FA8101-15-R-0007-0003.pdf

PDF 33 KB Posted

Attached to
Tinker AFB CE Services-Operations Mgmt Federal contract opportunity
Solicitation number
FA8101-15-R-0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

FA8101-15-R-0007-0003

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB CE Services-Operations Mgmt, newest first.
File Type Posted
Pricing_Matrix_Final_Rev_C_Supplemental.xlsx XLSX spreadsheet
Section_M_CE_Ops_Rev_A_8-20.pdf PDF
FA8101-15-R-0007-0005.pdf PDF
4.9_Minimum_Team_Complement_Rev_D_8-20.pdf PDF
Remaining_Question_13_Aug_15.pdf PDF
4.9_Minimum_Team_Complement_Rev_C.pdf PDF
FA8101-15-R-0007-0004.pdf PDF
Section_L_CE_Ops_Rev_A.pdf PDF
4.9_Minimum_Team_Complement_Rev_B.pdf PDF
Pricing_Matrix_Final_Rev_B.xlsx XLSX spreadsheet
Q A_6.pdf PDF
Final_Operations_PWS_30_July_15.pdf PDF
Pricing_Matrix_Final_Rev_A.xlsx XLSX spreadsheet
New_Appendices.zip ZIP file
FA8101-15-R-0007-0002.pdf PDF
Revised_Appendices.zip ZIP file
ppi_tool.accdb —
4.3_Deliverable_List.xlsx XLSX spreadsheet
Q A__4.pdf PDF
Q A__5.pdf PDF
Teamsters_CBA_2013-2016.pdf PDF
DB_WD_Highway_OK15.pdf PDF
Section_L_CE_Ops.pdf PDF
WD_2005-2431_Rev_19.pdf PDF
Tinker_IAM_CBA_2013-2016.pdf PDF
Section_M_CE_Ops.pdf PDF
4.2_Applicable_Pubs.zip ZIP file
4.8_SOP.zip ZIP file
4.3_Deliverable_List.zip ZIP file
4.7_GFP.zip ZIP file
DB_WD_Building_OK49.pdf PDF
DD254_Redacted.pdf PDF
Final_Operations_PWS.pdf PDF
4.5_Maps_and_Facility_Drawings.zip ZIP file
4.1_Acronyms _Abbreviations_and_Definitions.zip ZIP file
Pricing_Matrix_Final.xlsx XLSX spreadsheet
4.6_Workload_Data.zip ZIP file
DB_WD_Heavy_OK26.pdf PDF
4.4_Environmental_Requirements.zip ZIP file
FA8101-15-R-0007.pdf PDF
4.9_Minimum_Team_Complement.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3Y0AA3003A006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to correct the description of CLINS 1019, 1020, 2019, 2020, 3019, 3020, 4019, 4020, 5019, 5020;

incorporate revised PWS Appendix 4.9 Minimum Team Compliment Rev B; incorporate Section L Ops Rev A, incorporate Pricing Matrix Final Rev B. and reference attachments Section L and Section M w ithin the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8101-15-R-0007

X 9B. DATED (SEE ITEM 11)

08-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2015

CODE

AFSC/PZIOCB

ANDRE CASIANO/405-739-4035

7858 5TH ST STE 1

TINKER AFB OK 73145-9125

FA8101 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8101-15-R-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NOTES

The purpose of this amendment is to correct the description of CLINS 1019, 1020, 2019, 2020, 3019, 3020, 4019, 4020, 5019, 5020; incorporate revised PWS Appendix 4.9 Minimum Team Compliment Rev B; incorporate Section L Ops Rev A, incorporate Pricing Matrix Final Rev B. and reference attachments Section L and Section M within the solicitation

FIRST: CLIN Descriptions of CLINS 1019, 1020, 2019, 2020, 3019, 3020, 4019, 4020, 5019, and 5020 have been corrected to reflect a quantity of 5

SECOND: PWS Appendix 4.9 Minimum Team Compliment Rev B is hereby incorporated. All other 4.9 appendices are hereby rescinded.

THIRD: Section L Rev A. is hereby incorporated. All other section L attachments are hereby rescinded.

FOURTH: Pricing Matrix Final Rev B. is hereby incorporated. All other pricing matrices are hereby rescinded.

FIFTH: Solicitation UCF Section: L and UCF Section: M is hereby changed to reference Section L and Section M as attachments.

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 1019

The CLIN extended description has changed from Entry Control Points (ECPs)Snow & Ice RemovalOption I 1 November 2016 - 31 March 2017--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--ECPsCOLS 4 - Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Entry Control Points (ECPs)Snow & Ice RemovalOption I 1 November 2016 - 31 March 2017--ECPs

Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________--ECPsCOLS 4

- Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract..

CLIN 1020

The CLIN extended description has changed from Pavements - Base Wide (Streets) Snow & Ice RemovalOption I 1 November 2016 - 31 March 2017COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Extended Price:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Pavements - Base Wide (Streets) Snow & Ice RemovalOption I 1 November 2016 - 31 March 2017COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS

1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________-- Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS

1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________-- Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Extended Price:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract..

CLIN 2019

& Ice RemovalOption II1 November 2017 - 31 March 2018--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 4 - Red ( see MAP) PWS 1.2.2.2 to

1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Entry Control Points (ECPs)Snow & Ice RemovalOption II1 November 2017 - 31 March 2018--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_____________ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 4

- Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each

CLIN 2020

Snow & Ice RemovalOption II1 November 2017 - 31 March 2018COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Pavements - Base Wide (Streets) Snow & Ice RemovalOption II1 November 2017 - 31 March 2018COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract..

CLIN 3019

& Ice RemovalOption III1 November 2018 - 31 March 2019--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item

Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 4 - Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Entry Control Points (ECPs)Snow & Ice RemovalOption III1 November 2018 - 31 March 2019--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 4

- Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each

CLIN 3020

Snow & Ice RemovalOption III1 November 2018 - 31 March 2019COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Pavements - Base Wide (Streets) Snow & Ice RemovalOption III1 November 2018 - 31 March 2019COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract..

CLIN 4019

& Ice RemovalOption IV1 November 2019 - 31 March 2020--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 4 - Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Entry Control Points (ECPs)Snow & Ice RemovalOption IV1 November 2019 - 31 March 2020--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 4

- Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each

CLIN 4020

Snow & Ice RemovalOption IV1 November 2019 - 31 March 2020COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Pavements - Base Wide (Streets) Snow & Ice RemovalOption IV1 November 2019 - 31 March 2020COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will

CLIN 5019

& Ice RemovalOption V1 November 2020 - 31 March 2021--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--ECPsCOLS 4 - Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Entry Control Points (ECPs)Snow & Ice RemovalOption V1 November 2020 - 31 March 2021--ECPs Snow & Ice Removal COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPs COLS 2 - Red, Yellow, & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 3 - Red & Yellow (see MAP)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--ECPsCOLS 4

- Red ( see MAP) PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each

CLIN 5020

Snow & Ice RemovalOption V1 November 2020 - 31 March 2021COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 12 Line Item Cost:_______________*COLS funding levels will be determined at the beginning of each contract period, as identified in the written notice required IAW FAR 52.217-9, Option to Extend the Term of the Contract. to Pavements - Base Wide (Streets) Snow & Ice RemovalOption V1 November 2020 - 31 March 2021COLS 1 - 100% (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 2 - Red, Yellow & Green (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 3 - Red & Yellow (see MapPWS 1.2.2.2 to

1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________--Pavements - Base Wide (Streets) Snow & Ice RemovalCOLS 4 - Red (see Map)PWS 1.2.2.2 to 1.2.2.2.6Unit Price:_____________ Qty: 5 Line Item Cost:_______________*COLS funding levels will

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachments:

Performance Work Statement 30 Jul 15 92 pages PWS Appendices:

4.1 Acronyms, Abbreviations And Definitions

4.2 Applicable Publications

4.3 Deliverables

4.4 Environmental Requirements

4.5 Maps And Facility Drawings

4.6 Workload Data

4.7 Government-Furnished Items

4.8 Standard Operation Procedures

4.9 Minimum Team Complement Rev B

Building (OK49) 12 Jun 15 7 pages Heavy (OK26) 12 Jun 15 5 pages Highway (OK15) WDs 2 Jan 15 4 pages Service Contract Act WD 05-2431 22 Dec 14 10 pages Tinker IAM CBA 2013-2016 26 Aug 13 58 pages Teamsters CBA 1 Sep 13 43 pages Tinker Mission Dependability Index (TMDI) Operational Risk Matrix (ORM)

DD254

Pricing Matrix Rev B Section L CE Ops Rev A 36 pages Section M CE Ops 13 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

See attached Section L

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

See attached Section M

(End of Summary of Changes)

File details come from the government source that posted it. Updated .