FA8101-15-R-0007.pdf

PDF 2 MB Posted

Attached to
Tinker AFB CE Services-Operations Mgmt Federal contract opportunity
Solicitation number
FA8101-15-R-0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

FA8101-15-R-0007

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB CE Services-Operations Mgmt, newest first.
File Type Posted
Pricing_Matrix_Final_Rev_C_Supplemental.xlsx XLSX spreadsheet
4.9_Minimum_Team_Complement_Rev_D_8-20.pdf PDF
Section_M_CE_Ops_Rev_A_8-20.pdf PDF
FA8101-15-R-0007-0005.pdf PDF
Remaining_Question_13_Aug_15.pdf PDF
4.9_Minimum_Team_Complement_Rev_C.pdf PDF
FA8101-15-R-0007-0004.pdf PDF
Section_L_CE_Ops_Rev_A.pdf PDF
FA8101-15-R-0007-0003.pdf PDF
4.9_Minimum_Team_Complement_Rev_B.pdf PDF
Pricing_Matrix_Final_Rev_B.xlsx XLSX spreadsheet
Q A_6.pdf PDF
Final_Operations_PWS_30_July_15.pdf PDF
Pricing_Matrix_Final_Rev_A.xlsx XLSX spreadsheet
Revised_Appendices.zip ZIP file
FA8101-15-R-0007-0002.pdf PDF
New_Appendices.zip ZIP file
ppi_tool.accdb —
4.3_Deliverable_List.xlsx XLSX spreadsheet
Q A__5.pdf PDF
Q A__4.pdf PDF
Teamsters_CBA_2013-2016.pdf PDF
DB_WD_Highway_OK15.pdf PDF
Section_L_CE_Ops.pdf PDF
WD_2005-2431_Rev_19.pdf PDF
4.6_Workload_Data.zip ZIP file
DB_WD_Heavy_OK26.pdf PDF
4.4_Environmental_Requirements.zip ZIP file
4.9_Minimum_Team_Complement.pdf PDF
4.3_Deliverable_List.zip ZIP file
4.7_GFP.zip ZIP file
DB_WD_Building_OK49.pdf PDF
DD254_Redacted.pdf PDF
Final_Operations_PWS.pdf PDF
4.5_Maps_and_Facility_Drawings.zip ZIP file
4.1_Acronyms _Abbreviations_and_Definitions.zip ZIP file
Pricing_Matrix_Final.xlsx XLSX spreadsheet
Tinker_IAM_CBA_2013-2016.pdf PDF
Section_M_CE_Ops.pdf PDF
4.2_Applicable_Pubs.zip ZIP file
4.8_SOP.zip ZIP file
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local t ime 07 Aug 2015

X

A X B

C D

EX

X G F 416 - 427

428 - 431 X H 432

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 432

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

FA8101 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 347

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

349 - 367 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 368 - 370 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 371 - 378 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

379 - 414

PART II - CO NTRACT CLAUSES

AFSC/PZIOA

KIMBERLY DELONG/405-739-3744

7858 5TH ST STE 1

TINKER AFB OK 73145-9125 405-739-3744

405-739-7957FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

F3Y0AA3003A006

5. DATE ISSUED

08 Jul 2015

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

FA8101-15-R-0007

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

Transition-in

FFP

Transition-In

PWS 1.6 to 1.6.2.4

FOB: Destination

NET AMT

1001 12 Months

OPTION Work Request & Management

FFP

Work Request & Management of Service Calls (DSW)

PWS 1.1.1 to 1.1.2.2.2.3

Option I

1 July 2016 - 30 June 2017

PURCHASE REQUEST NUMBER: F3Y0AA3003A006

1002 12 Months

OPTION Work Request Review Board

FFP

Work Request Review Board Management

PWS 1.1.2.3 to 1.1.2.3.1.2

Option I

1003 12 Months

OPTION Work Order Allocation Program Management

FFP

Work Order Allocation Program Management

PWS 1.1.2.3.2 to 1.1.2.3.3

Option I

1004 12 Months

OPTION Preventive Maintenance Program Manageme

FFP

Preventive Maintenance Program Management

PWS 1.1.3 to 1.1.3.7

1005 12 Months

OPTION Operations Overhead Management

FFP

Operations Overhead Management

PWS 1.1.4 to 1.1.7.3.1

1006 12 Months

OPTION Emergency Corrective & Scheduled Sustain

FFP

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25) COLS 1 - Priority 1 & 3A thru 3C (100%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 2 - Priority 1, 3A and 3B (100%); 3C (50%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price::_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 3 - Priority 1, 3A and 3B (100%); 3C (25%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price::_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 4 - Priority 1, 3A and 3B (100%); 3C (10%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price::_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 5 - Priority 1, 3A (100%); 3B (50%); 3C (10%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 6 - Priority 1, 3A (100%); 3B (25%); 3C (10%)

Unit Price:_____________ Qty: 12 Extended Price::_______________

*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract.

1007 12 Months

OPTION Preventive Maint Base Wide (PM) SRM

FFP

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25) COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - TMDI (50-99) & ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - TMDI (60-99) & ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 4 - TMDI (80-99) & ORM (>0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1 the Term of the Contract.

1008 12 Months

OPTION Preventive Maint DMAG (PM)

FFP

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.5)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work

COLS 4 - ORM (>4.7)

the Term of the Contract.

1009 12 Months

OPTION Preventive Maint NAVY (PM)

FFP

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 4 - ORM (>4.25)

the Term of the Contract.

1010 12 Months

OPTION Preventive Maint DLA (PM)

FFP

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Extended Price:_______________

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, COLS 4 - ORM (>4.7) the Term of the Contract.

1011 12 Months

OPTION Work Order Allocation Project (WOAP) Exe

FFP

Work Order Allocation Project (WOAP) Execution

(Base Wide)

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 1 - 50,000 man-hours (mh)

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Extended Price:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 2 - 45,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Extended Price:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 3 - 40,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 4 - 35,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Extended Price:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 5 - 30,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Extended Price:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 6 - 25,000 mh

1012 12 Months

OPTION Repair & Maintenance for Pavements and F

FFP

Repair & Maintenance for Pavements and Fence

(Base Wide: PM & DSW less WOAPs)

Repair & Maintenance Pavements and Fence

COLS 1 - 100%

PWS 1.2.2 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Extended Price:_______________

Repair & Maintenance Pavements and Fence COLS 2 - DSWs only

PWS 1.2.2 to 1.2.2.2.5 the Term of the Contract.

1013 12 Months

OPTION O&M for Exterior Water Distro & Sanitary

FFP

O&M for Exterior Water Distribution & Sanitary Sewer Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Exterior Water Distribution & Sanitary Sewer Systems

PWS 1.2.2.3 to 1.2.2.3.13

1014 12 Months

OPTION O&M for Exterior Natural Gas Distro

FFP

O&M for Exterior Natural Gas Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Exterior Natural Gas Distribution Systems

PWS 1.2.2.6

1015 12 Months

OPTION O&M for Flood Gates and Exterior Storm

FFP

O&M for Flood Gates and Exterior Storm Water Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Flood Gates & Exterior Storm Water Distribution Systems

PWS 1.2.2.5 to 1.2.2.5.3

1016 12 Months

OPTION O&M for Generators (Power Production)

FFP

O&M for Generators (Power Production) (Base Wide: Operation, PM & DSW less WOAPs)

Generators (Power Production)

PWS 1.2.2.9 to 1.2.2.9.3.3

1017 12 Months

OPTION O&M for Meter and Metering Mgt

FFP

O&M for Meter and Metering Management

(Base Wide: Operation, PM & DSW less WOAPs)

Metering and Metering Management

COLS 1 - 100%

PWS 1.2.2.8 through 1.2.2.8.3

Unit Price:_____________ Qty: 12 Extended Price:_______________

Metering and Metering Management

COLS 2 - Manual Meter Read & DSW

PWS 1.2.2.8 through 1.2.2.8.3 the Term of the Contract.

1018 12 Months

OPTION O&M for Pest Management

FFP

O&M for Pest Management

(Base Wide: Operation, PM & DSW less WOAPs)

Option I

1 July 2016 - 30 June 2017

Pest Management

COLS 1 - 100% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pest Management

COLS 2 - 75% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pest Management

COLS 3 - 50% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pest Management

COLS 4 - DSW Only

PWS 1.2.2.12 to 1.2.2.12.13 the Term of the Contract.

1019 5 Months

OPTION ECP Snow/Ice Removal

FFP

Entry Control Points (ECPs)

Snow & Ice Removal

Option I

1 November 2016 - 31 March 2017

ECPs Snow & Ice Removal

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

ECPs

COLS 2 - Red, Yellow, & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

ECPs

COLS 3 - Red & Yellow (see MAP)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

ECPs

COLS 4 - Red ( see MAP)

PWS 1.2.2.2 to 1.2.2.2.6 the Term of the Contract.

1020 5 Months

OPTION Pavements Base Wide (Streets) Snow/Ice

FFP

Pavements - Base Wide (Streets) Snow & Ice Removal

Option I

1 November 2016 - 31 March 2017

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 2 - Red, Yellow & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 3 - Red & Yellow (see Map

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 4 - Red (see Map) the Term of the Contract.

1021 5 Months

OPTION Pavements Base Wide (Airfield, less DMAG

FFP

Pavements - Base Wide (Airfield, less DMAG))

Snow & Ice Removal

PWS 1.2.2.2 to 1.2.2.2.6

1 November 2016 - 31 March 2017

1022 5 Months

OPTION Pavements - DMAG (Airfield - less Base

FFP

Pavements - DMAG (Airfield - less Base Wide)

Snow & Ice Removal

Labor/Equipment

PWS 1.2.2.2 to 1.2.2.2.6

1 November 2016 - 31 March 2017

1023 12 Months

OPTION Pavements - Base Wide (Streets)

FFP

Pavements - Base Wide (Streets)

Sweeping

Option I

1 July 2016 - 30 June 2017

COLS 1 - 100%

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pavements - Base Wide (Streets)

COLS 2 - Red & Yellow (see Map)

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Extended Price:_______________

Pavements (Streets)

COLS 3 - Red (see Map)

PWS 1.2.2.2.4 to 1.2.2.2.5

1024 12 Months

OPTION Pavements - Base Wide Sweeping

FFP

Pavements - Base Wide (Airfield less DMAG)

PWS 1.2.2.2.4 to 1.2.2.2.5

Option I

1025 12 Months

OPTION Pavements - DMAG Sweeping

FFP

Pavements - DMAG (Airfield less Base Wide)

Sweeping

PWS 1.2.2.2.4 to 1.2.2.2.5

Option I

1026 12 Months

OPTION Predictability Based Maintenance Program

FFP

Predictability Based Maintenance Program (PdM)

(DMAG) PdM Team

PWS 1.2.4 to 1.2.4.3.1.6

Option I

1027 12 Months

OPTION Building Automation System Program (BAS)

FFP

Building Automation System Program (BAS)

PWS 1.2.5

Option I

1028 12 Months

OPTION Retro-Commissioning (RcX) Program

FFP

Retro-Commissioning (RcX) Program

PWS 1.2.5.1 to 1.2.5.1.6

Option I

1029 12 Months

OPTION Appliance Maintenance(UH)

FFP

Unaccompanied Housing (UH)

Appliance Maintenance

PWS 1.2.9.1

Option I

1030 12 Months

OPTION Furnishings Management (UH)

FFP

Unaccompanied Housing (UH)

Furnishings Management

PWS 1.2.9.2

Option I

1031 12 Months

OPTION Change of Occupancy Maintenance (UH)

FFP

Unaccompanied Housing (UH)

Change of Occupancy Maintenance

PWS 1.2.9.3

1032 12 Months

OPTION B3001 - Boiler Plant

FFP

B3001 - Boiler Plant and Steam Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.2 to 1.2.3.2.11

Option I

1033 12 Months

OPTION B3001 & B-9301 - Chillers

FFP

B3001 & B-9301 - Chillers and Chilled Water Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.3.3

Option I

1034 12 Months

OPTION B3001 & B9301 - Compressors

FFP

B3001 & B9301 - Compressors and Compressed Air Loop Distribution System(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.3.4 to 1.2.3.4.1

Option I

1035 12 Months

OPTION B9301 - Boiler Plant and Steam

FFP

B9301 - Boiler Plant and Steam Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.2 to 1.2.3.2.11

Option I

1036 12 Months

OPTION Industrial Wastewater Treatment Plant (I

FFP

Industrial Wastewater Treatment Plant (IWTP) - Plant and Collection System

(Operations, DSWs & PM)

PWS 1.2.2.4 to 1.2.2.5.3 & 1.2.3.5 to 1.2.3.5.8

Option I

1037 12 Months

OPTION Facility Managers Program

FFP

Facility Managers Program

PWS 1.2.7 to 1.2.7.2

Option I

1038 12 Months

OPTION Barcoding Program

FFP

Barcoding Program

PWS 1.2.8

Option I

1039 12 Months

OPTION Denial Barrier Maintenance

FFP

Denial Barrier Maintenance

Maintenance/Work

(Base Wide)

PWS 1.2.2.1.8

Option I

1040 12 Months

OPTION Self-Help Program

FFP

Self-Help Program

PWS 1.5.20

Option I

1041 12 Months

OPTION CE Virtual LAN

FFP

CE Virtual LAN (VLAN)

PWS 1.2.12

Option I

1 July 2016 - 30 June 2017

1042 12 Months

OPTION Maintenance Engineering Support

FFP

Maintenance Engineering Support.

PWS 1.3 to 1.3.4.5

1043 12 Months

OPTION Civil Engineer Material Acquisition Syst

FFP

Civil Engineer Material Acquisition System (CEMAS)

PWS 1.4.1 to 1.4.2.4.2

Option I

1044 12 Months

OPTION CAP Management - FO

FFP

CAP Management - FO

PWS 1.4.2 to 1.4.2.4.2

Option I

1 July 2016 - 30 June 2017

Price for CAP Management shall be evenly proposed between CAP Management - FO and CAP - Management SRM (total price divided by 2).

All costs associated with the purchasing and managing of contractor acquired parts (CAP) shall be priced as a FFP monthly amount in this CLIN. Additional costs for CAP will not be considered and are not allowable under this contract (e.g. material handling rate).

1045 12 Months

OPTION CAP Management - SRM

FFP

CAP Management - SRM

PWS 1.4.2 to 1.4.2.4.2

CAP will not be considered and are not allowable under this contract (e.g. material

1046 Lot

OPTION CAP FO

COST

CAP FO (material cost ONLY)

PWS 1.4.2 to 1.4.2.4.2

Option I

1 July 2016 - 30 June 2017

***DO NOT BID***

ESTIMATED COST

1047 Lot

OPTION CAP SRM

COST

CAP SRM (material cost)

PWS 1.4.2 to 1.4.2.4.2

Option I

1 July 2016 - 30 June 2017

***DO NOT BID***

1048 12 Months

OPTION Required General Services – FO

FFP

Required General Services – FO

PWS 1.5 to 1.5.19

1049 12 Months

OPTION Required General Services - SRM

FFP

Required General Services - SRM

PWS 1.5 to 1.5.19

1050 12 Months

OPTION Required General Services - DMAG

FFP

Required General Services - DMAG

PWS 1.5 to 1.5.19

OPTION Performance during National Crisis

FFP

Performance of Services during National Crisis. PWS 1.2.11 to 1.2.11.2.

Option I

1 July 2016 - 30 June 2017

Unit Price:_________ Qty: 14 U/I: Days Extended Price:___________

This CLIN may be unilaterally awarded at any time during the active period of performance if required per contract clause DFARS 252.237-7023 Continuation of Essential Contractor Services

1052 12 Months

OPTION Quality Performance Indicator

FFP

Quality Performance Indicator (QPI)

Option I

1 July 2016 - 30 June 2017

IAW H-1 Performance Incentive/Quality Performance Indicators, 8% of all FFP CLIN will be allocated to this CLIN prior to award or exercise of options, thereby also decreasing the pricing on all other CLIN by 8%. The contractor may earn a percentage of the performance incentive based on the percentage of QPI earned during the period.

1053 Lump Sum

OPTION Deliverables

FFP

Deliverables--- NOT SEPARATELY PRICED (NSP)

Option I

1 July 2016 - 30 June 2017

See PWS Appendix 4.3 for numbering, description and delivery date for required deliverables.

See Exhibit A

2001 12 Months

OPTION Work Request & Management

FFP

Work Request & Management of Service Calls (DSW)

PWS 1.1.1 to 1.1.2.2.2.3

Option II

1 July 2017 - 30 June 2018

2002 12 Months

OPTION Work Request Review Board

FFP

Work Request Review Board Management

PWS 1.1.2.3 to 1.1.2.3.1.2

Option II

2003 12 Months

OPTION Work Order Allocation Program Management

FFP

Work Order Allocation Program Management

PWS 1.1.2.3.2 to 1.1.2.3.3

Option II

2004 12 Months

OPTION Preventive Maintenance Program Manageme

FFP

Preventive Maintenance Program Management

PWS 1.1.3 to 1.1.3.7

Option II

2005 12 Months

OPTION Operations Overhead Management

FFP

Operations Overhead Management

PWS 1.1.4 to 1.1.7.3.1

2006 12 Months

OPTION Emergency Corrective & Scheduled Sustain

FFP

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

Option II

1 July 2017 - 30 June 2018

COLS 1 - Priority 1 & 3A thru 3C (100%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 2 - Priority 1, 3A and 3B (100%); 3C (50%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 3 - Priority 1, 3A and 3B (100%); 3C (25%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 5 - Priority 1, 3A (100%); 3B (50%); 3C (10%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 6 - Priority 1, 3A (100%); 3B (25%); 3C (10%)

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2007 12 Months

OPTION Preventive Maint Base Wide (PM) SRM

FFP

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

Option II

1 July 2017 - 30 June 2018

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - TMDI (50-99) & ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - TMDI (60-99) & ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2008 12 Months

OPTION Preventive Maint DMAG (PM)

FFP

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

Option II

1 July 2017 - 30 June 2018

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.5)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2009 12 Months

OPTION Preventive Maint NAVY (PM)

FFP

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

Option II

1 July 2017 - 30 June 2018

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

COLS 4 - ORM (>4.25)

2010 12 Months

OPTION Preventive Maint DLA (PM)

FFP

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

Option II

1 July 2017 - 30 June 2018

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2011 12 Months

OPTION Work Order Allocation Project (WOAP) Exe

FFP

Work Order Allocation Project (WOAP) Execution

(Base Wide)

Option II

1 July 2017 - 30 June 2018

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 1 - 50,000 man-hours (mh)

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 2 - 45,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 4 - 35,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 5 - 30,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 6 - 25,000 mh

2012 12 Months

OPTION Repair & Maintenance for Pavements and F

FFP

Repair & Maintenance for Pavements and Fence

(Base Wide: PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Repair & Maintenance Pavements and Fence

COLS 1 - 100%

PWS 1.2.2 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Repair & Maintenance Pavements and Fence COLS 2 - DSWs only

2013 12 Months

OPTION O&M for Exterior Water Distro & Sanitary

FFP

O&M for Exterior Water Distribution & Sanitary Sewer Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Exterior Water Distribution & Sanitary Sewer Systems

PWS 1.2.2.3 to 1.2.2.3.13

2014 12 Months

OPTION O&M for Exterior Natural Gas Distro

FFP

O&M for Exterior Natural Gas Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

2015 12 Months

OPTION O&M for Flood Gates and Exterior Storm

FFP

O&M for Flood Gates and Exterior Storm Water Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Flood Gates & Exterior Storm Water Distribution Systems

PWS 1.2.2.5 to 1.2.2.5.3

2016 12 Months

OPTION O&M for Generators (Power Production)

FFP

O&M for Generators (Power Production) (Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Generators (Power Production)

PWS 1.2.2.9 to 1.2.2.9.3.3

2017 12 Months

OPTION O&M for Meter and Metering Mgt

FFP

O&M for Meter and Metering Management

(Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Metering and Metering Management

COLS 1 - 100%

PWS 1.2.2.8 through 1.2.2.8.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Metering and Metering Management

COLS 2 - Manual Meter Read & DSW

2018 12 Months

OPTION O&M for Pest Management

FFP

O&M for Pest Management

(Base Wide: Operation, PM & DSW less WOAPs)

Option II

1 July 2017 - 30 June 2018

Pest Management

COLS 1 - 100% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pest Management

COLS 2 - 75% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pest Management

COLS 3 - 50% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2019 5 Months

OPTION ECP Snow/Ice Removal

FFP

Entry Control Points (ECPs)

Snow & Ice Removal

Option II

1 November 2017 - 31 March 2018

ECPs Snow & Ice Removal

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

ECPs

COLS 2 - Red, Yellow, & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

ECPs

COLS 3 - Red & Yellow (see MAP)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

2020 5 Months

OPTION Pavements Base Wide (Streets) Snow/Ice

FFP

Pavements - Base Wide (Streets) Snow & Ice Removal

Option II

1 November 2017 - 31 March 2018

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 2 - Red, Yellow & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 3 - Red & Yellow (see Map

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 4 - Red (see Map)

2021 5 Months

OPTION Pavements Base Wide (Airfield, less DMAG

FFP

Pavements - Base Wide (Airfield, less DMAG))

Snow & Ice Removal

PWS 1.2.2.2 to 1.2.2.2.6

Option II

1 November 2017 - 31 March 2018

2022 5 Months

OPTION Pavements - DMAG (Airfield - less Base

FFP

Pavements - DMAG (Airfield - less Base Wide)

Snow & Ice Removal

Labor/Equipment

PWS 1.2.2.2 to 1.2.2.2.6

Option II

1 November 2017 - 31 March 2018

2023 12 Months

OPTION Pavements - Base Wide (Streets)

FFP

Pavements - Base Wide (Streets)

Sweeping

Option II

1 July 2017 - 30 June 2018

COLS 1 - 100%

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets)

COLS 2 - Red & Yellow (see Map)

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements (Streets)

COLS 3 - Red (see Map)

2024 12 Months

OPTION Pavements - Base Wide Sweeping

FFP

Pavements - Base Wide (Airfield less DMAG)

PWS 1.2.2.2.4 to 1.2.2.2.5

Option II

2025 12 Months

OPTION Pavements - DMAG Sweeping

FFP

Pavements - DMAG (Airfield less Base Wide)

Sweeping

PWS 1.2.2.2.4 to 1.2.2.2.5

Option II

2026 12 Months

OPTION Predictability Based Maintenance Program

FFP

Predictability Based Maintenance Program (PdM)

(DMAG) PdM Team

PWS 1.2.4 to 1.2.4.3.1.6

Option II

2027 12 Months

OPTION Building Automation System Program (BAS)

FFP

Building Automation System Program (BAS)

PWS 1.2.5

Option II

2028 12 Months

OPTION Retro-Commissioning (RcX) Program

FFP

Retro-Commissioning (RcX) Program

PWS 1.2.5.1 to 1.2.5.1.6

Option II

2029 12 Months

OPTION Appliance Maintenance(UH)

FFP

Unaccompanied Housing (UH)

Appliance Maintenance

PWS 1.2.9.1

Option II

2030 12 Months

OPTION Furnishings Management (UH)

FFP

Unaccompanied Housing (UH)

Furnishings Management

PWS 1.2.9.2

Option II

2031 12 Months

OPTION Change of Occupancy Maintenance (UH)

FFP

Unaccompanied Housing (UH)

Change of Occupancy Maintenance

PWS 1.2.9.3

2032 12 Months

OPTION B3001 - Boiler Plant

FFP

B3001 - Boiler Plant and Steam Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.2 to 1.2.3.2.11

Option II

2033 12 Months

OPTION B3001 & B-9301 - Chillers

FFP

B3001 & B-9301 - Chillers and Chilled Water Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.3.3

Option II

2034 12 Months

OPTION B3001 & B9301 - Compressors

FFP

B3001 & B9301 - Compressors and Compressed Air Loop Distribution System(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.3.4 to 1.2.3.4.1

Option II

2035 12 Months

OPTION B9301 - Boiler Plant and Steam

FFP

B9301 - Boiler Plant and Steam Distribution System

(Operations, DSWs & PM)

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.2 to 1.2.3.2.11

Option II

2036 12 Months

OPTION Industrial Wastewater Treatment Plant (I

FFP

Industrial Wastewater Treatment Plant (IWTP) - Plant and Collection System

(Operations, DSWs & PM)

PWS 1.2.2.4 to 1.2.2.5.3 & 1.2.3.5 to 1.2.3.5.8

Option II

2037 12 Months

OPTION Facility Managers Program

FFP

Facility Managers Program

PWS 1.2.7 to 1.2.7.2

Option II

2038 12 Months

OPTION Barcoding Program

FFP

Barcoding Program

PWS 1.2.8

Option II

2039 12 Months

OPTION Denial Barrier Maintenance

FFP

Denial Barrier Maintenance

Maintenance/Work

(Base Wide)

PWS 1.2.2.1.8

Option II

2040 12 Months

OPTION Self-Help Program

FFP

Self-Help Program

PWS 1.5.20

Option II

2041 12 Months

OPTION CE Virtual LAN

FFP

CE Virtual LAN (VLAN)

PWS 1.2.12

Option II

2042 12 Months

OPTION Maintenance Engineering Support

FFP

Maintenance Engineering Support.

PWS 1.3 to 1.3.4.5

2043 12 Months

OPTION Civil Engineer Material Acquisition Syst

FFP

Civil Engineer Material Acquisition System (CEMAS)

PWS 1.4.1 to 1.4.2.4.2

Option II

2044 12 Months

OPTION CAP Management - FO

FFP

CAP Management - FO

PWS 1.4.2 to 1.4.2.4.2

CAP will not be considered and are not allowable under this contract (e.g. material

2045 12 Months

OPTION CAP Management - SRM

FFP

CAP Management - SRM

PWS 1.4.2 to 1.4.2.4.2

CAP will not be considered and are not allowable under this contract (e.g. material

2046 Lot

OPTION CAP FO

COST

CAP FO (material cost ONLY)

PWS 1.4.2 to 1.4.2.4.2

2047 Lot

OPTION CAP SRM

COST

CAP SRM (material cost)

PWS 1.4.2 to 1.4.2.4.2

2048 12 Months

OPTION Required General Services – FO

FFP

Required General Services – FO

PWS 1.5 to 1.5.19

2049 12 Months

OPTION Required General Services - SRM

FFP

Required General Services - SRM

PWS 1.5 to 1.5.19

2050 12 Months

OPTION Required General Services - DMAG

FFP

Required General Services - DMAG

PWS 1.5 to 1.5.19

OPTION Performance during National Crisis

FFP

Performance of Services during National Crisis. PWS 1.2.11 to 1.2.11.2.

Option II

1 July 2017 - 30 June 2018

Unit Price:_________ Qty:14 U/I: Days Extended Price:___________

This CLIN may be unilaterally awarded at any time during the active period of performance if required per contract clause DFARS 252.237-7023 Continuation of Essential Contractor Services

2052 12 Months

OPTION Quality Performance Indicator

FFP

Quality Performance Indicator (QPI)

IAW H-1 Performance Incentive/Quality Performance Indicators, 8% of all FFP CLIN will be allocated to this CLIN prior to award or exercise of options, thereby also decreasing the pricing on all other CLIN by 8%. The contractor may earn a percentage of the performance incentive based on the percentage of QPI earned during the period.

2053 Lump Sum

OPTION Deliverables

FFP

Deliverables--- NOT SEPARATELY PRICED (NSP)

Option II

1 July 2017 - 30 June 2018

See PWS Appendix 4.3 for numbering, description and delivery date for required deliverables.

3001 12 Months

OPTION Work Request & Management

FFP

Work Request & Management of Service Calls (DSW)

PWS 1.1.1 to 1.1.2.2.2.3

Option III

1 July 2018 - 30 June 2019

3002 12 Months

OPTION Work Request Review Board

FFP

Work Request Review Board Management

PWS 1.1.2.3 to 1.1.2.3.1.2

Option III

3003 12 Months

OPTION Work Order Allocation Program Management

FFP

Work Order Allocation Program Management

PWS 1.1.2.3.2 to 1.1.2.3.3

Option III

3004 12 Months

OPTION Preventive Maintenance Program Manageme

FFP

Preventive Maintenance Program Management

PWS 1.1.3 to 1.1.3.7

3005 12 Months

OPTION Operations Overhead Management

FFP

Operations Overhead Management

PWS 1.1.4 to 1.1.7.3.1

3006 12 Months

OPTION Emergency Corrective & Scheduled Sustain

FFP

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

Option III

1 July 2018 - 30 June 2019

COLS 1 - Priority 1 & 3A thru 3C (100%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 2 - Priority 1, 3A and 3B (100%); 3C (50%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 3 - Priority 1, 3A and 3B (100%); 3C (25%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 5 - Priority 1, 3A (100%); 3B (50%); 3C (10%)

PWS 1.1.2.2.1 & 1.1.2.2.2 to 1.1.2.2.2.3 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Emergency Corrective & Scheduled Sustainment Work Base Wide (less work covered in CLINS 13-25)

COLS 6 - Priority 1, 3A (100%); 3B (25%); 3C (10%)

3007 12 Months

OPTION Preventive Maint Base Wide (PM) SRM

FFP

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

Option III

1 July 2018 - 30 June 2019

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - TMDI (50-99) & ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure Base Wide SRM (less DMAG, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - TMDI (60-99) & ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

3008 12 Months

OPTION Preventive Maint DMAG (PM)

FFP

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

Option III

1 July 2018 - 30 June 2019

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DMAG (less Base Wide, Navy, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.5)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

3009 12 Months

OPTION Preventive Maint NAVY (PM)

FFP

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

Option III

1 July 2018 - 30 June 2019

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 2 - ORM (>4)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure U.S. Navy (less Base Wide, DMAG, DLA, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

COLS 4 - ORM (>4.25)

3010 12 Months

OPTION Preventive Maint DLA (PM)

FFP

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

Option III

1 July 2018 - 30 June 2019

COLS 1 - 100% of PM Workload

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 2 - ORM (>4.0)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

PM for Facilities/Infrastructure DLA (less Base Wide, DMAG, Navy, & work covered in CLINS 13-25)

COLS 3 - ORM (>4.15)

PWS 1.2 to 1.2.12.13 & 1.2.6 to 1.2.6.1

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

3011 12 Months

OPTION Work Order Allocation Project (WOAP) Exe

FFP

Work Order Allocation Project (WOAP) Execution

(Base Wide)

Option III

1 July 2018 - 30 June 2019

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 1 - 50,000 man-hours (mh)

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 2 - 45,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 4 - 35,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 5 - 30,000 mh

PWS 1.1.2.3 to 1.1.2.3.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Work Order Allocation Project (WOAP) Execution

(Base Wide)

COLS 6 - 25,000 mh

3012 12 Months

OPTION Repair & Maintenance for Pavements and F

FFP

Repair & Maintenance for Pavements and Fence

(Base Wide: PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Repair & Maintenance Pavements and Fence

COLS 1 - 100%

PWS 1.2.2 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Repair & Maintenance Pavements and Fence COLS 2 - DSWs only

3013 12 Months

OPTION O&M for Exterior Water Distro & Sanitary

FFP

O&M for Exterior Water Distribution & Sanitary Sewer Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Exterior Water Distribution & Sanitary Sewer Systems

PWS 1.2.2.3 to 1.2.2.3.13

3014 12 Months

OPTION O&M for Exterior Natural Gas Distro

FFP

O&M for Exterior Natural Gas Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

3015 12 Months

OPTION O&M for Flood Gates and Exterior Storm

FFP

O&M for Flood Gates and Exterior Storm Water Distribution Systems

(Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Flood Gates & Exterior Storm Water Distribution Systems

PWS 1.2.2.5 to 1.2.2.5.3

3016 12 Months

OPTION O&M for Generators (Power Production)

FFP

O&M for Generators (Power Production) (Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Generators (Power Production)

PWS 1.2.2.9 to 1.2.2.9.3.3

3017 12 Months

OPTION O&M for Meter and Metering Mgt

FFP

O&M for Meter and Metering Management

(Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Metering and Metering Management

COLS 1 - 100%

PWS 1.2.2.8 through 1.2.2.8.3

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Metering and Metering Management

COLS 2 - Manual Meter Read & DSW

3018 12 Months

OPTION O&M for Pest Management

FFP

O&M for Pest Management

(Base Wide: Operation, PM & DSW less WOAPs)

Option III

1 July 2018 - 30 June 2019

Pest Management

COLS 1 - 100% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pest Management

COLS 2 - 75% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pest Management

COLS 3 - 50% DSW & PM

PWS 1.2.2.12 to 1.2.2.12.13

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

3019 5 Months

OPTION ECP Snow/Ice Removal

FFP

Entry Control Points (ECPs)

Snow & Ice Removal

Option III

1 November 2018 - 31 March 2019

ECPs Snow & Ice Removal

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

ECPs

COLS 2 - Red, Yellow, & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

ECPs

COLS 3 - Red & Yellow (see MAP)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

3020 5 Months

OPTION Pavements Base Wide (Streets) Snow/Ice

FFP

Pavements - Base Wide (Streets) Snow & Ice Removal

Option III

1 November 2018 - 31 March 2019

COLS 1 - 100% (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 2 - Red, Yellow & Green (see Map)

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 3 - Red & Yellow (see Map

PWS 1.2.2.2 to 1.2.2.2.6

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets) Snow & Ice Removal

COLS 4 - Red (see Map)

3021 5 Months

OPTION Pavements Base Wide (Airfield, less DMAG

FFP

Pavements - Base Wide (Airfield, less DMAG))

Snow & Ice Removal

PWS 1.2.2.2 to 1.2.2.2.6

Option III

1 November 2018 - 31 March 2019

3022 5 Months

OPTION Pavements - DMAG (Airfield - less Base

FFP

Pavements - DMAG (Airfield - less Base Wide)

Snow & Ice Removal

Labor/Equipment

PWS 1.2.2.2 to 1.2.2.2.6

Option III

1 November 2018 - 31 March 2019

3023 12 Months

OPTION Pavements - Base Wide (Streets)

FFP

Pavements - Base Wide (Streets)

Sweeping

Option III

1 July 2018 - 30 June 2019

COLS 1 - 100%

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements - Base Wide (Streets)

COLS 2 - Red & Yellow (see Map)

PWS 1.2.2.2.4 to 1.2.2.2.5

Unit Price:_____________ Qty: 12 Line Item Cost:_______________

Pavements (Streets)

COLS 3 - Red (see Map)

3024 12 Months

OPTION Pavements - Base Wide Sweeping

FFP

Pavements - Base Wide (Airfield less DMAG)

PWS 1.2.2.2.4 to 1.2.2.2.5

Option III

3025 12 Months

OPTION Pavements - DMAG Sweeping

FFP

Pavements - DMAG (Airfield less Base Wide)

Sweeping

Option III

1 July 2018 - 30 June 2019

3026 12 Months

OPTION Predictability Based Maintenance Program

FFP

Predictability Based Maintenance Program (PdM)

(DMAG) PdM Team

Option III

1 July 2018 - 30 June 2019

PWS 1.2.4 to 1.2.4.3.1.6

3027 12 Months

OPTION Building Automation System Program (BAS)

FFP

Building Automation System Program (BAS)

Option III

1 July 2018 - 30 June 2019

PWS 1.2.5

3028 12 Months

OPTION Retro-Commissioning (RcX) Program

FFP

Retro-Commissioning (RcX) Program

Option III

1 July 2018 - 30 June 2019

PWS 1.2.5.1 to 1.2.5.1.6

3029 12 Months

OPTION Appliance Maintenance(UH)

FFP

Unaccompanied Housing (UH)

Appliance Maintenance

Option III

1 July 2018 - 30 June 2019

PWS 1.2.9.1

3030 12 Months

OPTION Furnishings Management (UH)

FFP

Unaccompanied Housing (UH)

Furnishings Management

Option III

1 July 2018 - 30 June 2019

PWS 1.2.9.2

3031 12 Months

OPTION Change of Occupancy Maintenance (UH)

FFP

Unaccompanied Housing (UH)

Change of Occupancy Maintenance

Option III

PWS 1.2.9.3

3032 12 Months

OPTION B3001 - Boiler Plant

FFP

B3001 - Boiler Plant and Steam Distribution System

(Operations, DSWs & PM)

Option III

1 July 2018 - 30 June 2019

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.2 to 1.2.3.2.11

3033 12 Months

OPTION B3001 & B-9301 - Chillers

FFP

B3001 & B-9301 - Chillers and Chilled Water Distribution System

(Operations, DSWs & PM)

Option III

1 July 2018 - 30 June 2019

PWS 1.2.3.1 to 1.2.3.1.1 & 1.2.3.3

ITEM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .