Revised Attachment 4 Past Performance Reference Sheet
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
Base Roofing ID/IQ
Tinker Air Force Base
Past Performance Reference Sheet
All bidders will have their past performance reviewed. The answers to the Past Performance Reference Sheet shall be signed by an authorized officer of the company and shall be notarized. Include information for joint ventures and partnerships made within the last five years.
1.
The name under which the Company is doing business.
2.
The type of company (i.e. corporation, partnership, individual, joint venture, etc.)
3.
The Local Street (PO Box is not acceptable) address of the company.
4.
The local mailing address of the company.
5.
The address of the company’s corporate headquarters, if different from the local address.
6.
The date and State of incorporation or the date of organization if not a corporation.
7.
A list of the corporate officers or of all the full and limited partners if not a corporation.
8.
A list of the individuals who will have obligation authority for the company and their title or position.
9. The length of time the company has been doing business under this name.
10.
The names and dates the company has operated under a different name.
11.
A list of individuals authorized to negotiate with the Government.
12.
A current Dun & Bradstreet report on the company.
13.
The number of administrative employees.
14.
The number of employed tradesmen including superintendents.
15.
A list of company owned equipment to be used on this contract.
16.
A list of companies where the contractor currently rents or plans to rent its construction equipment and any credit limits that may apply to those accounts.
17.
A list of projects of the following types completed by the company within the last five (5) years. Each Offeror shall designate which portions of the work performed were accomplished in-house and which portions were contracted out to subcontractor. All lists shall include the name and address of the project and shall include the name, title, and phone number of the point of contact for each.
1) Removing existing roof system to existing roof deck; and furnishing and installing new Asphalt Shingle Roof System.
2) Removing existing roof system to existing roof deck; and furnishing and installing new 4 PLY BUR Coal Tar System
3) Removing existing roof system to existing roof deck; and furnishing and installing new 4 PLY MB Hot Asphalt Roof System
4) Removing existing roof system to existing roof deck; and furnishing and installing new 2 PLY MB Torch Applied Roof System
5) Removing existing roof system to existing roof deck; and furnishing and installing new 2 PLY MB Cold Applied Roof System
6) Removing existing roof system to existing roof deck; and furnishing and installing new Standing Seam Metal Roof System
7) Removing existing roof system to existing roof deck; and furnishing and installing new Industrial Sheet Metal Roof System similar to Berridge “M-Panel” Exposed Fastener Panel to include:
Underwriters’ Laboratories UL 90 Approval
Kynar 500 Factory Finish
24 gauge steel panel thickness
Continuous sealant tape application all panel laps
Neoprene washer seals all fasteners
8) Removing existing roof system to existing roof deck; and furnishing and installing new Spray Polyurethane Foam Roof similar to Neogard Corporation’s “Permathane II FR” Roofing System to include:
Single Component Polyurethane Coating System
Coating applied in Base and Top Coat Applications
Minimum coating total system thickness of 30 dry mils average (minimum 16 dry mils anywhere on roof)
Over 2 inch minimum SPF (Spray Polyurethane Foam) insulation thickness
¼” per foot surface slope to drain
FM 1-120 Approval Listing
9) Roof system to include:
a) removing existing equipment i.e. HVAC systems in order to raise equipment curbs, resetting equipment.
b) removing existing roof drains and replacing with new roof drains.
c) installing interior roof drains and piping.
d) removing and installing roof gutters and downspouts
e) installing roof scuppers
f) installing flat and tapered insulation board, crikets, cants, and flashing
g) removing and replacing existing exantion joint materials.
18.
A list of projects under construction by the company.
19.
A list of projects that have been bid by the company and are still pending.
20.
A history of all litigation brought against or by the company for the last ten years.
21. A history of all liens placed on or by the company for the last ten years.
22. Date of Section 8(A) Certification.
23. A list of CAGE code, DUNS code, and size of business.
24.
Statement from Surety with bonding capacity for one (1) year.