FA8101-15-R-0007-0002.pdf

PDF 21 KB Posted

Attached to
Tinker AFB CE Services-Operations Mgmt Federal contract opportunity
Solicitation number
FA8101-15-R-0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB CE Services-Operations Mgmt, newest first.
File Type Posted
Pricing_Matrix_Final_Rev_C_Supplemental.xlsx XLSX spreadsheet
4.9_Minimum_Team_Complement_Rev_D_8-20.pdf PDF
Section_M_CE_Ops_Rev_A_8-20.pdf PDF
FA8101-15-R-0007-0005.pdf PDF
Remaining_Question_13_Aug_15.pdf PDF
4.9_Minimum_Team_Complement_Rev_C.pdf PDF
FA8101-15-R-0007-0004.pdf PDF
Section_L_CE_Ops_Rev_A.pdf PDF
4.9_Minimum_Team_Complement_Rev_B.pdf PDF
Pricing_Matrix_Final_Rev_B.xlsx XLSX spreadsheet
FA8101-15-R-0007-0003.pdf PDF
Q A_6.pdf PDF
Final_Operations_PWS_30_July_15.pdf PDF
Pricing_Matrix_Final_Rev_A.xlsx XLSX spreadsheet
Revised_Appendices.zip ZIP file
New_Appendices.zip ZIP file
ppi_tool.accdb —
4.3_Deliverable_List.xlsx XLSX spreadsheet
Q A__4.pdf PDF
Q A__5.pdf PDF
Teamsters_CBA_2013-2016.pdf PDF
DB_WD_Highway_OK15.pdf PDF
Section_L_CE_Ops.pdf PDF
WD_2005-2431_Rev_19.pdf PDF
4.6_Workload_Data.zip ZIP file
DB_WD_Heavy_OK26.pdf PDF
4.4_Environmental_Requirements.zip ZIP file
FA8101-15-R-0007.pdf PDF
4.9_Minimum_Team_Complement.pdf PDF
Tinker_IAM_CBA_2013-2016.pdf PDF
Section_M_CE_Ops.pdf PDF
4.2_Applicable_Pubs.zip ZIP file
4.8_SOP.zip ZIP file
4.3_Deliverable_List.zip ZIP file
4.7_GFP.zip ZIP file
DB_WD_Building_OK49.pdf PDF
DD254_Redacted.pdf PDF
Final_Operations_PWS.pdf PDF
4.5_Maps_and_Facility_Drawings.zip ZIP file
4.1_Acronyms _Abbreviations_and_Definitions.zip ZIP file
Pricing_Matrix_Final.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3Y0AA3003A006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8101-15-R-0007

X 9B. DATED (SEE ITEM 11)

08-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jul-2015

CODE

AFSC/PZIOCB

ANDRE CASIANO/405-739-4035

7858 5TH ST STE 1

TINKER AFB OK 73145-9125

FA8101 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8101-15-R-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NOTES

The purpose of this amendment is to extend the proposal due date, incorporate the new Statement of Work, update appendices, and add appendices.

FIRST: The proposal due date is hereby extended by 17 days. Time shall remain 3:00 p.m. local time From: 7 August 2015 To: 24 August 2015

SECOND: PWS dated 8 July 2015, 92 pages is hereby rescinded and PWS dated 30 July 2015, 92 pages is hereby incorporated into the solicitation.

THIRD: The following PWS appendices have been updated

1) 4 1 Acronyms, Abbreviations, & Definitions Rev A.pdf

2) 4.6.1.18--Meter Management Rev A.pdf

3) 4.6.1.25--Interior Modular Structures Rev A.pdf

4) 4.6.1.32--CEMEA PM Workload Rev A.xlxs

6) 4.7.5.1--Government-Furnished Equipment - DRMO Vehicles Rev A.pdf

7) 4.7.5--Government-Furnished Equipment - Vehicles Rev A.pdf

8) 4.9 Minimum Team Compliment Rev A

FOURTH: The following appendices have been added.

1) 4.5.3 Contractor Constructed Facility Concept Drawing

2) 4.5.4 Contractor Constructed Facility Utilities

3) 4.6.1.35--Denial Barriers.pdf

4) 4.7.14--Contractor Constructed Facility Concept Sketch

FIFTH: The pricing matrix is hereby revised to reflect CLIN 0001 being evaluated into the TEP.

1) Pricing Matrix Rev A supercedes Pricing Matrix Final

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Aug-2015 03:00 PM to 24-Aug-2015 03:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

FA8101-15-R-0007

Attachments:

Performance Work Statement 30 Jul 15 92 pages PWS Appendices:

4.1 Acronyms, Abbreviations And Definitions

4.2 Applicable Publications

4.3 Deliverables

4.4 Environmental Requirements

4.5 Maps And Facility Drawings

4.6 Workload Data

4.7 Government-Furnished Items

4.8 Standard Operation Procedures

4.9 Minimum Team Complement Rev A

Building (OK49) 12 Jun 15 7 pages Heavy (OK26) 12 Jun 15 5 pages Highway (OK15) WDs 2 Jan 15 4 pages Service Contract Act WD 05-2431 22 Dec 14 10 pages Tinker IAM CBA 2013-2016 26 Aug 13 58 pages Teamsters CBA 1 Sep 13 43 pages Tinker Mission Dependability Index (TMDI) Operational Risk Matrix (ORM)

DD254

Pricing Matrix Rev A

(End of Summary of Changes)

File details come from the government source that posted it. Updated .