This document is a Questions and Answers file for Solicitation FA813225Q0042, concerning the purchase of an office trailer for Tinker Air Force Base. The solicitation requires a maximum 65x30 office trailer with specific design requirements, including four corner offices, an ADA ramp, smoke alarms connected to the base fire alarm system, and CAT-5 cabling with jacks. The procurement is a one-time purchase using Lowest Price Technically Acceptable (LPTA) evaluation criteria, with a site visit available near Building 9400. Contractors must complete all installation work within 10 business days, including site preparation, trailer placement, steps, ramps, and skirting. Base access requires contractors to contact the government point of contact seven business days in advance, provide two forms of identification, and obtain a visitor's pass valid for up to 30 calendar days. The trailer will be installed using gravel as a foundation, with Tinker AFB responsible for fire alarm system connection, and no special licensing is required.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA813225Q0042 - OFFICE TRAILER

QUESTIONS AND ANSWERS

• Dimensions: The requirement states "maximum 65x30." What specifically is the base looking for? Do they have a floor plan available to provide more bid accuracy? I have attached the layout of the office trailer.

• Floorplan Design: Refer to attached floor plan o If no floor plan has been created yet, what size offices are required for the noted four offices?

o The sheet references "larger offices." Is this in addition to the four corner offices? If so, what are the size requirements and where should they be located?

• ADA Access: The sheet references ADA steps for access. Will an ADA ramp also be required, or just step platforms? Yes, a ramp is required.

• Safety / Smoke Alarms: The specs note smoke alarms in each individual room. Is one also required in the larger open/central area? Is there a specific spec requirement for these alarms? Yes, there is a need for one in the larger area. No specifics, just that the alarms must be connected to the base fire alarm system notification.

• Site Labor Requirements: The document does not mention labor requirements. Will this project require Open Shop Labor, Union Labor, or Prevailing Wage? Is certified payroll required? That would be no to all parts.

• Base Access Requirements: Could you please provide specifics on requirements for installation crews to access the base (e.g., personal requirements, site safety training, or other clearances)? The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes.

The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate, which is South of I-40 off Air Depot Blvd.

The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days. Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

• Licensing: Are there any specific license requirements for this project? No special license is required.

• Please confirm referenced requisition is for a purchase of the building and NOT a lease. This is not for a lease. This is for the purchase of a trailer.

• What evaluation criteria will be used (e.g., LPTA or Best Value Trade-Off)? LPTA

• Is this a one-time purchase or part of a larger IDIQ or BPA contract? One time purchase

• Is there a required format or pricing breakdown template for the quote? Yes Information located on SAM.gov under Notice ID FA813225Q0042 attachment document under CSS_OFFICE TRAILER.pdf last two pages titled Quote Sheet. Please fill out all information for Section 1 – Offeror Information and Section 2 – Supplies and Price.

• Will there be a pre-bid site visit to inspect the installation site near Building 9400?

Yes. Please reach out to point of contact for instructions for base access.

• What foundation method is expected if a concrete slab is not used? Vendor is to prepare the site to accommodate the new trailer. Gravel can be used.

• Who is responsible for interfacing the fire alarm system with the base alarm shop (hardwired vs. wireless)? Tinker will be responsible for the connection. But fire alarms must be installed in the building by the contractor.

• Does the CAT-5 requirement include jacks, switches, or only the cabling? Yes, it includes jacks.

• Are there liquidated damages or penalties for not completing installation within the 7-day window? No, but work must be completed within 10 business days. That includes but not limited to site preparations, securing the trailer in place, and placing the steps, ramps, and skirting.