Text version
m
F3Y0AA3003A006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make administrative changes to Section M and Appendix 4.9 Minimum Team Complement, see summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8101-15-R-0007
X 9B. DATED (SEE ITEM 11)
08-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2015
CODE
AFSC/PZIOA
KIMBERLY DELONG/405-739-3744
7858 5TH ST STE 1
TINKER AFB OK 73145-9125
FA8101 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8101-15-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
soSUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT NOTES
The following administrative changes have been made:
FIRST: The following Section M paragraphs have administrative changes (see underlined verbiage):
FROM:
1.3 Correction Potential of Proposals
The Government will consider the correction potential of any proposal aspect evaluated as unacceptable. The judgment of such correction potential is within the sole discretion of the Government. If an aspect of an offeror's proposal is not considered correctable, or if the amount and/or complexity of the corrections needed to meet the Government requirement is impractical, the offeror may be eliminated from the competitive range.
TO:
1.3 Correction Potential of Proposals
The Government will consider the correction potential of any proposal aspect evaluated as unacceptable. The judgment of such correction potential is within the sole discretion of the Government. If an aspect of an offeror's proposal is not considered correctable, or if the amount and/or complexity of the corrections needed to meet the Government requirement requires a major proposal revision, the offeror may be eliminated from the competitive range.
FROM:
1.8 Solicitation Requirements (Terms and Conditions)
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. In the case that a discrepancy exists between Section L- Instructions to Offerors (ITO) and Section M-Evaluation Factors for Award, the evaluation criteria in Section M-Evaluation Factors for Award will take precedence.
TO:
1.8 Solicitation Requirements (Terms and Conditions)
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award. In the case that a discrepancy exists between Section L- Instructions to Offerors (ITO) and Section M-Evaluation Factors for Award, the evaluation criteria in Section M-Evaluation Factors for Award will take precedence.
FROM:
4.1 Ratings
The past performance factor will receive one of the following performance confidence assessments described in the Department of Defense (DoD) Source Selection Procedures, paragraph 3.1.3.3, Table 5 – Performance Confidence Assessments (with waiver excluding Substantial Confidence):
TABLE
TO:
4.1 Ratings
The past performance factor will receive one of the following performance confidence assessments described in the Department of Defense (DoD) Source Selection Procedures, paragraph 3.1.3.3, Table 5 – Performance Confidence Assessments (with waiver excluding Substantial Confidence):
TABLE (UNCHANGED)
Note: With regards to the best value award decision, all offerors rated as “Satisfactory Confidence” will be considered equal for the past performance factor.
SECOND: The Minimum Team Complement is revised to correct inadvertent mathematical errors to the total number of FTEs.
THIRD: Attachment List is revised: PWS Appendix 4.9 Minimum Team Complement Rev C. is hereby rescinded and replaced with PWS Appendix 4.9 Minimum Team Complement Rev D. Section M is hereby rescinded and replaced with Section M Rev A.
--------------System Generated Below--------------------
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
Attachments:
Performance Work Statement 30 Jul 15 92 pages PWS Appendices:
4.1 Acronyms, Abbreviations And Definitions
4.2 Applicable Publications
4.3 Deliverables
4.4 Environmental Requirements
4.5 Maps And Facility Drawings
4.6 Workload Data
4.7 Government-Furnished Items
4.8 Standard Operation Procedures
4.9 Minimum Team Complement Rev D 20 Aug 15 16 pages
Building (OK49) 12 Jun 15 7 pages Heavy (OK26) 12 Jun 15 5 pages Highway (OK15) WDs 2 Jan 15 4 pages Service Contract Act WD 05-2431 22 Dec 14 10 pages Tinker IAM CBA 2013-2016 26 Aug 13 58 pages Teamsters CBA 1 Sep 13 43 pages Tinker Mission Dependability Index (TMDI) Operational Risk Matrix (ORM)
DD254
Pricing Matrix Rev B Section L CE Ops Rev A 36 pages Section M CE Ops Rev A 19 Aug 15 13 pages
(End of Summary of Changes) w
| PWS Appendices: |
| 4.1 Acronyms, Abbreviations And Definitions |
| 4.2 Applicable Publications |
| 4.3 Deliverables |
| 4.4 Environmental Requirements |
| 4.5 Maps And Facility Drawings |
| 4.6 Workload Data |