FA8101-08-R-0024-0003.doc
DOC document 35 KB Posted
- Attached to
- Roofing IDIQ Federal contract opportunity
- Solicitation number
- FA8101-08-R-0024
About this file
Amendment 03 to address RFI's from Industry
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 03
The solicitation is hereby modified as follows:
FIRST: In reference to RFP FA8101-08-R-0024, issued 14 March 2008, the following RFI’s and responses shall be incorporated into the solicitation as follows:
RFI #141. QUESTION. It appears that you have left the warranty line items for single plys in the revised schedule B spreadsheet. This will have an effect on the bottom line of the bid.
Please clarify that they are still to remain in the line items.
RESPONSE. All warranty line items for single ply roofing systems are hereby deleted from Schedule B.
RFI #142.QUESTION. Is the requirement for experience with the two single plys in Attachment 4 still required since they have been deleted from the proposal?
RESPONSE. Experience with single ply roofing systems shall be excluded from Attachment 4 ‘Past Performance Reference Sheet’.
SECOND: The following line items are hereby deleted from the requirement and Schedule B (Attachment 5 excel spreadsheet) of the solicitation. A revised Schedule B is attached to this amendment:
0001CV, 1001CV, 2001CV, 3001CV, and 4001CV – 10 Year NDL Systems Warranty for Single Ply EPDM Roof 1-10000 SF
0001CW, 1001CW, 2001CW, 3001CW, and 4001CW – 10 Year NDL Systems Warranty for Single Ply EPDM Roof 10001-100000 SF
THIRD: Attached is revised Attachment 4 ‘Past Performance Reference Sheet’ to delete 1 Ply EPDM Roofing System and 1 Ply CSP Roof System. Any reference to 1 Ply roofing systems within the solicitation shall be considered omitted from the requirement.
FOURTH: All others terms and conditions remain unchanged and in full force and effect.
The following have been deleted:
AMENDMENT 02
(End of Summary of Changes)
File details come from the government source that posted it. Updated .