4.3_Deliverable_List.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Tinker AFB CE Services-Operations Mgmt Federal contract opportunity
Solicitation number
FA8101-15-R-0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

4.3 Deliverable List (Not Password Protected)

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB CE Services-Operations Mgmt, newest first.
File Type Posted
Pricing_Matrix_Final_Rev_C_Supplemental.xlsx XLSX spreadsheet
4.9_Minimum_Team_Complement_Rev_D_8-20.pdf PDF
Section_M_CE_Ops_Rev_A_8-20.pdf PDF
FA8101-15-R-0007-0005.pdf PDF
Remaining_Question_13_Aug_15.pdf PDF
4.9_Minimum_Team_Complement_Rev_C.pdf PDF
FA8101-15-R-0007-0004.pdf PDF
Section_L_CE_Ops_Rev_A.pdf PDF
FA8101-15-R-0007-0003.pdf PDF
4.9_Minimum_Team_Complement_Rev_B.pdf PDF
Pricing_Matrix_Final_Rev_B.xlsx XLSX spreadsheet
Q A_6.pdf PDF
Final_Operations_PWS_30_July_15.pdf PDF
Pricing_Matrix_Final_Rev_A.xlsx XLSX spreadsheet
Revised_Appendices.zip ZIP file
FA8101-15-R-0007-0002.pdf PDF
New_Appendices.zip ZIP file
ppi_tool.accdb —
Q A__5.pdf PDF
Q A__4.pdf PDF
Teamsters_CBA_2013-2016.pdf PDF
DB_WD_Highway_OK15.pdf PDF
Section_L_CE_Ops.pdf PDF
WD_2005-2431_Rev_19.pdf PDF
4.6_Workload_Data.zip ZIP file
DB_WD_Heavy_OK26.pdf PDF
4.4_Environmental_Requirements.zip ZIP file
FA8101-15-R-0007.pdf PDF
4.9_Minimum_Team_Complement.pdf PDF
4.3_Deliverable_List.zip ZIP file
4.7_GFP.zip ZIP file
DB_WD_Building_OK49.pdf PDF
DD254_Redacted.pdf PDF
Final_Operations_PWS.pdf PDF
4.5_Maps_and_Facility_Drawings.zip ZIP file
4.1_Acronyms _Abbreviations_and_Definitions.zip ZIP file
Pricing_Matrix_Final.xlsx XLSX spreadsheet
Tinker_IAM_CBA_2013-2016.pdf PDF
Section_M_CE_Ops.pdf PDF
4.2_Applicable_Pubs.zip ZIP file
4.8_SOP.zip ZIP file
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reports & Deliverables Appendix 4.3 Deliverables for CE Services-Operations Management

This appendix provides details regarding the deliverables required under this contract. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission. All annual requirements are due prior to the end of each contract period ie. the last option period is 10 months, so an annual report is due at the end of the 10 month period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.
Complete?Document NumberFunctional AreaTitleMinimum Required Information (reference PWS & additional references for additional requirements)FrequencyDate of First SubmissionDate of Subsequent SubmissionsActual DateAddresseeCopiesPWS ReferencesAdditional References
A01Grounding, Lightning protection & Corrosion Control SystemsAnnual Cathodic Protection Report1) Executive Summary: synopsis of all systems

2) Report organized by system ie. rectifiers, isolation flanges/unions, ASTs, USTs, close interval survey, test point survey, water tanks, fire protection water lines, leak reports and fuels systems and each section includes:

3) Summary Sheets: Include at least testing procedures, findings, and adjustments performed, any recommendations, etc.

4) Completed Forms: AF Form 1687 - Annotated Leak information, AF Form 1689 - Water Tank Calibration, AF Form 491 - Cathodic Protection Operating Log for Impressed Current Systems, AF Form 1686 - Cathodic Protection Operating Log for Sacrificial Anode System, and AF Form 1688 - Annual Cathodic Protection Performance Survey

Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEY, 72 ABW/CENElectronic Copy to 72 ABW/CEY, Electronic and Hard Copy to 72 ABW/CENPara 1.2.1.7 → 1.2.1.7.4 & 1.2.2.3.6AFI 32-1054, AFI 32-1065, AFI 32-1067, AF Forms 491, 1457, 1459, 1686, 1687, 1688, 1689 , UFC 3-240-13FN, 3-570-02N, 3-570-02A, 3-570-06, and NFPA 780
B01Infrastructure Maintenance Fire Suppression SystemsFire Pump Runtime/Fuel Usage Form1) Total annual hours of operation (from J6Fire Pumps Runtime Forms located at each fire house).
2) Annual fuel usage for each fire pumpAnnuallyFirst January 15thSubsequent January 15ths72ABW/CEIHard CopyPara 1.2.1.6 → 1.2.1.6.2UFC 3-601-02, Maintenance of AFFF Fire fighting systems.
C01Quality ControlQuality Control PlanSee PWS for detailed requirements.Annually15 calendar days before start of first contract period.21 calendar days before end of each contract period72ABW/CEY, AFSC/PZIOCElectronic Copy to 72 ABW/CEY, Hard and Electronic Copies to AFSC/PZIOCPara 1.1.6 → 1.1.6.1.6FAR 52.246-4, FAR 52.246-2
C02Quality ControlInspection ScheduleMinimum information required: name of the QC Inspector, phone number, items to be checked (UID), PMTL #, PWS paragraph reference, bldg number, location and the approximate time of the performance including the DSW#, WO#, PM# and related information.WeeklyMonday of first week of full contract performanceMonday of each week72 ABW/CEY, AFSC/PZIOCElectronic CopyPara 1.1.6 → 1.1.6.4FAR 52.246-4, FAR 52.246-2
C03Quality ControlQPI Supporting Documents and InformationInclude required supporting documents along with the detailed
calculation for each QPI (Quality Performance Indicator)Monthly5th of the second month of full contract performance5th of each month72 ABW/CEYElectronic CopySection 2, para 2.1FAR 52.246-4, FAR 52.246-2
C04Quality ControlStandard Operating Procedures and Maintenance Control PlanSee PWS for detailed requirements.As required60 days after start of full contract performanceAs needed when requested by government (New and updated plans)72 ABW/CEYElectronic CopyPara 1.1.6.2 → 1.1.6.3
D01Unaccompanied Housing Appliance, Change of Occupancy Maintenance, Furnishings ManagementMaster Inventory Log-Warehoused Furniture/Appliance ItemsMinimum information requirements: nomenclature, manufacturer, model #, serial #, number of backup items.Monthly5th calander day of the 2nd month of full contract performanceNLT 5th calander day of each month72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.9 → 1.2.9.3AFI 32-6004
D02Unaccompanied Housing Appliance, Change of Occupancy Maintenance, Furnishings ManagementFurniture/Appliance Repair LogFurniture/appliance repair log using eMH or other approved methods. Minimum information required: date, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to DRMO (need to provide receipt of items received from DRMO with manufacture make, model #, and serial #), time spent on task, description of repair.Monthly5th calander day of the 2nd month of full contract performanceNLT 5th calander day of each month72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.9 → 1.2.9.3AFI 32-6004
D03Unaccompanied Housing Appliance, Change of Occupancy Maintenance, Furnishings ManagementFurniture Control LogFurniture control log using eMH or other approved methods. Minimum information required: date,quantity, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to DRMO (need to provide receipt of items received from DRMO with manufacture make, model #, and serial #).Monthly5th calander day of the 2nd month of full contract performanceNLT 5th calander day of each month72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.9 → 1.2.9.3AFI 32-6004
G01Pest ManagementIPMIS Monthly ReportSee PWS para 1.2.2.12.8.2 and AFI 32-1053 for requirement.Monthly60 days after start of full contract performance5th of each monthPM, COR, MAJCOM PMCElectronic Copy
G02Pest ManagementInstallation Pest Management Plan UpdateSee AFI 32-1053 and DoD Directive 4150.07 for detailed requirements. Submit for natural resources compliance review/signature during annual plan review. 72 ABW approval required every 5 years.AnnuallyAug 1stAug 1stFAS, COR, COElectronic Copy to 72 ABW/CEY, Hard & Electronic Copies to AFSC/PZIOCPara 1.2.2.12 → 1.2.2.12.10AFI 32-1053 and DOD Directive 4150-07I, Enclosure 5
G03Pest ManagementPesticide Use Reduction ReportSee DOD Directive 4150-07I for requirement.Monthly5th of the second month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.12 → 1.2.2.12.10
G04Pest ManagementPesticide Usage DataUpon annual submission of pesticide measures of merit, submit base-wide pesticide usage data for natural resources review prior to submission to requesting organization.AnnuallyAug 1stAug 1st72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.12 → 1.2.2.12.10AFI 32-1053, DOD Directive 4150-07, DD Form 1532, DD Form 1532-1, DD Form 1826, DD Form 1826-1
G05Pest ManagementTrapped or Removed Nuisance Animal Control ReportMinimum information required: type of animal, count and date trapped or removed.AnnuallyJan 5thJan 5th72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.12 → 1.2.2.12.10
H01Continuous Emissions Monitoring System (CEMS)Relative Accuracy Test Audit (RATA)RATA audits and reports for boilers 1, 2 and 3 in building 3001 IAW 40 CFR 60 appendix F.Annuallyw/in 5 calendar days of test72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.3.2.6 → 1.2.3.2.7AFI 32-1068, UFC 3-430-07, UFC 3-430-02FA, UFC 3-430-08N
H02Continuous Emissions Monitoring System (CEMS)CEMS AuditCEMS audits and reports for boilers 1, 2 and 3 in building 3001 IAW 40 CFR 60 appendix F.Annuallyw/in 5 calendar days of test72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.3.2.6 → 1.2.3.2.7AFI 32-1068, UFC 3-430-07, UFC 3-430-02FA, UFC 3-430-08N
H03Continuous Emissions Monitoring System (CEMS)Cylinder Gas Audits (CGA)CGA for boilers 1, 2 and 3 in building 3001 IAW 40 CFR 60 appendix F.Quarterlywithin 90 calendar days of full contract performancew/in 5 calendar days of test72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.3.2.6 → 1.2.3.2.7AFI 32-1068, UFC 3-430-07, UFC 3-430-02FA, UFC 3-430-08N
I01Electric Power SystemsGenerator Run Time Form and Fuel Usage ReportInclude hours of operation--Include all information in the "Yearly Generator Run Times" attachmentAnnually15th of January72 ABW/CEY, 72 ABW/CEIElectronic CopyPara 1.2.2.9 → 1.2.2.9.3.5AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5-6 Generators, NFPA 70B & 70C & Current ETL 11-21
I02Electric Power SystemsGenerator Inventory ReportInclude all information in the "Generator Report" attachmentAnnually15th of January15th of January and as number changes72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.9 → 1.2.2.9.3.5AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5-6 Generators, NFPA 70B & 70C & Current ETL 11-21
J01Natural Gas SystemAnnual Natural Gas Leak ReportSee AFI 32-1069 para 5.4. Minimum information required: description of location (include map) and classification of the leak.Annually1st of September1st of September72 ABW/CEY, 72 ABW/CENElectronic Copy to 72 ABW/CEY, Electronic and Hard Copy to 72 ABW/CENPara 1.2.2.6 & 1.2.4.3.1.1AFI 32-1069, TM 5-654, & UFC 3-430-09
J02Natural Gas SystemNatural Gas PlanSee PWS for detailed requirements.Annually3 months after start of full performance21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.6 & 1.2.4.3.1.1DOT-PHMSA
L01Utility MetersUtility Meter Calibration ScheduleInclude all utilities (Gas Flow Meter, Water Flow Meter, Industrial and Sanitary Flow Meters, Electric Meters, and CNG Fill Stations)Annually45 calendar days after full contract performance21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.8.3NIST Standard
L02Utility MetersUtility Meter Calibration ReportMinimum information required: meter number, type of utility, meter location, calibration performed, date, etc.Annually21 calendar days before the end of the first contract period21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.8.3NIST Standard
L03Utility MetersMonthly Meter Reading ReportUse format provided in attachmentMonthly2nd month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara. 1.2.2.8 → 1.2.2.8.2
M01Visual Air Navigation SystemsVisual Air Navigation Systems Inspection ReportSee requirements in the Chapter 5 AC 150-5340-26C & UFC 3-535-01Monthly5th of the first month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.11FAA Advisory Circular (AC) 150-5340-26C, 150-5340-30G, 150-5340-21, NESC, NEC, TAFB

Standards, AFI 13--204, V2 & V3, UFC 3-535-01 N01 Refrigerant Management Refrigerant Management Standard Operating Procedures See requirements in the PWS Annually 60 days after start of full contract performance 21 calendar days before the end of every contract period 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N02 Refrigerant Management List of initial refrigerant recovery and recycling equipment See requirements in the PWS Annually 60 days after start of full contract performance 21 calendar days before the end of every contract period 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N03 Refrigerant Management Training and certifications records See requirements in the PWS Annually NLT 14 days of full contract performance 14 calendar days before the start of every contract period 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089

N04Refrigerant ManagementData for refrigerant consumption - Tinker Refrigerant Management
Data Sheets, Leak Report, and CMAS Inventory dataSee requirements in the PWSMonthly2nd month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CENPara 1.3.4 →1.3.4.13AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC

MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N05 Refrigerant Management Refrigerant Equipment Service Records & Maintenance and Repair Records Include records for equipment service records and maintenance and repair requirements Quarterly w/in 90 calendar days of full contract performance 5th of the month after the quarter 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N06 Refrigerant Management Annual Excessive Leakage Rate Report See requirements in the PWS Quarterly w/in 90 calendar days of full contract performance 5th of the month after the quarter 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N07 Refrigerant Management Equipment Inventory Report See requirements in the PWS Quarterly w/in 90 calendar days of full contract performance 5th of the month after the quarter 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089 N08 Refrigerant Management Refrigerant Inventory Level Report Minimum information required: refrigerant inventory levels and consumption for each type of refrigerant Monthly 2nd months of full contract performance 5th of each month 72 ABW/CEY, 72 ABW/CEN Electronic Copy to 72 ABW/CEY, Hard Copy to 72 ABW/CEN Para 1.3.4 →1.3.4.13 AFPAM 32-1004 V2 and V5, AFI 32-7086, DD 2875, Refrigerant Mgmt Handbook, TAFB HVAC MGMT PLAN (SAMPLE), Leak Rpt & CEMAS Inventory Template, Tinker Refrigerant Mgmt Data Sheet, TAFB Form 487, ODC Inventory Sample. AFPAM 32-7089

P01Preventive Maintenance Program (PMP)PMP PlanSee CE Playbook for detailed requirementsAnnually2 months after start of full contract performance21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 → 1.1.3.8AFPAM 32-1004 V2 & V5
P02Preventive Maintenance Program (PMP)PMP Quarterly ReportMinimum information required:

1) changes in the PM hours, frequencies, schedules, equipment additions and deletions implemented by respective equipment PMTLs for any additional (increase or decrease) equipment for the PM performance

2) listing of equipment for each shop, which is not currently on PM that may be used as PM replacement opportunities for equipment that cannot be serviced

3) equipment standard changes and PMTL changes

4) redundant work required in the PMP which overlaps the Predictive Maintenance Program (if applicable)Quarterlyw/in 90 calendar days of full contract performanceNLT 5th calendar day of next month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 → 1.1.3.8AFPAM 32-1004 V2 & V5
P03Preventive Maintenance Program (PMP)Deferred PM ListSee PWS for detailed requirements.Monthly2nd month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 → 1.1.3.8AFPAM 32-1004 V2 & V5
P04PMTLPreventive Maintenance Task ListMinimum information required: PM, PMTL#, UID, UID Description, UID Location, Building number, Work Location, Shop POC, detail reason for the deferring any PM and /or not performing any tasks listed in the PMTL, Facility Manager contacted during the initial attempt..Monthly2nd month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 → 1.1.3.8AFPAM 32-1004 V2 & V5
Q01Water Supply, Storage, and Distribution SystemDead-End Flushing RecordsSee attachment in the appendix 4.6.1.23, P-Water Supply, Storage, and DistributionEvery 90 days5th day of the 4th month of full contract performance5th day of every 4th month for the previous 90 day flushing record72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.3 & 1.2.2.3.5OAC252:631, UFC 3-230-02, UFC 3-601.02, NFPA 24, NFPA 25, &

AWWA, MANUAL 17

Q02 Water Supply, Storage, and Distribution System Unidirectional Flushing/Flow Plan Minimum required information: Detailed Uniform Flushing Plan/Drawing by section of the hydrants, Loops, Flow/Velocity Readings, Hydrant Number, schedule to be performed, and process how to be performed (Must distribute workload monthly so that entire base fire hydrant flushing gets executed in a one Option Year) Annually 30 calendar days after start of full contract performance 21 calendar days before the end of every contract period 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.2.3 & 1.2.2.3.5 OAC252:631, UFC 3-230-02, UFC 3-601.02, NFPA 24, NFPA 25, &

AWWA, MANUAL 17

Q03 Water Supply, Storage, and Distribution System Hydrant Flow Test Records See Attachment in the appendix 4.6.1.23, P-Water Supply, Storage, and Distribution Monthly 5th day of the 4th month of full contract performance 5th of each month 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.2.3 & 1.2.2.3.5 OAC252:631, UFC 3-230-02, UFC 3-601.02, NFPA 24, NFPA 25, &

AWWA, MANUAL 17

Q04 Water Supply, Storage, and Distribution System Flow Execution Schedule Minimum required information: Section of the flushing (location), Date & Time of the execution, (This include Unidirectional Flow Test, Annual Hydrant Flow Test, & Dead-end Flushing) Every Other week 30 calendar days after start of full contract performance 1st working day of every alternate week 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.2.3 & 1.2.2.3.5 OAC252:631, UFC 3-230-02, UFC 3-601.02, NFPA 24, NFPA 25, &

AWWA, MANUAL 17

Q05 Water Supply, Storage, and Distribution System Chlorine & Water Well Level Report (A) Static level and pumping level of each well must be determined monthly; (B) Alkalinity, pH, and stability must be determined at least monthly for community systems and at least quarterly for non-transient non-community water systems; (C) Where chlorination is practiced, determine the chlorine residual twice daily in the distribution system and once daily at the POE; (D) Perform the following chemical control tests on the treated water once a day: (i) Alkalinity – Phenolphthalein (P), (ii) Alkalinity – Total, (iii) Hardness, (iv) pH value, and (v) Stability to calcium carbonate. (E) fluoride content (twice a day for fluoride content, both before and after fluoridation); See Attachment 4.6.1.16 P-Water Supply, Storage, and Distribution System Monthly 5th of the first month of full contract performance 5th of each month 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.2.3 ----> 1.2.2.3.13 OKLAHOMA ADMINISTRATIVE CODE (OAC) #252: CHAP 631 & SAFE DRINKING WATER ACT , 19-2 Emergency Spill Response Plan, UFC_3_230_02, UFC_3_601_02, AFI 48-114: SWIMMING POOLS, SPAS AND HOT TUBS, AND NATURAL BATHING AREAS and AFI 32-1067 Q06 Water Supply, Storage, and Distribution System Fluoride Report See attachment and PWS for the requirements See Attachment 4.6.1.16 P-Water Supply, Storage, and Distribution System Monthly 5th of the first month of full contract performance 5th of each month 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.2.3 ----> 1.2.2.3.13 OKLAHOMA ADMINISTRATIVE CODE (OAC) #252: CHAP 631 & SAFE DRINKING WATER ACT , 19-2 Emergency Spill Response Plan, UFC_3_230_02, UFC_3_601_02, AFI 48-114: SWIMMING POOLS, SPAS AND HOT TUBS, AND NATURAL BATHING AREAS and AFI 32-1067

Q07Water Supply, Storage, and Distribution SystemBase Swimming Pool Chlorine & PH Testing/Inspection Log/ReportSee attachment 4.6.1.29 and PWS for the requirements See Attachment P-Water Supply, Storage, and Distribution System. Daily Chlorine and PH Testing at the Base Swimming Pool (Gerrity & Izzard Swimming Pool) Tested every 2 hours daily including weekend and holidays (*during the swimming pool open season only Usually from March to November)Monthly5th of the first month of full performance (OY1)5th of each month72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.2.3.1ADMINISTRATIVE CODE (OAC) #252: CHAP 631, OAC 310:320: Public Bathing Places, & AFI 48-114:SWIMMING POOLS, SPAS AND HOT TUBS, AND NATURAL BATHING AREAS
Q08Water Supply, Storage, and Distribution SystemWater Treatment PlanInclude all boiler systems, all chilled water systems, and all cooling tower systems. Refer PWS for the requirements. Plan must cover the detail process of the water treatment process and execution method.Annuallyw/in 30 calendar days of full contract performance21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3.8, 1.1.3.9, 1.1.3.10, 1.2.1.5.1, 1.2.1.7,
1.2.1.7.4, 1.2.2.3.11, 1.2.2.4.10, 1.2.3, 1.2.3.5, & 1.2.3.1.1AFPAM32-1004V2, AFPAM32-1004V5UFC-3-240-13FN
R01Steam ProductionCalibration and/or Tune-Up RecordsSee AFI 32-1068 and PWS for the requirementsAnnually21 calendar days before the end of full performance (OY1)21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.3.2.10 & 1.2.3.2.11
S01Ventilation Hood and Duct SystemsInspection and Cleaning ReportContractor must combine all the requirements from the provided Sample Venthood in the Appendix 4.6.1.30, R-Ventilation Hood and Duct Systems to create a master checklist.Monthly5th of the first month of full contract performance5th of each month72 ABW/CEY, 72 ABW/CEN, 72ABW/CEFElectronic CopyPara 1.2.1.5.2.1AFI 91-203, NFPA 96-11, & Appendix 2-4-6-Kitchen Vent Hoods
T01Energy Saving Performance Contract Equipments (Building Autamation Systems (BAS))Repair RecordsInclude all completed PMTL Database records and applicable DSW repair records for ESPC Delivery Order #1 equipment identified in Appendix 4.3.2. to a Honeywell provided file server
semi-annually.Semi-Annually21 Calendar days before the 6th month of full contract performance21 Calendar days before the 6th month of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.5ETL 13-13 Energy Savings Performance Contracts ( ESPC)
U01MotorManagement ProgramMotor Management Program PlanSubmit the Motor Current Signature Analysis (MCSA) ultrasonic, vibration analysis, Energy Efficiency Analysis, ASD Economic Evaluation, and thermography analysis records for each motor identified for theMotorManagement Program. Submit the records for the motor greasing and the root cause analysis

- Submit the report utilizing theMotorMaster Software

- Submit a detail MotorManagement ProgramPlanAnnually21 calendar days before the end of full performance21 calendar days before the end of every contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.4.3.1.3.1AFPAM32-1004 V2&V5,AFPAM32-1192
U02MotorManagement ProgramMotor Inventory ReportSubmit the complete inventory list of all motors (50HP and above) new and existing on TAFB for FAS approval. Database includes list of facility number and location in the facility, Operating hours, motors, base line disable readings, model & serial number, lubrication type, bearing type, motor name plate data, L10 and L50 life. (See Table A2.1 and Figure A2.1, A2.2, AFPAM32-1192)Annuallywithin 180 calendar days of full contract performanceNLT 21 calendar days before the end of each contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.4.3.1.3.1AFPAM32-1004 V2&V5,AFPAM32-1192
V01Predictability Based Maintenance (PdM) ProgramCritical Equipment ListSee PWS for the requirements (List must be approved by FAS 72 ABE/CENME)Annuallywithin 90 calendar days of full contract performanceNLT 21 calendar days before the end of each contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 through 1.1.3.8AFPAM32-1004 V2 and V5, SMRP
V02Predictability Based Maintenance (PdM) ProgramKey Performance Indicators (KPI), Leading and Lagging indicators, Reliability, Availability, Maintainability, and Overall Equipment EffectivenessSee PWS for the requirementsQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 through 1.1.3.8AFPAM32-1004 V2 and V5, SMRP
V03Predictability Based Maintenance (PdM) ProgramCondition of Air Force RPIE ReportDetailed report includes predicting possible failure modes, condition and promote an effective planning/scheduling program in order to prevent failure of critical/high impact equipment and unscheduled outagesQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 through 1.1.3.8AFPAM32-1004 V2 and V5, SMRP
V04Predictability Based Maintenance (PdM) ProgramPredictability Maintenance Program ReportDetailed report including metrics for Scheduled Maintenance Work Orders versus Unscheduled Maintenance Work Orders for Critical RPIE and Non Critical RPIE; Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR).Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.1.3 through 1.1.3.8AFPAM32-1004 V2 and V5, SMRP
X01Retro-Commissioning (RcX) ProgramRcX Program PlanSee PWS for the requirementsAnnuallywithin 90 calendar days of full contract performanceNLT 21 calendar days before end of each contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.5.1 ---> 1.2.5.1.2NEBB Procedural Standards for Testing Adjusting and Balancing of Environmental Systems, 7th

Edition and the NEBB Procedural Standards for Retro-Commissioning of Existing Buildings X02 Retro-Commissioning (RcX) Program RcX Corrective Action Facility Report Submit a certified RcX Corrective Action Facility Report for each facility inspected Quarterly within 90 calendar days of full contract performance NLT 14 days prior to the end of each quarter 72 ABW/CEY, 72 ABW/CEN Electronic Copy Para 1.2.5.1 ---> 1.2.5.1.2 NEBB Procedural Standards for Testing Adjusting and Balancing of Environmental Systems, 7th Edition and the NEBB Procedural Standards for Retro-Commissioning of Existing Buildings

Y01Barcode ProgramBarcode PlanDetailed plan to implement equipment and tracking information utilizing base maintenance software.Annuallywithin 90 calendar days of full contract performanceNLT 21 calendar days before end of each contract period72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.2.8
Z01AdministrativeMinimum Team ComplementMinimum information required: Personnel name, skill classification, hours worked, certification or license number and state/city of issue, and notes/commentsMonthly5th of the first month of full performanceNLT 5th of each month72 ABW/CEY, 72 ABW/CEN, AFSC/PZIOElectronic Copy, Hard Copy to AFSC/PZIOUpdate required for any personnel that are newly hired and/or replaced.
Z02Meeting MinutesMeeting MinutesSee attached CDRL in the Attachment Z-Report, Record of Meeting/MinutesAs requiredwithin 3 working days of every meetingwithin 3 working days of every meeting72 ABW/CEY, 72 ABW/CENElectronic CopyPara 1.4.1.6Only if requested by government or contractor

Sheet3

Submitted
In Process
Delinquent

File details come from the government source that posted it. Updated .