COMBS IV Draft RFP Q&A
| Item # | list the Document you have a question on (RFP, PWS, or the attach # to the RFP or PWS) | Page # & or Para # of Document you are asking a question on | Question, Comment or Recommendation | |
| (Note: use "Wrap Text") | Question | Government Response | ||
| 1 | RFP | Section B, pg 3, Basic Period dates; |
Section B, Pgs 88-93, 7000-series Transition CLINs Reference:
1. Section B, pg 3, Basic Period dates, lists the inclusive dates for Basic Pricing Period 1 as 1 May 2024 - 30 April 2025
2. Section B, pgs 88-93, 7000-series CLINs Identify a 180-day transition in period extending from 1 May 2024 to 1 November 2024.
Discussion: The first six months of Basic Pricing Period #1 coincide with the Transition In period.
| Question: Do we understand correctly that the Government's intent is for the first six months of Basic Pricing Period 1 to be the Transition In period (1 May 2024 - 1 Nov 2024), followed by six months of full contract Performance, beginning on 2 November 2024? | Question: Do we understand correctly that the Government's intent is for the first six months of Basic Pricing Period 1 to be the Transition In period (1 May 2024 - 1 Nov 2024), followed by six months of full contract Performance, beginning on 2 November 2024? | Yes, the 1st six months will be transition-in followed by six months of full performance. | |
| 2 | Attach 5 | Section L, Instructions to Offerors; | |
| Table 2.3, Proposal Organization, pgs 3 & 4 | Reference: Attach 5, Section L, paragraph 2.3.3, Table 2.3, Proposal Organization, identifies the required titles and contents for each proposal volume. |
Discussion: The ITO paragraph references and section titles do not appear to coincide with the remainder of the Section L instructions (all volumes). For Example: Vol I
3.0 Technical
3.2.2 2.3.1 Title Page
3.2.2 2.3.2 Team List (see Attach 2.0)
3.2.2 2.3.8 Table of Contents
3.2.2 2.3.9 List of Tables and Figures
3.2.2 2.3.10 Glossary of Abbreviations and Acronyms
3.2.3 Subfactor 1 Program Management
3.2.4 Subfactor 2 Supply Chain Management
3.2.5 Subfactor 3 Inventory Data Management and Reporting
3.2.6 In addition, the table does not correctly identify the Table of Contents, List of Tables and Figures, and Glossary of Abbreviations and Acronyms for each volume as required per ITO paragraphs 2.3.8 thru 2.3.10 respectively.
Question: Will the Government consider updating Section L, Table 2.3 (all volumes) to accurately identify the desired contents of each volume?
| Question: Will the Government consider updating Section L, Table 2.3 (all volumes) to accurately identify the desired contents of each volume? | Section L, Table 2.3 has been updated with the necessary changes. | |
| 3 | Attach 5 | Section L, Instructions to Offerors; |
Table 2.3, Proposal Organization, pg 4
Section L, ITO Attachment 1.1 Reference: Attach 5, Section L, paragraph 2.3.3, Table 2.3, Proposal Organization, page 4, Volume II Past Performance.
Discussion: Based on a comparison of Table 2.3, Section L.4.0 Factor 2 - Past Performance, and ITO Attachment 1.1 Past Performance Information (PPI) Form/Tool, we are confused as to the intended volume structure and contents.
Table 2.3 has a separate Volume II entry for Past Performance Information Forms (Atch 1.1 PPI Tool), and Relevant Contract Narrative. The PPI Tool identified in Atch 1.1 consists of multiple tabs: Business Relationships; Contact Information; Program Details (which includes a discussion of contract relevance, per Section L instructions); and POC and Key Individuals. Then... 5 rows down in Table 2.3, it identifies a separate requirement for a "Relevant Contract Narrative", which is already addressed within the "Program Details" Tab of the Attach 1.1 PPI Tool.
Furthermore, Table 2.3 identifies the page limit for the PPI Tool as "N/A", and the page limit for the Relevant Contract Narrative as a maximum of 5 pages per contract. The last sentence of Section L.4.3.1 requests that the PPIF not exceed a target of 8 pages, although more or less may be submitted if necessary. Then... the last two sentences of Section L.4.3.2 request offerors to limit their contract relevancy narrative to a maximum of 5 pages, however this limit may be exceeded if necessary.
Questions:
A. Will the Government please update Table 2.3 and relevant Section L.4.0 subparagraphs to clarify their intent for the specific structure and contents of Volume II, Past Performance?
B. Is it the Government's intent that the Past Performance Information (PPI) Form/Tool and Relevant Contract Narrative are two separate Volume II requirements, or should the Relevant Contract Narrative be incorporated within the PPI Form/Tool per the Atch 1.1 instructions?
C. Is it the Government's intent that the Past Performance Information (PPI) Form/Tool be submitted as a separate electronic document, labeled per ITO Attachment 1.1, Downloading the PPI Tool (pg 2), paragraph 4, and/or the printed outputs from the PPI Tool, Printing Reports and Submitting PPI Tool (pg 10), paragraph 4, incorporated into the Volume II electronic file, labeled per Section L paragraph 2.3.4? Question A: Will the Government please update Table 2.3 and relevant Section L.4.0 subparagraphs to clarify their intent for the specific structure and contents of Volume II, Past Performance?
Question B: Is it the Government's intent that the Past Performance Information (PPI) Form/Tool and Relevant Contract Narrative are two separate Volume II requirements, or should the Relevant Contract Narrative be incorporated within the PPI Form/Tool per the Atch 1.1 instructions?
Question C: Is it the Government's intent that the Past Performance Information (PPI) Form/Tool be submitted as a separate electronic document, labeled per ITO Attachment 1.1, Downloading the PPI Tool (pg 2), paragraph 4, and/or the printed outputs from the PPI Tool, Printing Reports and Submitting PPI Tool (pg 10), paragraph 4, incorporated into the Volume II electronic file, labeled per Section L paragraph 2.3.4? QA. The Government does not intend to update Table 2.3 for Volume II- Past Performance or Section L 4.0 subparagraphs.
QB. Yes, the PPI Relevant Contract Narrative (IAW Section L 4.3.2) is a separate portion of the Past Performance Volume Submission from the PPI Tool (IAW Section L 4.3.1. and ITO Attachment 1.1.).Per Section L, 4.3.1, offerors shall provide Past Performance Information (PPI) on current or previous contracts (or efforts). The PPI shall be completed in accordance with Attachment 1.1, Past Performance Information Form (identified as “PPIF”) which is accomplished within the PPI Tool itself. ITO Attachment 1.1 states “Offerors must use the PPI Tool (Use latest version at https://www.sam.gov) in order to electronically submit the PPI portion of the Past Performance Volume in accordance with the RFP (FA8106-23-R-1000) for (T-6 Contractor Operated and Maintained Base Supply (COMBS) IV Program). Section L– Instructions to Offerors, Attachment 1.1.” ITO Attachment 1.1 (pages 20-29) show examples of the type of information to enter for PPI within the PPI Tool.
Per Section L, 4.3.2, offerors shall provide a narrative explaining what aspects of the contract is deemed relevant to the proposed effort, and to that aspects of the proposed effort they relate. Specifically, the narrative should focus on similarities to the Factor 1 Technical subfactors, Factor 3 Price, and Scope, Magnitude, Performance Quality, and Complexity, as defined in Section M, paragraph 2.3.2.2 Relevancy Assessment, and should be tailored to the proposed portion of effort. Offerors are requested to limit the narratives to a maximum of 5 pages. However, the offeror may exceed the requested page limit, if determined necessary to fully describe relevancy.
QC. Specific to Section L 2.3.4, offerors shall submit volumes with the file names provided (i.e. Volume II-Past Performce.doc or docx). Specific to the electronic PPI Tool submission, offerors shall provide the PPI Tool with the naming convention described in ITO Attachment 1.1, Downloading the PPI Tool (pg 2), paragraph 4, and Printing Reports and Submitting PPI Tool (pg 10), paragraph 4, (i.e. "XYZCompanyFAXXXX21RXXXX.accdb" for primes and subcontractors).
4 Attach 5 Section L, Paragraphs 2.4.1 and 2.4.2 Reference: 1. Attach 5, Section L, paragraph 2.4.1 identifies the standard line spacing and font size for proposal volumes
2. Attach 5, Section L, paragraph 2.4.2 identifies allowable page and font size for tables, charts, graphs, and figures Discussion: Paragraph L.2.4.1 identifies that page line spacing shall be 1.5 lines, and except for reproduced sections of the solicitation document, the text size shall be no less than Arial 12 Point.
Paragraph L.2.4.2 identifies that within the Technical Volume (only), Text within figures, charts, tables, and graphs shall be no less than Ariel 8-pt. This paragraph, however, does not mention line spacing within these figures, charts, tables and graphs. As written, the specific allowance for font sizes within figures, charts, tables, and graphs only applies to the Technical Volume, and not the Past Performance, Price, and Contract Documentation Volumes. These font size allowances for figures, charts, tables, and graphs would aid the readability for these items included in the other volumes as well.
Question: A. Will the Government consider amending paragraph L.2.4.2 to allow single spacing for figures, charts, tables, and graphs?
QB: No the current direction in 2.4.2 will remain the same.
5 Attach 5 Section L, Paragraph 3.2.3, Subpara g
Section L, Paragraph 2.3.3, Table 2.3 Reference: Attach 5, Section L, paragraph 3.2.3.g, identifies inclusion of the offeror's approach to Small Business Participation.
Discussion: Paragraph L.3.2.3.g.1 requires offerors to submit a completed Small Business Participation Commitment Document (SBPCD) per the ITO Attachment 3.0 template. Large Business Primes are also required to submit a subcontracting plan tailored to this contracting effort. However, Table 2.3, Proposal Organization, does not identify where within Volume I to include these documents, whether they are included within the volume maximum page limit., or if they are to be submitted as separate electronic documents.
Question: A. Will the Government consider amending both Table 2.3 and ITO paragraph 3.2.3.g to identify the desired location and submittal method/medium for both the required Small Business Participation Commitment Document (SBPCD) and Subcontracting Plan?
Question B: Does the Government intend for the SBPCD and Subcontracting Plan to be submitted within the Volume I, Subfactor One, Program Management narrative, or as separate electronic documents?
Question C: Does the Government intend for the SBPCD and Subcontracting Plan to be included within the Volume I maximum page limit, or excluded from the volume page count? QA: The Small Business Participation Commitment Document (SBPCD) and Subcontracting Plan will be submitted with Technical Volume I, Subfactor 1, Program Management and will be excluded from the 65 page limit, Table 2.3 has been updated.
QB: Yes, see above.
QC: The SBPCD and Subcontracting Plan will be excluded from the Technical Volume I page limit, Table 2.3 has been updated.
6 Attach 5 Section L, Paragraph 4.1.4 Reference: Attach 5, Section L, paragraph 4.1.4 identifies the requirement for offerors to submit "Commitment to Perform as Proposed" letters signed by the Prime contractor and each Subcontractor.
Discussion: Prime offerors are required to provide past performance citations within Volume II Past Performance, for themselves and "Significant Subcontractors" (those performing over 5% of the total effort or a critical function). Paragraph 4.1.4 identifies "each subcontractor" for submission of "Commitment to Perform as Proposed" letters, but does not specify if submittal of those letters is limited to only those "Significant Subcontractors" for which Past Performance citations are submitted. Since paragraph 4.1.4 states that if the signed commitment is not fully executed by both parties, the subcontractor past performance references will not be evaluated; we assume this requirement only applies to Significant Subcontractors. And conversely, these letters would not be required for subcontractors who do not meet the criteria for identification as "Significant" subcontractors, or vendors/suppliers.
Question: Do we understand correctly, that the "Commitment to Perform as Proposed" letters are only required for entities meeting the criteria as "Significant Subcontractors", for which Past Performance citations are incorporated within Volume II? The Government advises the Offeror to review Section L 4.1.4 in its entirety. Specifically, Paragraph 4.1.4 states "This letter shall be executed and signed by the Prime contractor and each Subcontractor. The letter states that, in the event a contract is awarded to the Prime Contractor, the Prime Contractor and Subcontractor (to include teaming partners, and/or joint venture partners) commit to joint contract performance as described in the proposal. A separate letter shall be completed for each subcontractor separately. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, the subcontractor references will not be evaluated or considered."
Therefore, it is the Government's intent that Offerors will comply with Section L 4.1.4 by providing a Commitment to Peform as Proposed Letter with each subcontractor, not just subcontractors that the offeror determines is as significant subcontractors per Section L 4.3.1.
IAW Section L 4.3.1, only significant subcontractors will be further evaluated for past peformance based on their proposed portion of effort. "Significant subcontractor is defined as a contractor who is proposed to perform over 5% of the total effort, or a contractor who is proposed to perform less than 5% of the total effort but is determined to be performing a critical function."
7 Attach 5 Section L, Paragraph 2.3.6
Section L, 3.2.3.g;
Section L, Paragraph 5.1;
Section, Attachment 3.0 Reference
1. Attach 5, Section L, paragraph 2.3.6, Pricing Information, states: "All pricing information shall be addressed ONLY in the Price Proposal and Contract Documentation volumes."
2. Attach 5, Section L, paragraph 5.1, General Instructions, in relation to pricing information, states: "Under no circumstances shall this information and documentation be included elsewhere in the proposal."
3. Attach 5, Section L, paragraph 3.2.3.g requires submittal of a completed Small Business Participation Commitment Document (SBPCD) and a Subcontracting Plan, both of which require inclusion of the proposed Total Contract Value and dollars and percentages attributed to Small Business, broken-down by socio-economic categories.
4. Attach 5, Section L, Attachment 3.0, Small Business Participation Commitment Document (SBPCD), requires input of pricing information in the form of Total Contract Value, and the apportionment of the proposed price attributed to each Small Business socio-economic classification.
Discussion: The submittal requirements for the SBPCD and Subcontracting Plan appear to conflict with the prohibition of inclusion of pricing information in any proposal documents with the exception of Volume III Price, and Volume IV Contract Documentation.
Question: Will the Government consider revising paragraphs L.2.3.6 and L.5.1 to allow pricing information to be included in only Volumes III, Price, IV, Contract Documentation, and the Small Business Participation Commitment Document (SBPCD), and Subcontracting Plan? Updated Section L, Paragraph 2.3.6 and 5.1 to include pricing information also in ITO Attachment 3.0 for SBPCD Template and Contract Documentation Volume IV.
8 Attach 5 Section L, Paragraph 6.3.5 Reference: Attach 5, Section L, paragraph 6.3.5, Attachments to the Model Contract, instructs offerors to "provide the following as attachments to the model contract."
Discussion: Paragraph L.6.3.5 does not list any requirements to be attached to the model contract.
| Question: Does the Government intend to provide a listing within paragraph L.6.3.5, of additional items to be included within Volume IV, Contract Documentation, as attachments to the Model contract? | USG added the references to ITO attachments 1.1 - 3.0 in section 6.3.5. | ||
| 9 | Attach 2 | Draft PWS, Paragraph 1.1.6 | Reference: Attach 2, Draft PWS, paragraph 1.1.6, Diminishing Manufacturing Sources and Material Shortages (DMSMS), identifies the Offeror's role in supporting DMSMS efforts/studies for the T-6 platform |
Discussion: PWS paragraph 1.1.6.a) specifies that the offeror is required to support the "Prime DMSMS Contractor".
| Question: Who is the current "Prime DMSMS Contractor" for which the offeror is to support, and what is the period of performance for that contractor's performance? | T-6 Original Equipment Manufacturer and Prime DMSMS Contractor is Textron Aviation Defense. The period of performance of the Textron Aviation Defense SEPM II Contract is not relevant for this T-6 COMBS IV effort. | ||
| 10 | Attach 2 | Draft PWS, Paragraph 1.1.8 | Reference: Attach 2, Draft PWS, paragraph 1.1.8, Quality Management System, identifies the certification requirements of the offerors proposed Quality Management System (QMS). |
Discussion: PWS paragraph 1.1.8 identifies that contractors shall Implement and maintain a third-party certified AS9100C QMS. The current version of this Quality standard is AS9100D. There are also varying organizational levels of certification that can be applied to the third-party certification requirement: Corporate-level, Program/Contract-level, and site-level. In most cases, offerors are third-party certified at the Corporate or Program/Contract level, but flow-down the QMS requirements to the sites to ensure compliance at the site-level.
Question: A. Does the Government consider Offeror's Third-party certification to AS9100 at the corporate level, with compliance flow-down at the Program/Contract and site-levels, as meeting the QMS certification requirements of PWS paragraph 1.1.8?
Question B: If not, please specify the required organizational level for certification. QA: The Government has updated Section 1.1.8. to reflect AS9100D. Yes, the Government does consider Offeror's Third-party certification to AS9100 at the corporate level with compliance flow down to the Program/Contract and site levels as meeting the QMS certification requirements.
QB: N/A
11 Attach 2 Draft PWS, Paragraph 1.1.2.1.B).4;
Draft PWS, Paragraph 3.2.3.3;
Draft PWS, Paragraph 3.2.4.3 Reference:
1. Attach 2, Draft PWS, paragraph 1.1.2.1.b).4 instructs offerors to provide on-site COMBS services during normal Flying and Maintenance operations for the US Army (USA) aircraft at AFTD Redstone Arsenal, Al, Monday - Friday from 0700-1900.
2. Attach 2, Draft PWS, paragraph 3.2.3.3, USA Facilities, only identifies that "The USA will provide secure, restricted access, warehouse facility at Redstone Test Center (RTC)."
3. Attach 2, Draft PWS, paragraph 3.2.4.3, USA Support Services, only specifies that "The USA will provide the following base support all Packaging, Handling & Storage required at AFTD Redstone Arsenal.
Discussion: The guidance for the offeror's role at the COMBS location at Redstone Test Center in support of Army T-6D aircraft appears rather vague. On one hand, the contractor appears to be required to provide COMBS services at Redstone arsenal, but there is almost no additional guidance for site-level support, with the Army responsible for Packaging, Handling & Storage of COMBS assets, which may encapsulate the tasks of receiving, warehousing, issuing, and shipping of parts and materials. It could actually be interpreted that the COMBS provider provides the parts and material and the USA is responsible for the on-site operation.
Question: Will the Government please clarify the role of the COMBS provider in support of the Army at Redstone Arsenal location? Section 1.1.2.1. has been updated to clarify the role of the COMBS provider in support of the Army at Redstone Arsenal location.
USG has updated paragraph 3.2.3.3 to remove this requirement.
Requirements in paragraph 3.2.4.3 remain the same.
| 12 | Attach 5 | Section L, Paragraph 2.4.1 | Reference: Attach 5, Section L, paragraph 2.4.1, states: "Except for the reproduced sections of the solicitation document, the text size shall be no less than Arial 12 Points. Offerors are prohibited fro using other Arial fonts such as Arial Black, Arial Narrow, or Arial Rounded MT Bold." | |
| Discussion: Use of different fonts than used for narrative text for section headers and table/figure captions enhances the readability of the proposal documents. | Question: To allow differentiation between the paragraph text and captions within the proposal narrative, will the Government accept different styles of Arial font for section/paragraph headers and table/figure captions? | No, paragraph 2.4.1. will not be changed. | ||
| 13 | Attach 2 | Draft PWS, Paragraph 1.1.2.1.b, pg 8 | Reference: Attach 2, Draft PWS, paragraph 1.1.2.1.b identifies the required on-site COMBS support hours for the USAF operating locations. |
Discussion: The referenced PWS paragraph specifies the required COMBS support hours as Monday - Friday 0600 - 2400. It is our understanding that the airfields at USAF AETC sites are normally open on Sunday afternoons for approximately 6 hours to accomodate Cross-country returns, and the maintenance organizations are required to staff these times to recover aircraft and re-generate them for Monday morning flight schedules. If established COMBS operating hours are not identified for Sunday cross-country returns, either on-call COMBS support will have to be provided per paragraph 1.1.2.1.f for NMCS/PMCS requirements (90 minute response time), or wait until normal operating time on Monday morning.
Question: Does the Government intend the COMBS to support weekend maintenance at USAF sites solely through on-call support, or did the Government intend to specifiy weekend support hours (similar to the USN sites) to accomodate weekly cross-country returns? No, the Government did not intend to specify USAF weekend support hours. Operations and on-call services outside of normal flying and maintenance operations are covered in Section 1.1.2.1.
Additional weekend support for all services are covered in Section 1.1.3.2.
| 14 | Attach 2 | Draft PWS, Paragraph 1.1.11.b, pg 25 | Reference: Attach 2, Draft PWS, paragraph 1.1.11.b provides a table of recurring and non-recurring site-level meetings. | |
| Discussion: This table identifies three required meetings specific to USAF COMBS locations (Aircraft Document Reviews, P&S Phase Pre-Dock Meetings, and P&S Time Change Scheduling Meetings). The identifies the "USAF Site Managers" for required participation in these meetings. We understand the importance of attendance at these meetings, however the Site Manager should have the option of designating a site-level employee to attend these meetings on his behalf if neccessary to meet other commitments. | Question: Will the Government consider ammending the required personnel identified in the PWS paragraph 1.1.11.b table for Aircraft Document Reviews, P&S Phase Pre-Dock Meetings, and P&S Time Change Scheduling Meetings to "USAF Site Managers or designees"? | USG has updated PWS paragraph 1.1.11.b table for Aircraft Document Reviews, P&S Phase Pre-Dock Meetings, and P&S Time Change Scheduling Meetings to read "USAF Site Manager or Designee". | ||
| 15 | Attach 2 | Draft PWS, Paragraph 1.2.f, pg 30 | Reference: Attach 2, Draft PWS, paragraph 1.2.f requires offerors to: "Develop a Support Equipment Management Plan to cover corrosion control, identify dedicated manpower by site location, calibration schedule, maintenance schedule, replacement of obsolete/damaged equipment, compliance with Government Corrosion Control Policy (CDRL B023, DIMGMT- 80004A/T)" |
Discussion: It is our experience that Government-provided USAF COMBS facilities do not have the capability/certification for performance of corrosion prevention/control, cleaning, painting, and marking of contractor-provided Support Equipment (SE) at USAF COMBS sites per TO 35-1-3. We were unable to identify in the PWS where co-use of base-level facilities were provided to accomplish these tasks.
| Question: Does the Government intend for T-6 COMBS offerors to be permitted co-use of corrosion control/washrack facilities at USAF and NAS PAX COMBS locations to perform required corrosion control tasks on contractor-provided SE, or will offerors be required to pursue off-site avenues to meet these requirements? | COMBS will use USG corrosion control/washrack facilities. | |||
| 16 | Attach 2 | Draft PWS, Paragraph 1.3.7.2.a.2.a.1, pg 42 | Reference: Attach 2, Draft PWS, paragraph 1.3.7.2.a.2 identifies the minimum number of aircraft batteries to be maintained/stored for each COMBS location. Subparagraph 1.3.7.2.a.2.a.1 further identifies "10 at Laughlin, Vance, Sheppard, and Columbus". | |
| Discussion: Based on the number of aircraft assigned and projected flight hours (PWS Appendix D) at the Laughlin, Vance, Sheppard, and Columbus locations, maintenance of 10 batteries does not appear to be sufficient to support those missions without adversely affecting aircraft availability. When comparing the numbers of aircraft assigned and projected flight hours with NAS Corpus Christi, it appears raising the number of batteries at the Laughlin, Vance, Sheppard, and Columbus from 10 to 15 would be prudent. | Question: Will the Government consider updating PWS paragraph 1.3.7.2.a.2.a.1 to indicate a requirement to maintain/store 15 T-6A/B/D aircraft Batteries at the Laughlin, Vance, Sheppard, and Columbus COMBS locations? | No, the current minimum battery requirement of 10 will remain the same in 1.3.7.2.a.2.a.1. | ||
| 17 | Attach 2 | Draft PWS, Paragraph 1.1.2.2.d, pg 9 | Reference: Attach 2, Draft PWS, paragraph 1.1.2.2.d states: "FRCSE managed pre-expended bins for USN aircraft cannot be utilized to support USAF aircraft unless approved by T-6 engineering authority and COMBS PCO due to DLA parts not having Certificates of Conformance | |
| Question: If DLA parts do not have traceability and Certificates of Conformance, as stated in PWS paragraph 1.1.2.2.d, how does FRCSE's use of DLA parts in support of depot maintenance of USN aircraft/components allow T-6 aircraft to retain FAA certification? | DLA parts are not a requirement of the COMBS IV contract. | |||
| 18 | Attach 2 | Draft PWS, Paragraph 1.1.3.3.a | Reference: Attach 2, Draft PWS, paragraph 1.1.3.3 and 1.1.3.3.a require offerors to assign a "Maintenance Liaison" within the maintenance contractor's Maintenance Control function at Whiting Field, Corpus Christi and NAS Pensacola. |
Discussion: It would appear to be more effective to have a dedicated maintenance Liaison located within the COMBS to accomplish the tasks specified within subparagraphs a thru h, vice an employee assigned within the customer's maintenance control function--physically removed from the ongoing COMBS operation.
| Question: Will the Government consider updating paragraphs 1.1.3.3 and 1.1.3.3.a to specify assignment of a dedicated Maintenance Liaison within the Whiting Field, Corpus Christi and NAS Pensacola COMBS locations, Monday through Friday from 0600-1600, to provide the liaison requirements identified in paragraphs b through h? | No, Section 1.1.3.3. will remain the same. | ||
| 19 | Attach 2 | Draft PWS, Paragraph 1.1.11.b, pg 24 | Reference: Attach 2, Draft PWS, paragraph 1.1.11.b, within the table, identifies the minimum required attendees of the weekly T-6 Readiness Cell accomplished via telecon as the Program Manager, Operations Manager, and Textron. |
Discussion: PWS paragraph 1.1.3.3.g requires the Maintenance Liaisons at Whiting Field, Corpus Christi, and NAS Pensacola to attend the T-6 Readiness Cell as well.
Question: Will the Government consider ammending the table within PWS paragraph 1.1.11.b to include the Maintenance Liaisons at Whiting Field, Corpus Christi, and NAS Pensacola as required attendees of the weekly T-6 Readiness Cell telecon? USG has updated PWS paragraph 1.1.11.b table to include Maintenance Liaisons.
| 20 | Attach 2 | Draft PWS, Paragarph 1.3.5, pg 39 | Reference: Attach 2, Draft PWS, paragraph 1.3.5, Engine Tracking requirements for USN COMBS locations in subparagraph b, and USAF COMBS locations in subparagraph | |
| Discussion: The referenced PWS paragraph identifies Engine Tracking requirements for USN COMBS locations in subparagraph b, and USAF COMBS locations in subparagraph c. Engine tracking of USA aircraft at the Redstone Arsenal COMBS, however, is not addressed within PWS paragraph 1.3.5. | Question: What is the Government's intended approach for accomplishment of engine tracking of the USA aircraft at Redstone Arsenal? | Engine reporting is not required of the USA aircraft at Redstone Arsenal. |
| 21 | Attach 2 | Draft PWS, Paragraph 3.2.f, pg 62 | Reference: Attach 2, Draft PWS, paragaph 3.2.f indicates the Government will "provide administrative supplies and materials" at USAF COMBS locations. | |
| Discussion: We ar unclear as to the scope of the Government's intended provision of administrative supplies and materials at USAF locations. | Question: Will the Government please clarify the scope of their intended provision of administrative supplies and materials (e.g. copier/printer paper, ink,) at the USAF COMBS locations? | USG has deleted 3.2.f "provide administrative supplies and materials". |
| 22 | Attach 3 | Attachment 3 - Draft GFP | Discussion: File Attachment 3 - Draft GFP.pdf isued on Feb 22, 2023 via SAM.gov, was issued as a Adobe .pdf file. Based on the contents of the file, it appears this is an output from a database program, however in it's current adobe .pdf format, it is unusable to accomplish analysis of the contract GFP. |
| Question: Will the Government consider re-issuing Attachment 3 in a format compatible with either Microsoft Excel or Microsoft Access to enable offerors to accurately analyze the GFP associated with this solicitation? | Yes, USG will reissue Attatchment 3 via Microsoft Excel. | ||
| 23 | Attach 2 | Draft PWS, Paragraph 1.3.12.1.d | Reference: Attach 2, Draft PWS, paragaph 1.3.12.1.d requires the contractor to "Provide and maintain a Master Repair/Overhaul Parts Listing identifying each repairable and the associated OEM, 14 CFR Part 145 Repair Station(s) or Government authorized source of repair(s)" |
| Question: Is it the Government's intent that the required Master Repair/Overhaul Parts Listing submitted per CDRL B027 include all repairables, or is there an intended minimum dollar threshold? | CDRL B027 includes all repairables. | ||
| 24 | Attach 2 | Draft PWS Paragraph 1.3.12.2.b | Reference: Attach 2, Draft PWS, paragraph 1.3.12.2.b requires the contractor to "Ensure that parts are eligible for installation in the form of an FAA form 8130-3 Authorized Release Certificate, Airworthiness Approval Tag, FAA Form 8130-9, Statement of Conformity, and/or Certificate of Conformity as required and appropriate" |
| Question: Will all of the inventory that are transfered to the Contractor during transition, include the appropriate certification documents (e.g. FAA Form 8130, Certificate of Conformity)? | Yes, the transferred inventory will include the appropriate certification documenation. | ||
| 25 | Attach 2 | Draft PWS Paragraph 1.1.1.c.1 | Reference: Attach 2, Draft PWS, paragraph 1.1.1.c.1 allows contractors to use Second-Tier subcontractors to meet the annual Small Business (SB) requirement of 15% of Total Contract Value. |
Discussion: First-Tier subcontractors are often reluctant to identify their SB subcontractors (Second-Tier) by name, however we have had success in the past with subcontractors providing the dollar values and percentages of spend to SB concerns.
Question 1: If second-tier subcontractors will be applied to meeting SB goals, are offerors required to specify this on the Small Business Participation Commitment Document (SBPCD) (ITO Atch 3.0), submitted with the proposal?
Question 2: If second-tier subcontractors are used to meet the required 15% SB spend, are offerors required to individually list the second tier subcontractors in section 3 of the submitted SBPCD?
| Q1/Q2: Second-tier subcontracting is not required to be reported on the SBPCD. | ||
| 26 | Attach 2 | |
| Attach 4 | Draft PWS Paragraph 1.5.1 (k); |
Draft Pricing Matrix Reference:
A. Attach 2, Draft PWS, paragraph 1.5.1.k specifies that the contractor "Shall utilize Mobile Repair Teams (MRT) when requested by the USG at operating locations in the event of the following repairs, but not limited to: blending of compressor blade damage, blade crack verification, removal, and replacement of broken fuel nozzle stud, removal, and replacement of broken oil filter cover stud, PT2 blade replacements, over torques, etc.
B. Attach 4, Draft Pricing Matrix, identifies 4000-series CLINs for engine overhaul (1st, 2nd and 3rd run engines), but does not identify a specific CLIN for Mobile Repair Teams to support the level of effort for engine repairs identified in PWS 1.5.1.k Question: Will the Government please clarify if the MRT support identified in PWS 1.5.1.k is considered an "Over-and-Above" requirement, or charged to the applicable Engine Repair CLIN (4010 or 4060)? PWS has been updated in paragraph 1.5.1.k. to state that if "If Government requested, the USG will provide funding through Over & Above FFP CLIN".
If Contractor elects to utilize MRT Support, this would fall under the Repair CLIN(s).
27 Attach 2 Draft PWS, Paragraph 1.5 Reference: Attach 2, Draft PWS, Paragraph 1.5, Repair of Engines, Propellers, and Landing Gear, sub-paragraph 1.5.1 identifies the engine repair requirements.
Discussion: it is our experience that Hot Section Inspections (HSI) are required on the PT6A-68 engine mid-point between overhauls, but we did not see mention of HSI accomplishment within the scope of engine requirements for this contract.
Question 1: Will the Government please clarify if accomplishment of HSIs on the assigned PT6A-68 engines fall within the scope of this contract, or if they are accomplished by the applicable maintenance providers?
Question 2: If within the scope of this contract, which CLIN should the HSIs be charged against? Q1: This will not fall within scope of the T-6 COMBS IV Contract and is accomplished the applicable maintenenance providers.
Q2: N/A 28 Attach 5
| RFP | Section L, Instructions to Offerors, paragraph 1.0, pg 1; |
| RFP Section B, pg 3 | Reference: |
1. Attach 5, Section L, paragraph 1.0 identifies a total of 742 aircraft supported by this contract
2. RFP Section B, pg 3, identifies a total of 739 aircraft supported.
Discussion: The total numbers of aircraft supported by this contract identified in Attach 5, Section L, paragraph 1.0 and RFP Section B are not consistant. It would also be helpful to have a listing of the number of aircraft assigned to each operating location
Question A: Will the Government please verify the total number of aircraft supported by this contract?
Question B: Will the Government consider providing a table that shows the number of aircraft currently supported at each operating location? Q/A: Section L has been updated to reflect 739 aircraft.
Q/B:
Air Force: 442 -Columbus: 99 -Laughlin: 103 -Pensacola: 24 -Randolph: 41 -Sheppard: 76 -Vance: 99 Navy: 293 -Corpus Christi: 97 -Whiting Field:147 -Pensacola: 43 -Patuxent River: 6 Army: 4 -Redstone: 4
| 29 | Attach 2; | |
| Attach 4 | Draft PWS, Appendix D; | |
| Draft Pricing Matrix | Reference: |
1. Attach 2, Draft PWS, Appendix D, Estimated Workload Data, identifies the projected flying hours for each operating location, by Fiscal Year.
2. Attach 4, Draft Pricing Matrix, identifies the projected flying hours to be attributed to the Price Per Flying Hour CLINs Discussion: The projected flying hours identified in PWS Appendix D do not match all of the hours identified in the Pricing matrix calculation of the Price Per Flying Hour CLINs.
| Question: Will the Government please reconcile the projected flying hours identified in the Draft PWS Appendix D and Draft Pricing Matrix? | The PWS Appendix D reflects Fiscal Year estimates whereas the Pricing Matrix projects estimated flying hours based on anticipated Period of Performance. Vendor shall propose to the pricing matrix as directed within Volume III - Price. | ||
| 30 | N/A | N/A | Discussion: It would aid in the development of accurate Firm Fixed Price cost per flying hour if the Government could provide historical flight hour data by aircraft tail number and site location. |
| Question: Will the Government please consider providing offerors with historical flight hour data by aircraft tail number and site location? | USG will provide an attachment in the Bidder's Library to include historical total flying hours for USAF, USN, and USA by site location. |
31 Attach 2 Draft PWS, paragraph 1.3.9.c Reference: Attach 2, Draft PWS, paragraph 1.3.9.c requires the contractor to "Make available, TCI material prior to scheduled replacement date forecasted by the maintenance acivity IAW TO 1T-6A/B/D-6".
Discussion: We could not locate a listing of TCI components with their last change dates within the data provided with the Draft RFP. This is needed to accuarately calculate projected cost per flying hour.
Question: Will the Government please consider providing a current Time Change Item (TCI) component listing with last changed dates? No, reference TO 1T-6A/B/D-6 and this will provide the Time Change Items and the removal intervals.
32 Attach 8 Attachment 8_Bidder's Library_Controlled 8G-8H.xlsx Reference: File Attachment 8_ Bidder's Library_Controlled 8G-8H.xlsx, Tab June 2021 Discussion: The June 2021 tab for this file appears to include parts usage for the entire year, vice only the June 2021 data.
Question: Will the Government consider revising the June 2021 tab of file "Attachment 8_ Bidder's Library_Controlled 8G-8H.xlsx" to only include the data relevant to June 2021? USG revised June 2021 tab, update included in the Bidder's Library.
| 33 | ITO L.2.3.3, Table 2.3, L.2.3.1 and L.2.3.2 | L.2.3.1 states: The Title Page of each volume shall contain the solicitation number, name, address, and telephone of the Offeror and electronic e-mail address if available and L.2.3.2 states: A Team List of the Offeror’s primary Point of Contacts shall be submitted in each volume using the format shown in Attachment 2 of the ITO. However, L.2.3.3, Table 2.3 structure, Volume III – Price does not show L.2.3.1 and L.2.3.2 as a requirement. | Question: Will the Government please clarify if a Title Page and Team List should be submitted within Volume III – Price? | Yes, a Title Page and Team List will be required for Volume III-Price, Table 2.3 has been updated. |
| 34 | ITO L.2.3.3, Table 2.3, L.2.3.8 and L.2.3.10 | L.2.3.8 states: Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume and L.2.3.10 states: Glossary of Abbreviations and Acronyms Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. However, L.2.3.3, Table 2.3 structure, Volume II – Past Performance and Volume III – Price does not show L.2.3.8 and L.2.3.10 as a requirement. | Question: Will the Government please clarify if a Table of Contents and Glossary of Abbreviations should be submitted within Volume II – Past Performance and Volume III – Price? | No, a Table of Contents and Glossary of Abbreviatations will not be required in Volume II-Past Performance and Volume III-Price. |
| 35 | ITO L.2.4.1 | L.2.4.1 states: Page line spacing shall be 1.5 lines. However, just in Volume II – Technical requirements, this will limit the Offerors ability to adequately address all of ITO Section L and PWS requirements within a page limit of 65 pages. | Question 1: Will the Government consider “single” line spacing for the Offeror to adequately address all ITO Section L, M and PWS requirements? |
Question 2: If not, does the 1.5 line spacing also pertain to the TEAM LIST, Table of Contents, List of Tables and Figures, and Glossary of Abbreviations as well? Q/1: No the USG will not consider changing line spacing to 1.5 lines. The requirement will remain the same in 2.4.1.
Q/2: IAW Section L 2.3.2, offerors shall provide the Team List in each volume using the format shown in Attachment 2 of the ITO. The Table of Contents, List of Tables and Figures and Glossary of Abbreviations must adhere to the 1.5 line spacing requirement as described in Section L 2.4.1. Offerors are advised that the Table of Contents, List of Tables and Figures and Glossary of Abbreviations are all provided "unlimited" number of pages as described in Table 2.3, Proposal Organization.
| 36 | ITO L.3.2.3 a. | L.3.2.3 a. states: A support staffing plan. As a minimum, the plan must demonstrate an understanding of requirements and sets forth logical and adequate personnel at the Offeror’s Program Office, the T-6 Government Program Office, COMBS operating locations and Depot location. (PWS 1.1.2 and 1.1.3.1 -1.1.3.4.).The reference to PWS 1.1.3.4 does not appear in the PWS. | Question: Will the Government please modify the section L instructions to only reflect PWS 1.1.2 and 1.1.3.1 – 1.1.3.3? | Section L and M has been updated to only reflect PWS 1.1.2 and 1.1.3.1 - 1.1.3.3. |
| 37 | ITO L.3.2.3 g. (1) | L.3.2.3 g. (1) states: Additionally, large businesses shall submit a subcontracting plan IAW FAR 19.7, tailored to this contract effort | Question: Is the Subcontracting Plan excluded from the Technical Volume page limit of 65 pages? | The SBPCD and Subcontracting Plan will be excluded from the Technical Volume I page limit, Table 2.3 has been updated. |
| 38 | ITO L.2.3.3, Table 2.3 and ITO L.5.2 | Table 2.3 has L.5.2 as “Volume Organization” but L.5.2 states Pricing Support Information. | Question: Will the Government please modify Table 2.3 or L.5.2 to cite either Volume Organization or Pricing Support Information so Table 2.3 and L.5.2 has the same title reference? | Table 2.3 modified to reflect Section L.5.2. as "Pricing Support Information". |
| 39 | ITO L.5.2.4 and L.5.2.5 | L.5.2.4 states: If the Offeror has not proposed any price reductions, then state accordingly in Section 2 of the Price Volume and L.5.2.5 states: If there are no proposed price assumptions, then state accordingly in Section 2 of the Price Volume. However, it is not clear as to where Section 2 of the Price Volume is in Section L. | Question: Will the Government please clarify where Section 2 of the Price Volume is located? | Pricing Section L.5.2. section numbering revised; "Volume Organization" paragraph added (see paragraph L.5.2.10), which identifies Sections 1 and 2 of the Price Volume |
| 40 | ITO L.2.3.1, L.2.3.3, Table 2.3; L.2.3.2; L.2.3.8; L.2.3.9, and L.2.3.10 | L.2.3.1 states: The Title Page of each volume…L.2.3.2 states: A Team List of the Offeror’s primary Point of Contacts shall be submitted in each volume…L.2.3.8 states: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. L.2.3.9 states: Include an indexed list of Tables and Figures and L.2.3.10 states: Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. However, L.2.3.3, Table 2.3 does not show this structure to include these elements. | Question: Will the Government please clarify if the Offeror is to provide a Title Page, Team List, Table of contents, Tables and Figures, and Abbreviations and Acronyms for Volume III - Price? | Table 2.3 has been updated for Volume III Price and includes Title Page, Team List, Table of contents, Tables and Figures, and Abbreviations and Acronyms. |
41 ITO L.2.3.3, Table 2.3, Volume IV and L.6.1.1 Table 2.3 shows a structure for Volume IV to provide a Title Page (SF1449) prior to the Table of Contents and L.6.1.1 requires the SF1449 as well. L.6.1.1 states: Completion of blocks 12, 17 and signature and date for blocks 30a, 30b and 30c of the SF1449. Signature by the offeror on the SF1449 constitutes an offer, which the Government may accept. Question: Is it the Government’s intent to require the SF1449 to be submitted in two different areas of Volume IV Contract? Section L has been updated to reflect SF1447. The Government only requires 1 SF1447 (Title Page) for Volume IV - Contract Documentation.
Section L 6.1.1 lists the required information to be provided in the SF1447 Title Page.
| 42 | PWS 1.1.8 (a) | PWS 1.1.8 (a) states:a) Implement and maintain a quality system that satisfies program objectives and meets the requirements of AS9100C Quality Management Systems-Requirements for Aviation, Space and Defense Organizations or an equivalent system model | Question: Will the Government please clarify if their intent was to cite AS9100D instead of AS9100C? | The Government has updated Section 1.1.8. to reflect AS9100D. |
| 43 | PWS 1.1.8 (a) (2) | PWS 1.1.8 (a) (2) states: 2.Quality Management System must demonstrate a systems approach for managing quality and process controls that adequately address each applicable element of AS9120A Quality Management Systems – Requirements for Aviation, Space and Defense Distributers, and AS9133 Qualification Procedure for Aerospace Standard Parts | Question: Will the Government please clarify if their intent was to cite AS9120B instead of AS9120A? | The Government's intent was to cite AS9102B and Section 1.1.8.a.2 has been updated to reflect AS9102B. |
| 44 | ITO L.2.3.3, Table 2.3, Vol II and Vol IV | Table 2.3 shows ITO Paragraph Numbers for Title Page as 2.2.1 and the Team List as 2.2.2 whereas Section L references are 2.3.1 and 2.3.2 respectively | Question: Will the Government please update Table 2.3 to reflect the ITO Paragraph Numbers as 2.3.1 Title Page and 2.3.2 for the Team List? | Table 2.3. has been updated. |
| 45 | ITO L.2.3.1 and L.2.5 | L.2.3.1 states: The Title Page of each volume shall contain the solicitation number, name, address, and telephone of the Offeror and electronic e-mail address if available and L.2.3.2 states: A Team List of the Offeror’s primary Point of Contacts shall be submitted in each volume using the format shown in Attachment 2 of the ITO. However, L.2.3.3, Table 2.3 structure, Volume III – Price does not show L.2.3.1 and L.2.3.2 as a requirement. L.2.3.1 states: 2.3.1 The Title Page of each volume shall contain the solicitation number, name, address, and telephone of the Offeror and electronic e-mail address if available. L.2.5 states: A cover sheet shall be included in each proposal volume, clearly marked as to volume number, title, copy number, solicitation identification, and the Offeror’s name. Title Page is mentioned throughout the RFP and Cover Sheet is only mentioned once which is in L.2.5. | Question: Will the Government please clarify if the Cover Sheet is the same as the Title Page? | Section 2.5 has been updated to reflect Title Page versus Cover Sheet. Also, References to Title Page (L.5.1.1.) will be added to Volume III - Price. |
| 46 | RFP, PART I - The Schedule; Section B; Supplies Or Services and Prices/Costs | Nowhere in PART I – Section B is there a reference to Ordering Procedures for 30XX and 31XX Flight Hour CLINS | Question: Without Ordering Procedures for 30XX and 31XX, how will the Government order flight hours (i.e., monthly, quarterly, yearly)? | USG intends to order monthly and/or quarterly and IAW FAR 52.216-18 & FAR 52.216-19. Fill-ins for these clauses will be provided at final RFP. |
| 47 | PWS 1.1.2.2 a) 1. | After receipt from the USN, preposition and maintain levels of supply for each part listed in Appendix E to support Navy Depot requirements and manage repairs, replacements, replenishments, and reporting IAW this PWS | Question: Will the Contractor be responsible for procuring parts in Appendix E or will the Government procure parts listed in Appendix E and provide to Contractor? | After receipt from the Navy, the Contractor will be responsible for repair, replacement, replenishment, and reporting. |
| 48 | PWS 1.3.13 b) 2. | For consumable and repairable material not provided in TCTO/TD materials list, or as identifies as ancillary above, the USN will provide funds through cost reimbursable CLINs | Question: How will this be accomplished with no cost reimbursable CLINS and with 52.243-2 Changes Cost Reimbursement excluded from Part II – Contract Clauses Section 1 Contract Clauses? | USG updated PWS 1.3.13.b.2. with Firm Fixed Price, Over and Above CLIN. |
49 PWS 1.3.3 a) 20. Interface/Integrate Enterprise Resource Planning: Provides the ability to interface and integrate with an ERP system. The integrated management of core business processes, often in real-time and mediated by software and technology Question 1: Is the PWS reference asking for the system to integrate with any ERP system or are there specific ERP system requirements to integrate with a Government system(s)?
Question 2: If so, which Government systems?
Q1: PWS 1.3.3.a.20 Interface requirments removed.
50 PWS 1.1. i) Acquire and maintain technical documentation Question 1: What is the Government’s definition of acquire and does the Government interpret this requirement to mean all applicable regs mentioned in the contract/PWS?
Question 2: If OEM or USG owned, will USG provide initial and updates? Q1/Q2: USG owned technical documentation will be provided upon request. Changes, supplements, and amendments to regulations will be the responsibility of the contractor.
The USG intends for the COMBS provider to have in place agreements for OEM technical documentation IAW PWS 1.1.1.
| 51 | PWS 1.1.2.1 f) | Provide on-call services to all locations, outside of normal flying and maintenance operations, to issue Non-Mission Capable Supply/Partial Mission Capable Supply (NMCS/PMCS) requirements within 90 minutes upon notification excluding FRCSE | Question: Did the Government intend to include AFTD as well? | Yes, if requested on-call services will be required within 90 minutes upon notification. | |
| 52 | PWS 1.1.13. |