FA8101-15-R-0007-0005.pdf

PDF 28 KB Posted

Attached to
Tinker AFB CE Services-Operations Mgmt Federal contract opportunity
Solicitation number
FA8101-15-R-0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB CE Services-Operations Mgmt, newest first.
File Type Posted
Pricing_Matrix_Final_Rev_C_Supplemental.xlsx XLSX spreadsheet
4.9_Minimum_Team_Complement_Rev_D_8-20.pdf PDF
Section_M_CE_Ops_Rev_A_8-20.pdf PDF
Remaining_Question_13_Aug_15.pdf PDF
4.9_Minimum_Team_Complement_Rev_C.pdf PDF
FA8101-15-R-0007-0004.pdf PDF
Section_L_CE_Ops_Rev_A.pdf PDF
4.9_Minimum_Team_Complement_Rev_B.pdf PDF
Pricing_Matrix_Final_Rev_B.xlsx XLSX spreadsheet
FA8101-15-R-0007-0003.pdf PDF
Q A_6.pdf PDF
Final_Operations_PWS_30_July_15.pdf PDF
Pricing_Matrix_Final_Rev_A.xlsx XLSX spreadsheet
Revised_Appendices.zip ZIP file
New_Appendices.zip ZIP file
FA8101-15-R-0007-0002.pdf PDF
ppi_tool.accdb —
4.3_Deliverable_List.xlsx XLSX spreadsheet
Q A__4.pdf PDF
Q A__5.pdf PDF
Teamsters_CBA_2013-2016.pdf PDF
DB_WD_Highway_OK15.pdf PDF
Section_L_CE_Ops.pdf PDF
WD_2005-2431_Rev_19.pdf PDF
4.6_Workload_Data.zip ZIP file
DB_WD_Heavy_OK26.pdf PDF
4.4_Environmental_Requirements.zip ZIP file
FA8101-15-R-0007.pdf PDF
4.9_Minimum_Team_Complement.pdf PDF
Tinker_IAM_CBA_2013-2016.pdf PDF
Section_M_CE_Ops.pdf PDF
4.2_Applicable_Pubs.zip ZIP file
4.8_SOP.zip ZIP file
4.3_Deliverable_List.zip ZIP file
4.7_GFP.zip ZIP file
DB_WD_Building_OK49.pdf PDF
DD254_Redacted.pdf PDF
Final_Operations_PWS.pdf PDF
4.5_Maps_and_Facility_Drawings.zip ZIP file
4.1_Acronyms _Abbreviations_and_Definitions.zip ZIP file
Pricing_Matrix_Final.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

m

F3Y0AA3003A006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make administrative changes to Section M and Appendix 4.9 Minimum Team Complement, see summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8101-15-R-0007

X 9B. DATED (SEE ITEM 11)

08-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2015

CODE

AFSC/PZIOA

KIMBERLY DELONG/405-739-3744

7858 5TH ST STE 1

TINKER AFB OK 73145-9125

FA8101 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8101-15-R-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

soSUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT NOTES

The following administrative changes have been made:

FIRST: The following Section M paragraphs have administrative changes (see underlined verbiage):

FROM:

1.3 Correction Potential of Proposals

The Government will consider the correction potential of any proposal aspect evaluated as unacceptable. The judgment of such correction potential is within the sole discretion of the Government. If an aspect of an offeror's proposal is not considered correctable, or if the amount and/or complexity of the corrections needed to meet the Government requirement is impractical, the offeror may be eliminated from the competitive range.

TO:

1.3 Correction Potential of Proposals

The Government will consider the correction potential of any proposal aspect evaluated as unacceptable. The judgment of such correction potential is within the sole discretion of the Government. If an aspect of an offeror's proposal is not considered correctable, or if the amount and/or complexity of the corrections needed to meet the Government requirement requires a major proposal revision, the offeror may be eliminated from the competitive range.

FROM:

1.8 Solicitation Requirements (Terms and Conditions)

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. In the case that a discrepancy exists between Section L- Instructions to Offerors (ITO) and Section M-Evaluation Factors for Award, the evaluation criteria in Section M-Evaluation Factors for Award will take precedence.

TO:

1.8 Solicitation Requirements (Terms and Conditions)

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award. In the case that a discrepancy exists between Section L- Instructions to Offerors (ITO) and Section M-Evaluation Factors for Award, the evaluation criteria in Section M-Evaluation Factors for Award will take precedence.

FROM:

4.1 Ratings

The past performance factor will receive one of the following performance confidence assessments described in the Department of Defense (DoD) Source Selection Procedures, paragraph 3.1.3.3, Table 5 – Performance Confidence Assessments (with waiver excluding Substantial Confidence):

TABLE

TO:

4.1 Ratings

The past performance factor will receive one of the following performance confidence assessments described in the Department of Defense (DoD) Source Selection Procedures, paragraph 3.1.3.3, Table 5 – Performance Confidence Assessments (with waiver excluding Substantial Confidence):

TABLE (UNCHANGED)

Note: With regards to the best value award decision, all offerors rated as “Satisfactory Confidence” will be considered equal for the past performance factor.

SECOND: The Minimum Team Complement is revised to correct inadvertent mathematical errors to the total number of FTEs.

THIRD: Attachment List is revised: PWS Appendix 4.9 Minimum Team Complement Rev C. is hereby rescinded and replaced with PWS Appendix 4.9 Minimum Team Complement Rev D. Section M is hereby rescinded and replaced with Section M Rev A.

--------------System Generated Below--------------------

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachments:

Performance Work Statement 30 Jul 15 92 pages PWS Appendices:

4.1 Acronyms, Abbreviations And Definitions

4.2 Applicable Publications

4.3 Deliverables

4.4 Environmental Requirements

4.5 Maps And Facility Drawings

4.6 Workload Data

4.7 Government-Furnished Items

4.8 Standard Operation Procedures

4.9 Minimum Team Complement Rev D 20 Aug 15 16 pages

Building (OK49) 12 Jun 15 7 pages Heavy (OK26) 12 Jun 15 5 pages Highway (OK15) WDs 2 Jan 15 4 pages Service Contract Act WD 05-2431 22 Dec 14 10 pages Tinker IAM CBA 2013-2016 26 Aug 13 58 pages Teamsters CBA 1 Sep 13 43 pages Tinker Mission Dependability Index (TMDI) Operational Risk Matrix (ORM)

DD254

Pricing Matrix Rev B Section L CE Ops Rev A 36 pages Section M CE Ops Rev A 19 Aug 15 13 pages

(End of Summary of Changes) w

PWS Appendices:
4.1 Acronyms, Abbreviations And Definitions
4.2 Applicable Publications
4.3 Deliverables
4.4 Environmental Requirements
4.5 Maps And Facility Drawings
4.6 Workload Data