 100pts max /No = 0pts.
Certificate-Electrical Engineer: Only one Yes which = 100pts max /No = 0pts.
Certificate-Fire Protection: Only one Yes which = 100pts max /No = 0pts.
Certificate-Interior Desgin (ref UFC 3-120-10): Only one Yes which = 100pts max /No = 0pts.
Paragraph 4.6.3.3.Certification for LEED ProfessionalsYes or No
Certificate: Only one Yes which = 100pts max /No = 0pts.
Paragraph 4.6.3.4.Certification for Safety ProfessionalYes or No
Certificate: Only one Yes which = 100pts max /No = 0pts.
Paragraph 4.6.3.5.Certification for Quality ProfessionalYes or No
Certificate: Only one Yes which = 100pts max /No = 0pts.
Instruction to Offeror ParagraphSection 4 - STAFFING
Category 9Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 4.6.4.1.Trade/Construction Workers
Submit number of personnel, pick only oneYes or No
1-5 Workers: Note: Only one Yes which = 100pts max /No = 0pts.
>5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts
Paragraph 4.6.4.2.Architects/EngineersYes or No
Submit number of personnel, pick only one
1-3 A/E: Note: Only one Yes which = 100pts max /No = 0pts.
>3 A/E: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.3.Contract Program ManagerYes or No
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.
>1: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.4.Quality Control ManagerYes or No
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.5.Site Safety and Health Manager
Submit number of personnel, pick only one for each levelYes or No
Level 1
Only one Yes which = 200pts max /No = 0pts.
Level 2
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.
Level 3
1-3: Note: Only one Yes which = 100pts max /No = 0pts.
>3: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.6.Design Program ManagerYes or No
Submit number of personnel, pick only one
1: Note: Only one Yes which = 100pts max /No = 0pts.
>1: Note: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.4.7.SuperintedentsYes or No
Submit number of personnel, pick only one
1-2: Note: Only one Yes which = 100pts max /No = 0pts.
>2: Note: Only one Yes which = 200pts max /No = 0pts.
Instruction to Offeror ParagraphSection 5 - GEOGRAPHIC EXPERTISE
Category 11Does the Offeror have each or any of the following? Type the word Yes or No in Column C.
Paragraph 4.6.5.1.Existing office within 25km of RABYes or No
Certificate: Only one Yes which = 200pts max /No = 0pts.
Paragraph 4.6.5.2.Existing office within 25km of SAB
Certificate: Only one Yes which = 200pts max /No = 0pts.

Remarks: For Section 1 & 2 Projects can be submitted multiple times