FA8101-08-R-0024-0004.doc

DOC document 34 KB Posted

Attached to
Roofing IDIQ Federal contract opportunity
Solicitation number
FA8101-08-R-0024
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Amendemnt to address industry RFI

View the file

Other files for this federal contract opportunity

Other files attached to Roofing IDIQ, newest first.
File Type Posted
FA8101-08-R-0024-0010.doc DOC document
FA8101-08-R-0024-0009.doc DOC document
FA8101-08-R-0024-0008.doc DOC document
FA8101-08-R-0024-0007.doc DOC document
01011 Contract Summary of Work Revised 15 Apr 08.doc DOC document
FA8101-08-R-0024Attachment4RoofingReferenceSheetRevised.doc DOC document
FA8101-08-R-0024Attachment4RoofingReferenceSheetRevised.doc DOC document
FA8101-08-R-0024-0003.doc DOC document
Revised —
01011 Contract Summary of Work Revised 15 Apr 08.doc DOC document
Revised Roofing Schedule B Spreadsheet.xls XLS spreadsheet
FA8101-08-R-0024-0002.doc DOC document
FA8101-08-R-0024-0001.doc DOC document
FA8101-08-R-0024Attachment3PastandPresentPerformanceQuestionnair —
007100.pdf PDF
FA8101-08-R-0024Attachment3PASTANDPRESENTPERFORMANCEQUESTIONNAIR —
FA8101-08-R-0024Attachment4Roofingreferencesheet.docm DOCM document
RoofingIDIQ2007.pdf PDF
FA8101-08-R-0024.doc DOC document
FA8101-08-R-0024Attachment6pastpeforconsentletter.docm DOCM document
FA8101-08-R-0024Attachment7pastperfauthorizationletter.docm DOCM document
FA8101-08-R-0024Attachment8WageDetermination.pdf PDF
FA8101-08-R-0024Attachment2CostBreakdown.xls XLS spreadsheet
007200.pdf PDF
007000.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

0SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 04

FIRST: In reference to RFP FA8101-08-R-0024, issued 14 March 2008, the following RFI and response shall be incorporated into the solicitation as follows:

RFI#143: QUESTION:

An RFI was received from industry requesting the warranty line items’ unit of issue be changed from “EACH” to “SQUARE FOOT” and to revisit the maximum estimated quantities associated with the warranty line items.

RESPONSE:

Warranty line items’ unit of issue within the schedule B spreadsheet will remain “EACH” as warranties will be ordered by project and not by square footage. The warranty line item maximum estimated quantity is the estimated number of projects per the range of square footage of each specific warranty line item. The maximum estimated quantities are based on anticipated requirements of the Government.

SECOND: All others terms and conditions remain unchanged and in full force and effect.

The following have been deleted:

AMENDMENT 03

(End of Summary of Changes)