Attachment_1_C-12_Descriptions_and_Specifications.pdf

PDF 100 KB Posted

Attached to
Contractor Logistic Support for C-12 Aircraft Federal contract opportunity
Solicitation number
FA8106-15-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Attachment_1_C-12_Descriptions_and_Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Contractor Logistic Support for C-12 Aircraft, newest first.
File Type Posted
FA810615R0007_______0003.pdf PDF
Attachment_5_C-12_Performance_Work_Statement.pdf PDF
RFP_Questions_and_Answers-2-25-16.pdf PDF
Attachment_7_C-12_Section_L_Instructions_to_Offerors.pdf PDF
Attachment_1_C-12_Descriptions_and_Specifications.pdf PDF
FA810615R0007_______0002.pdf PDF
Attachment_1_C-12_Descriptions_and_Specifications.pdf PDF
Attachment_9_C-12_Pricing_Matrix.docx DOCX document
Attachment_7_C-12_Section_L_Instructions_to_Offerors.pdf PDF
FA810615R0007_______0001.pdf PDF
Attachment_4_C-12_Deliveries_Or_Performance.pdf PDF
Attachment_6_C-12_Government_Furnished_Property.docx DOCX document
Attachment_5_C-12_Performance_Work_Statement.pdf PDF
Attachment_10_C-12_Wage_Determinations.docx DOCX document
Attachment_8_C-12_Section_M_Evaluation_Factors_for_Award.pdf PDF
RFP_Questions_and_Answers-2-5-16.pdf PDF
ppi_tool.accdb —
Attachment_9_C-12_Pricing_Matrix.docx DOCX document
Attachment_8_C-12_Section_M_Evaluation_Factors_for_Award.pdf PDF
Exhibit_A_C12_Contract_Data_Requirements_Lists.pdf PDF
Attachment_6_C-12_Government_Furnished_Property.docx DOCX document
FA810615R0007_C-12_CLS.pdf PDF
Attachment_2_C-12_Packaging_and_Transport.pdf PDF
Attachment_11_C-12_DD254_and_Continuation_Sheet.pdf PDF
Attachment_5_C-12_Performance_Work_Statement.pdf PDF
Attachment_7_C-12_Section_L_Instructions_to_Offerors.pdf PDF
Attachment_3_C-12_Inspection_and_Acceptance.pdf PDF
Attachment_4_C-12_Deliveries_Or_Performance.pdf PDF
Attachment_10_C-12_Wage_Determinations.pdf PDF
DRAFT_RFP_Questions_and_Answers_10_Dec_2015.pdf PDF
C-12_PWS.pdf PDF
DRAFT_RFP_Questions_and_Answers.pdf PDF
Draft_Pricing_Matrix.docx DOCX document
Draft_DD254_C_12_CLS.pdf PDF
C-12_DD254_Continuation_Sheet.pdf PDF
C-12_CLS_-_CDRLS.pdf PDF
EXPORT_CONTROLLED 1 .pdf PDF
Tech_Data_Access_Request.docx DOCX document
RFI_-_C-12_CLS_Small_Business_Subcontracting_Concerns_9-3-15.docx DOCX document
C-12_CLS_Pre-Solicitation_Conference_Clarifications.docx DOCX document
Pre-Solicitation_Conference_Charts.pptx PPTX presentation
Pre-Solicitation_Conference_Information.docx DOCX document
DRAFT_Section_M_-_15_Jul_15.pdf PDF
DRAFT_RFP_-_FA8106-15-R-0007_-_15_Jul_15.pdf PDF
DRAFT_Section_F_-_15_Jul_15.pdf PDF
DRAFT_Section_D_-_15_Jul_15.pdf PDF
DRAFT_Section_L_-_15_Jul_15.pdf PDF
DRAFT_PWS_for_C-12_-_15_Jul_15.pdf PDF
DRAFT_Section_E_-_15_Jul_15.pdf PDF
DRAFT_Section_C_Descriptions_and_Specifications-_15_Jul_15.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAF C-12

Contractor Logistics Support

PART III – LIST OF DOCUMENTS, EXHIBITS AND

OTHER ATTACHMNETS

SECTION J

Contract: FA8106-15-R-0007

(31 Dec 15)

ATTACHMENT 1 – DESCRIPTIONS AND SPECIFICATIONS

1. CONFORMANCE

(a) The Contractor shall, in conformance with the contract provisions set forth in solicitation/contract and all attachments, furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in the Performance Work Statement, Annexes, and Appendixes.

(b) Section K (Representations, Certifications, and other statements of Offeror), as signed.

2. NOTES AND CLIN DESCRIPTIONS –

The following Contract Line item Number (CLIN) descriptions apply to the Air Force C-12 contract. All firm-fixed prices shall include all direct and indirect costs, such as overhead, G&A expense and profit.

All pricing shall be entered the PRICING MATRIX. Line item Extended Totals are for evaluation purposes only.

Note that estimated quantities are provided in Section M, Evaluation Factors for Award. Failure of the Government to order such items in the amounts or quantities described in the schedule as “estimated” will not entitle the Contractor to any equitable adjustment in price.

The Contractor is responsible for arranging all international movement of material in accordance with all applicable International aand US Customs Regulations.

X001 Base Operations Support: This CLIN, covers all labor necessary for the maintenance support, to include Attachment 1, PWS, Sections 1.2, 1.3, 1.4, 1.5, 1.9, 1.10, 1.11, 1.12, 1.13, and 1.21 for the Air Force C-12 aircraft. This CLIN covers all Contractor site staff necessary to provide technical maintenance skills at each Main Operation Base (MOB). This CLIN covers all Contractor provided services which are necessary to meet scheduled mission requirements and provide for 24-hour coverage of priority requirements and on-call support.

NOTE: Under this CLIN due consideration shall be given to ensure that site personnel at the DIA and DSCA sites are adequately compensated including hardship pay and difficult-to-staff pay, per Department of State (DoS) guidelines.

This CLIN covers all Contractor provided MOB capabilities necessary to perform C-12 maintenance to achieve the required MC rate. This CLIN covers the Contractor Operated and Maintained Base Supply (COMBS) at each site which are necessary to conduct logistics operations to maintain MC rates. This CLIN covers Contractor initial stocking of spares and repair parts in the COMBS and also includes replenishment, as required, of bench stock, consumable materials, tools and support equipment not provided as Government Furnished Property (GFP). This CLIN covers all packaging, shipping, and marking requirements. This CLIN covers all costs associated with custom clearance processes. This CLIN covers the Contractor efforts necessary to develop, operate and maintain a supply ordering and inventory system. This CLIN covers the Contractor’s efforts necessary to provide, coordinate and manage off-site repair, inspection and calibration of all spares, components and Contractor provided support equipment for the aircraft, aircraft systems, subsystems and engines. This CLIN covers the database subscription services necessary for aircraft navigation systems. This CLIN covers all travel and per diem costs for off-site recovery of grounded aircraft within a 200-mile radius of the aircraft’s home site. This CLIN covers the Contractor’s efforts necessary to identify any inadequacies or non-availability of items impacting MC rate and identify corrective action for obtaining those items.

This CLIN covers the transportation of spares, components, and unique support equipment to and from the repair and overhaul source and from the COMBS and suppliers to an aircraft regardless of location. A Firm-Fixed Price (FFP) per month shall be proposed under this CLIN for each main operating base MOB. The FFP per month, per MOB, shall cover all costs necessary to support Base Operations for the C-12 aircraft based at that MOB. This CLIN covers all labor costs for all aircraft Service Action requirements for the C-12 fleet when such requirements are within the capability of the site personnel to perform. This CLIN covers the management labor costs except as defined by CLIN X013. This CLIN covers all costs associated with preparing and delivering all reporting requirements of the PWS including all Contract Data Requirements Lists (CDRLs). CDLRs are not separately priced.

In event of the Missions Capability Requirements addressed in PWS are not met, then the Reduced Payment as outlined in Attachment 1, PWS, Sub-Section 1.2.2 would apply.

NOTE: There shall be a minimum of an equivalent of two (2) full-time technicians manning the C-12 sites at Ankara and Cairo.

NOTE: If the monthly flying hour estimate for a site, provided in CLIN X002, are exceeded by 30% or more for three consecutive months, or the flying hours flown at a site is less by 30% or more for three consecutive months; the Government and the Contractor each may, under the “Changes” clause, renegotiate the Base Operations Support price at that site, as deemed necessary.

The Base Operations Support CLIN (X001) includes the following priced sub-CLINs.

X001AA Defense Intelligence Agency (DIA) This Sub-CLIN includes base operations support at the following DIA sites Buenos Aires, Argentina Budapest, Hungary Bangkok, Thailand Gaborone, Botswana Manila, Philippines Tegucigalpa, Honduras Bogotá, Columbia Brasilia, Brazil Accra, Ghana Nairobi, Kenya Andrews AFB, MD (60%)* Rabat, Morocco Islamabad, Pakistan

* DIA and DSCA split responsibility for the cost of running this site. DIA will pay for 60% of the cost and DSCA will pay the remainder.

X001AB Defense Security Cooperation Agency (DSCA) This Sub-CLIN includes base operations support for the C-12 aircraft based at the following DSCA sites Ankara, Turkey Cairo, Egypt Andrews AFB, MD (40%)**

** DSCA and DIA split responsibility for the cost of running this site. DSCA will pay for 40% of the cost and DIA will pay the remainder.

X001AC Air Force Material Command (AFMC)/Pacific Air Force (PACAF) This Sub-CLIN includes base operations support at the following AFMC/PACAF sites Yokota AFB, Japan Elmendorf AFB, AK Edwards AFB, CA (Pilot training)

X001AD 586th Flight Test Squadron, Holloman, AFB, NM This Sub-CLIN includes base operations support the C-12 aircraft based at Holloman AFB NM

X001AE 412th Flight Test Wing, Edwards AFB, CA This Sub-CLIN includes base operations support the C-12 aircraft based at Edwards AFB, CA

X001AF Riyadh, Saudi Arabia This Sub-CLIN includes base operations support the C-12 aircraft based at Riyadh, Saudi Arabia

X002 Flying Hour Support: This CLIN covers all Contractor provided supply items and replenishment spares necessary, for maintenance support as described in PWS, Sections 1.4, 1.5, 1.6, 1.7, 1.8, and 1.21. Included under this CLIN are all parts and materials required to accomplish engine Hot Section Inspections (HSI). Such support shall also include the replenishment of spare parts inventories in the COMBS, as necessary. It also includes the furnishing of spare parts, not stocked in the COMBS, which are required to maintain the Air Force C-12 aircraft. The parts installed on the aircraft shall follow the processes outlined in the Title 41 Part 102-39 and Federal Management Regulation (FMR) Part 102-33 and shall be considered exchange parts. The contractor will process life limited parts and flight safety critical aircraft parts (FSCAP), and provide documentation in accordance with Federal Management Regulation parts (33 and 39). This support shall not include labor, which is covered under the Base Operations Support CLIN. This CLIN covers all packaging, shipping, and marking requirements for replenishment spares. This CLIN covers all costs associated with custom clearance processes. A fixed rate per flying hour rate shall be established at the time of contract award for the appropriate C-12 model aircraft for the flying hour quantity estimates specified for each site under the CLIN.

NOTE: Due to the minimal variance between the C and D model aircraft, C and D models shall have the same flying hour rate.

The Government will reimburse the Contractor each month under the sub-CLINs established under CLIN X002. The amount paid each month for each sub-CLIN will equal the sum of the total due at each site under that sub-CLIN The amount paid by Government per site will be equal to the total flying hours flown in the month by the aircraft assigned to that site multiplied by the established rate.

NOTE: The Government and the Contractor reserve the right to renegotiate the Baseline Support FH prices and FH Capacities (Price Matrix) at any site where the actual/anticipated AVG aircraft FH utilization has varied by 30% of the AVG monthly FHs per aircraft at a site for 3 consecutive months.

The Flying Hour Support CLIN X002 includes sub-CLINs X002AA through X002AE. For each sub-CLIN, the table below identifies the CLIN title, applicable Flying Hour Rate and the Air Force estimate for the flying hours per month to be flown at each site.

Flying Hour CLINs

Sub-CLIN

CLIN Title, Rate and Estimated Quantities

X002AA Defense Intelligence Agency (DIA)

Flying Hour Rate (C/D Model A/C)

Sites:

Estimated Quantity per Month

Unit

Nairobi, Kenya 20 FH Manila, Philippines 18 FH Gaborone, Botswana 25 FH Bogotá, Colombia 20 FH Andrews AFB, MD* 65 FH

Bangkok, Thailand 17 FH Accra, Ghana 45 FH Budapest, Hungary 29 FH Buenos Aires, Argentina 20 FH Brasilia, Brazil 20 FH Ankara, Turkey 18 FH Cairo, Egypt 14 FH Tegucigalpa, Honduras 26 FH

Rabat, Morocco 20 FH Islamabad, Pakistan 15 FH

X002AB Defense Security Cooperation Agency (DSCA)

Ankara, Turkey 18 FH Cairo, Egypt 18 FH Andrews AFB, MD 21 FH Buenos Aires, Argentina 9 FH Bogota, Columbia 16 FH Nairobi, Kenya 6 FH

Islamabad, Pakistan 9 FH

X002AC Air Force Material Command (AFMC)

Flying Hour Rate (Pilot Training) (C Model A/C)

C/D Model, Pilot Training, Edwards AFB

31 FH

X002AD 586th Flight Test Squadron, Holloman, AFB, NM

Flying Hour Rate (J Model A/C)

Holloman AFB, NM 40 FH

X002AE 412th Flight Test Wing, Edwards AFB, CA

Flying Hour Rate

Edwards AFB, CA 102 FH

X002AF Pacific Air Force (PACAF)

Flying Hour Rate (J Model A/C)

Yokota AFB, Japan 160 FH

X002AG Pacific Air Force (PACAF)

Flying Hour Rate (F Model A/C)

Elmendorf AFB, AK 80 FH

X002AH Riyadh, Saudi Arabia

Riyadh, Saudi Arabia 75 FH X002AJ 586th Flight Test Squadron, Holloman, AFB, NM

Flying Hour Rate (F Model BV-08)

Holloman, AFB, NM 9 FH

X003 Reserved.

X004 Propeller Overhaul: This CLIN covers, at a firm-fixed unit price, overhauls of the propellers. The propeller overhauls under this CLIN will be accomplished on a “per occurrence” basis in accordance with Attachment 1, PWS, Sub-Section 1.25.11, entitled “Propeller Overhaul”. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO. The firm-fixed unit price includes costs associated with the overhaul, packaging, and shipping of propellers.

The FFP excludes the cost of parts and material for Technical Directive (TD) compliance for TDs issued after the date of contract award.

X005 Aircraft Condition Inspection (ACI): This CLIN covers ACIs performed under this contract. An ACI will be performed on a per occurrence basis at a FFP per unit. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO. An ACI shall be performed in accordance with Attachment 1, PWS, Sub-Section 1.25.3, entitled “Aircraft Condition Inspection” of Attachment 1, PWS, and Appendix K entitled “Aircraft Condition Inspection.” The FFP shall include labor, services, equipment, tools, tooling, lubricants fuel, direct and indirect parts and material, necessary to perform the ACI, repair minor defects found in areas which are not normally inspected at the site, treating and correction of light corrosion removable by chemical cleaners and repairable by chemical treatment, light to moderate corrosion removable by manual application of mild abrasive compounds or soft grit blasting and repairable by chemical treatment, moderate to severe corrosion removable by mechanical methods and repairable by chemical treatment and any discrepancies elected for repair by the Contractor. The FFP also includes Contractor performance of post ACI functional check flights (FCFs) and incorporation of bulletins, modifications, and TDs issued prior to contract award. Upon completion of the ACI (and FCFs), the aircraft will be presented to the accepting flight crew with a full load of fuel. Flight hours for contractor performed FCF's during ACI will not be charged against CLIN X002.

The FFP does not include the labor and materials to correct major defects discovered which are in areas not normally inspected at the site (reference page K-6 and K-7 of Appendix K for definition of major and critical defects), discrepancies that require skills, tools or other support available only at the depot facility, repair of severe corrosion damage removable by mechanical methods and repairable by Structural Repair Manual and severe corrosion not removable by any method and requires replacement of the affected part and repair of discrepancies directed by the Government representative which would otherwise be performed at the home operating site, over and above work directed by the Government , engine and propeller changes or incorporating bulletins, modifications and TDs issued after contract award. These items will be reimbursed as an Over & Above (O&A) when approved by the ACO/PCO. Parts and materials to correct the major defects referenced above in this paragraph shall be paid for by the Government on a Cost Reimbursable (CR) basis under CLIN X016, O&A Parts and Material (Aircraft).

Labor required to correct these major defects shall be paid for by the Government under CLIN X010 entitled Aircraft Labor (Depot). The Contractor shall have 30 calendar days from the date of induction to ACI to submit a proposal for any additional labor, parts or materials needed to complete the effort. If the Contractor requires more time to submit their proposal, then they shall submit a written request to the PCO (email may be used) for an extension of the proposal due date.

Discrepancies that should have been corrected during performance of on-site support shall not be included in the FFP of an ACI or reimbursed as O&A maintenance during an ACI, but must be repaired before leaving the ACI at the Contractor’s expense, unless approved by the Government prior to induction into the ACI. This includes the correction of all discrepancies which would prevent the aircraft from conducting flight operations in icing conditions under Instrument Flight Rules (IFR) and/or extended over water flights.

X006 Engine Overhaul: This CLIN covers engine overhauls. Engine overhauls will be performed at a FFP on a per occurrence basis. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO. Engine overhauls shall be performed in accordance with Attachment 1, PWS, Sub-Section 1.25.1.”Engine Time Between Overhauls (TBOs)/Off Aircraft Maintenance”. The FFP for overhaul engines shall include returning the engine requiring overhaul to a serviceable condition and will cover the cost of shipping, packaging and handling required to transport the engine to and from the engine repair facility Title for the engine removed from the aircraft shall remain with the Government. The replacement engine shall be freshly overhauled, capable of meeting its next engine Time Between Overhaul (TBO) limit. Therefore, the per occurrence FFP shall include all labor, services, equipment, tools, facilities, fuel, lubricants, mandatory replacement parts and materials, indirect materials necessary to perform the overhaul requirements.

On condition parts and parts and material costs for performance of TDs and/or Service Actions, mandatory and/or non-mandatory, issued after date of contract award and authorized by the Government are excluded from the firm-fixed unit price and shall be paid for by the Government under a CR basis under CLIN X017 entitled “Parts and Material (Engines)”. Labor for these efforts shall be paid for by the Government under a CR basis under CLIN X012 “Engine Repair Labor”. The Contractor shall have 30 calendar days from the date of engine induction to overhaul to submit a proposal for any additional labor, parts or materials needed to complete the effort. If the Contractor requires more time to submit their proposal, then they shall submit a written request to the PCO (email may be used) for an extension of the proposal due date.

NOTE: Contractor-provided engines shall be utilized, when a Government-owned engine is not available to replace a removed engine. The Air Force will not rent engines and provide them to the Contractor. The cost of a Contractor-provided engine (including transportation) to replace a PT6A-42 model engine that has been removed for overhaul shall be covered in the flying hour rate under the appropriate X002 sub-CLIN. The cost of a Contractor-provided engine (including transportation) to replace a PT6A-41 or a PT6A-65 engine that has been removed for overhaul will be covered under CLIN 0018, Other Efforts.

X007 Engine Tear-Down and Inspection (TD&I) - Repair Only: This CLIN covers engine TD&Is. The TD&I shall be performed at a FFP and on a per occurrence basis. Engine TD&I shall be performed for engines requiring repair at a manufacturer approved repair facility as described in accordance with Attachment 1, PWS, Section 1.6, “Engine Maintenance” and Sub-section 1.25.1, “Engine Time Between Overhauls (TBOs)/Off Aircraft Maintenance”. This FFP will cover the cost of shipping, packaging and handling required to transport the engine to and from the engine repair facility and the labor required to tear-down for inspection and build up of the engine. The Contractor shall be responsible for all customs requirements for engine shipment. Parts and material needed to correct engine defects shall be paid for by the Government on a CR basis under CLIN X017 “Parts and Material (Engines).” Any additional labor required to correct engine defects (excluding engine build up) shall be paid for by the Government under CLIN X012 “Engine Repair Labor”. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO.

NOTE: Contractor-provided engines shall be utilized, when a Government-owned engine is not available to replace removed engine. The Air Force will not rent engines and provide them to the Contractor. The cost of a Contractor-provided engine (including transportation) to replace a PT6A-42 model engine that has been removed for repair shall be covered in the flying hour rate under the appropriate X002 sub-CLIN. The cost of a Contractor-provided engine (including transportation) to replace a PT6A-41 or a PT6A-65 engine that has been removed for repair will be covered under CLIN 0018, Other Efforts. The Contractor shall have 30 calendar days from the date of engine induction to repair to submit a proposal for any additional labor, parts or materials needed to complete the effort. If the Contractor requires more time to submit their proposal, then they shall submit a written request to the PCO (email may be used) for an extension of the proposal due date.

X008 Reserved

X009 Reserved

X010 Aircraft Labor (Depot): This CLIN covers Contractor labor to be performed in accordance with Sub-Sections 1.25.3, 1.25.6, and 1.25.7 of Attachment 1, PWS. This CLIN shall be used whenever major on-aircraft repairs at a FAA certified repair facility are required. This labor will be performed on a per occurrence basis and will be priced at the fixed-hourly composite rate (including overhead and profit) established in the contract at the time of contract award. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO.

NOTE: In accordance with the Procedures, Guidance, and Information (PGI) 217.7701 referenced at DFARS 217.7701, and the Clause at DFARS 252.217-2028, to the maximum extent practical, over and above work performed under this CLIN shall be negotiated prior to performance of the work.

X011 Aircraft Labor (Non-Depot): This CLIN covers Contractor provided labor to repair or maintain the aircraft (excluding the engine) in accordance Attachment 1, PWS, Sub-sections 1.25.5, 1.25.6, and 1.25.8, that is not otherwise covered under the Base Operations Support CLIN X001 and does not require that work be performed at a FAA certified repair facility. This labor will be performed on a per occurrence basis and will be priced at the fixed-hourly rate (including overhead and profit) established in the contract at the time of contract award. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO.

NOTE: In accordance with the Procedures, Guidance, and Information (PGI) 217.7701 referenced at DFARS 217.7701, and the Clause at DFARS 252.217-2028, to the maximum extent practical, over and above work performed under this CLIN shall be negotiated prior to performance of the work.

X012 Engine Repair Labor: This CLIN covers the labor for the repair or completion of the overhaul of the aircraft engine at a manufacturer approved facility in accordance with Attachment 1, PWS, Section 1.6 and Sub-Section 1.25.1”. It does not cover labor that is included in the Base Operations Support CLIN X001 and the Engine TD&I CLIN X007. This labor will be performed on a per occurrence basis and will be priced at the fixed-hourly rate (including overhead and profit) established in the contract at the time of contract award. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO.

NOTE: In accordance with the Procedures, Guidance, and Information (PGI) 217.7701 referenced at DFARS 217.7701, and the Clause at DFARS 252.217-2028, to the maximum extent practical, over and above work performed under this CLIN shall be negotiated prior to performance of the work.

X013 Modifications: This FFP CLIN covers O&A work performed in accordance with Attachment 1, PWS, Sub-Section 1.25.6, “Aircraft Modifications”. The sub-CLINs under this CLIN are not priced prior at contract award. However, a composite material wrap rate (CMWR), composite subcontract wrap rate (CSWR) and composite labor wrap rate (CLWR) shall be included in the contract for the basic and each option year at the time of contract award. The CMWR and CSWR shall include all applicable indirect material rates, Cost of Money (COM) rate and profit. The CLWR shall include the applicable direct labor rate, all applicable indirect rates, COM and profit. These rates shall apply to all sub-CLINs.

Before accomplishing any requirement under this CLIN the contractor shall propose the cost of the direct material dollars, subcontracting dollars, and the number of labor hours required. The total cost to the Government for accomplishing the requirement will be calculated by multiplying an agreed-to direct material and subcontracting dollars cost by the applicable CMWR and CSWR; and adding this total to the total for labor. The total for labor will be calculated by multiplying the agreed-to number of labor hours by the applicable CLWR. For the purposes of this CLIN, the CSWR rate applied to Interdivisional Transfers proposed as “subcontracts” shall be inclusive of all markups throughout all Interdivisional levels applied to the subcontract cost.

The requirement shall be authorized in advance by PCO/ACO. In addition, each identified requirement shall normally be negotiated prior to PCO/ACO authorization as a FFP effort with a separate PWS, as applicable. O&A work is performed under this CLIN, only when the work is not covered under any other CLINs in the contract, falls within the general scope of the contract, and work cannot be reimbursed under the hourly composite rate O&A CLINs. This CLIN covers the management labor hours used to manage the aircraft modification or upgrade effort and not covered under any other CLIN. Types of O&A effort to be accomplished under this CLIN include work to modify and or upgrade the current aircraft configuration.

X014 Reserved.

X015 Travel and Per Diem: This CR CLIN covers all Contractor travel and per diem necessary to provide maintenance support for the C-12 aircraft, to include travel for aircraft recovery at a location other than the home site in accordance with Attachment 1, PWS. The Government will reimburse the Contractor for travel and per diem costs for efforts not included in another CLIN of the contract, on the basis of allowable actual costs incurred up to the equivalent allowed a Government employee in “The Joint Travel Regulations – Uniformed Service Members and DoD Civilian Employees” for domestic travel and the Department of State Regulations for foreign travel. Travel to and from military installations shall be accomplished via Government transportation to the maximum extent possible. Travel and per diem costs incurred in Contractor-directed replacements, backfill for vacations, emergencies, etc. of personnel or the attendance of Contractor-directed training courses shall not be reimbursed.

Contractor personnel shall be authorized Government quarters, when available, while performing official travel. For the purpose of utilizing Government quarters, Contractor personnel are considered equivalent to a GS-11. All travel and per diem accomplished under this CLIN for the purpose of performing these actions shall be authorized in advance by the PCO/ACO.

The Contractor may include its allowable, allocable, and reasonable charges in accordance with FAR 52.216-7, “Allowable Cost and Payment,” for cost reimbursable travel and per diem. Fee/Profit is UNALLOWABLE under this CR CLIN.

X016 Parts and Material (Aircraft): This CR CLIN covers all direct parts, material, and support equipment necessary to accomplish O&A work requirements for the C-12 aircraft (excluding engine work), which is not covered under any other CLINs of the contract. The Government will reimburse the Contractor for the allowable actual cost of purchase and replenishment of direct parts and material or support equipment that are necessary for the performance of the work requirements of this contract, parts, and material required due to the performance of a TD on the aircraft systems, landing gear and propellers issued after the date of contract award, or as otherwise specified in PWS Section 1.25, “Over and Above (O&A)”. “Direct Parts and Materials” are defined as property that is incorporated into or attached to a deliverable end item or that is expended in performing the maintenance and logistics support on the aircraft and support equipment. The parts installed on the aircraft shall follow the processes outlined in the Title 41 Part 102-39 and Federal Management Regulation (FMR) Part 102-33 and shall be considered exchange parts. The contractor will process life limited parts and flight safety critical aircraft parts (FSCAP), and provide documentation in accordance with Federal Management Regulation parts (33 and 39). The Contractor shall be allowed its normal material burdens in accordance with FAR 52.216-7, “Allowable Cost and Payment,” and actual shipping costs.

Types of effort to be accomplished under this CR CLIN include those efforts necessary to repair or maintain the aircraft to its current configuration and include:

Replacement of Government-owned GSE Parts and material needed to accomplish site relocation Parts and material needed to complete an ACI not already covered under ACI CLIN X005 Parts and material needed to repair FOD damage Parts and material needed to repair crash damage Parts and material needed to repair damage that is not a result of normal wear and tear

Fee/Profit is UNALLOWABLE on CR parts and materials. All direct parts, material and support equipment provided under this CLIN shall be authorized in advance by the PCO/ACO.

X017 Parts and Material (Engines): Under this CR CLIN, the Contractor shall provide all direct parts, material and support equipment necessary to accomplish engine work requirements for the C-12 aircraft in accordance with the requirements of Attachment 1, PWS, Sub-Section 1.25.1, “Engine Time Between Overhauls (TBOs)/Off Aircraft Maintenance” not covered under Engine Overhaul CLIN X006 or the Engine TD&I CLIN X007. The Government will reimburse the Contractor for the allowable actual cost to purchase direct parts and materials that are necessary as a result of engine repair, parts and material required due to the performance of a TD on the engine, on-condition parts and materials necessary for engine overhaul or to purchase replacement engines. The parts installed on the engine shall follow the processes outlined in the Title 41 Part 102-39 and Federal Management Regulation (FMR) Part 102-33 and shall be considered exchange parts. The contractor will process life limited parts and flight safety critical aircraft parts (FSCAP), and provide documentation in accordance with Federal Management Regulation parts (33 and 39).Fee/Profit is UNALLOWABLE on CR parts and materials. All direct parts, material and support equipment provided under this CLIN shall be authorized in advance by the PCO/ACO.

X018 Other Efforts: Under this CR CLIN, the Contractor shall provide all direct parts, material, support equipment, subcontracting costs and vendor costs necessary to accomplish efforts in accordance with Attachment 1, PWS, Section 1.25 not covered under any other CLIN of the contractor. This CLIN also covers Contractor dependent schooling, Contractor-provided engines and purchasing title to Contractor spares. The requirement and shall be authorized in advance by the PCO/ACO.

Fee/Profit is UNALLOWABLE for the CR efforts performed under this CLIN. Any Contractor effort to meet the requirements under this CLIN shall be authorized in advance by the PCO/ACO.

X019 Reserved.

X020 Phase-Out: This FFP CLIN covers all Contractor tasks necessary to accomplish phase-out operations to include all direct and indirect labor and services necessary to perform the requirements of Attachment 1, PWS, Sub-Section 1.24.2 “Phase-Out Period” and the approved Transition Phase-Out Plan.

X021 Phase-In: This FFP CLIN covers all Contractor tasks necessary to accomplish phase-in operations to include all direct and indirect labor and services necessary to perform the requirements of Attachment 1, PWS, Sub-Section 1.24.1 “Phase-In Period” and the approved Transition Phase-In Plan (Base Year Only).

File details come from the government source that posted it. Updated .