This document is the conform copy of the RFP. It contains updates made to the RFP as a result of Amendment 0001 .

View the file

Other files for this federal contract opportunity

Other files attached to Enterprise Roof Replacement and Repair, newest first.
File Type Posted
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0007.docx DOCX document
Amendment_0007.pdf PDF
FA8056-14-R-0001_0006_Section_K_excerpt.pdf PDF
FA8056-14-R-0001_Amendment_0006.pdf PDF
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0006.docx DOCX document
Amend_0006_Clause_Fill_in_Checklist_Sec_K.pdf PDF
FA8056-14-R-0001_Amendment_0006-Signed.pdf PDF
Roofing_RFP_QandA_February_21_2014.pdf PDF
Roofing_RFP_QandA_February_20_2014.pdf PDF
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0004.docx DOCX document
Attachment_A_Proposal_Cover_Sheetv4(1).xlsx XLSX spreadsheet
Attachment_1_-_Roofing_Management_Plan_Worksheet(1).xlsx XLSX spreadsheet
Roofing_RFP_QandA_February_19_2014.pdf PDF
Roofing_RFP_QandA_February_14_2014v5.pdf PDF
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0003.docx DOCX document
Attachment_1_-_Roofing_Management_Plan_Worksheet.xlsx XLSX spreadsheet
Attachment_2_-_Roofing_Price_Matrix.xlsx XLSX spreadsheet
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0002.docx DOCX document
FA8056-14-R-0001_Amendment_0002.doc DOC document
Attachment_A_-_Cover_Letter_Template.xlsx XLSX spreadsheet
Roofing_RFP_QandA_February_7_2014.pdf PDF
Roofing_RFP_QandA_January_31_2014.pdf PDF
Roofing_RFP_QandA_January_24_2014.pdf PDF
Summary_of_Changes_RFP_FA8056-14-R-0001_Amendment_0001.docx DOCX document
Attachment_7_-_Roofing_Past_Performance_Questionnaire_(Reference).pdf PDF
Attachment_1_-_Roofing_Management_Plan_Worksheet.xlsx XLSX spreadsheet
Roofing_RFP_QandA_January_17_2014.pdf PDF
Attachment_6_-_Davis_Bacon_Wage_Rates_(Reference).pdf PDF
Attachment_7_-_Roofing_Past_Performance_Questionnaire_(Reference).pdf PDF
Attachment_2_-_Roofing_Price_Matrix.xlsx XLSX spreadsheet
Attachment_A_Proposal_Cover_Sheet.xlsx XLSX spreadsheet
Attachment_4_-_Region_Map_(Reference).pdf PDF
Attachment_1_-_Roofing_Management_Plan_Worksheet.xlsx XLSX spreadsheet
Attachment_5_-_Roofing_CDRL_(Reference).pdf PDF
Attachment_3_-_Roofing_Typical_and_Most_Difficult_Project_Descriptions_(Reference).xlsx XLSX spreadsheet
FA8056-14-R-0001_Request_For_Proposal.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Asphal Built-Up Membrane Roof

FFP

IAW: UFGS 07 51 13, Built-Up Asphalt Roofing

Furnish all plant, labor, equipment and materials necessary to replace low slope asphalt built-up membrane roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

SBS Modified Bitumen Roof

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Styrene Butadiene Styrene (SBS) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

APP Modified Bitumen Roof

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Atactic Polypropylene Polymer (APP) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

EPDM Single Ply Membrane Roof

IAW: UFGS 07 53 23, Ethylene-Propylene-Diene-Monomer (EPDM) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope EPDM Single Ply Membrane Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

PVC Single Ply Membrane Roof

IAW: UFGS 07 54 19, Polyvinyl-Chloride (PVC) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope PVC Single Ply Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

SPF Roof

IAW: UFGS 07 57 13, Sprayed Polyurethane Foam (SPF) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope SPF roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Metal (Hydrostatic) Membrane Roof

IAW: UFGS 07 41 13, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal low slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Asphalt Shingle Roof

IAW: UFGS 07 31 13, Asphalt Shingle Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the asphalt shingle steep slope in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Tile Roof

IAW: UFGS 07 32 13 and UFGS 07 32 14, Clay Tiles or Roof Tiles.

Furnish all plant, labor, equipment, and materials necessary to replace the tile steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Slate Roof

IAW: UFGS 07 31 26, Slate Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the slate steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot

Metal Roof

IAW: UFGS 07 41 14, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Program Management Review

The contractor shall participate in an annual PMR with the Air Force Installation Contracting Agency Roofing Program Team and other stakeholders in accordance with the Statement of Work found in Section C. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, quality, competitiveness, and/or any other topic the Government or contractor deem necessary to reducing costs, increasing quality, or resolving issues.

Region Awarded: TBD

INFORMATION FOR RFP ONLY: No price shall be provided for this CLIN. This CLIN is not separately priced, meaning that the cost of this effort should be rolled into priced CLINs. If no task orders are issued during the ordering period, a PMR is not required.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Contract Data Requirement List (CDRL)

The contractor shall provide the data required in CDRL A001 in accordance with the Statement of Work found in Section C. See Attachment 5 Roofing CDRL, DD1423 found in Section J of this RFP.

Region Awarded: TBD

If no task orders are issued during the ordering period, the contractor need not comply with this CLIN.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, no price is needed for this CLIN, the Data to be provided shall not be separately priced meaning that the cost of this effort should be rolled into priced CLINs.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Post Award Orientation

Participation in Mandatory, one day, Post Award Orientation. Post award conference may be conducted in person or by virtual/electronic means.

Region Awarded: TBD

INFORMATION FOR RFP ONLY: The value of this post award orientation will be $1,000. The Offeror should not provide pricing for this line item, but shall submit with its proposal a signed statement from an uthorized representative on company letterhead indicating it will participate in the mandatory post award orientation; that it understands $1,000 will be the totat price for participation (no more and no less). This instruction is also found in Section L Paragraph 1.3 of this request for proposal.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphal Built-Up Membrane Roof

FFP

IAW: UFGS 07 51 13, Built-Up Asphalt Roofing

Furnish all plant, labor, equipment and materials necessary to replace low slope asphalt built-up membrane roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SBS Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Styrene Butadiene Styrene (SBS) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
APP Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Atactic Polypropylene Polymer (APP) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
EPDM Single Ply Membrane Roof

FFP

IAW: UFGS 07 53 23, Ethylene-Propylene-Diene-Monomer (EPDM) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope EPDM Single Ply Membrane Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
PVC Single Ply Membrane Roof

FFP

IAW: UFGS 07 54 19, Polyvinyl-Chloride (PVC) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope PVC Single Ply Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SPF Roof

FFP

IAW: UFGS 07 57 13, Sprayed Polyurethane Foam (SPF) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope SPF roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal (Hydrostatic) Membrane Roof

FFP

IAW: UFGS 07 41 13, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal low slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphalt Shingle Roof

FFP

IAW: UFGS 07 31 13, Asphalt Shingle Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the asphalt shingle steep slope in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Tile Roof

FFP

IAW: UFGS 07 32 13 and UFGS 07 32 14, Clay Tiles or Roof Tiles.

Furnish all plant, labor, equipment, and materials necessary to replace the tile steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Slate Roof

FFP

IAW: UFGS 07 31 26, Slate Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the slate steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal Roof

FFP

IAW: UFGS 07 41 14, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each
OPTION
Program Management Review

FFP

The contractor shall participate in an annual PMR with the Air Force Installation Contracting Agency Roofing Program Team and other stakeholders in accordance with the Statement of Work found in Section C. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, quality, competitiveness, and/or any other topic the Government or contractor deem necessary to reducing costs, increasing quality, or resolving issues.

Region Awarded: TBD

INFORMATION FOR RFP ONLY: No price shall be provided for this CLIN. This CLIN is not separately priced, meaning that the cost of this effort should be rolled into priced CLINs. If no task orders are issued during the ordering period, a PMR is not required.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each
OPTION
Contract Data Requirement List (CDRL)

FFP

The contractor shall provide the data required in CDRL A001 in accordance with the Statement of Work found in Section C. See Attachment 5 Roofing CDRL, DD1423 found in Section J of this RFP.

Region Awarded: TBD

If no task orders are issued during the ordering period, the contractor need not comply with this CLIN.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, no price is needed for this CLIN, the Data to be provided shall not be separately priced meaning that the cost of this effort should be rolled into priced CLINs.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphal Built-Up Membrane Roof

FFP

IAW: UFGS 07 51 13, Built-Up Asphalt Roofing

Furnish all plant, labor, equipment and materials necessary to replace low slope asphalt built-up membrane roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SBS Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Styrene Butadiene Styrene (SBS) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
APP Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Atactic Polypropylene Polymer (APP) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
EPDM Single Ply Membrane Roof

FFP

IAW: UFGS 07 53 23, Ethylene-Propylene-Diene-Monomer (EPDM) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope EPDM Single Ply Membrane Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
PVC Single Ply Membrane Roof

FFP

IAW: UFGS 07 54 19, Polyvinyl-Chloride (PVC) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope PVC Single Ply Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SPF Roof

FFP

IAW: UFGS 07 57 13, Sprayed Polyurethane Foam (SPF) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope SPF roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal (Hydrostatic) Membrane Roof

FFP

IAW: UFGS 07 41 13, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal low slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphalt Shingle Roof

FFP

IAW: UFGS 07 31 13, Asphalt Shingle Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the asphalt shingle steep slope in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Tile Roof

FFP

IAW: UFGS 07 32 13 and UFGS 07 32 14, Clay Tiles or Roof Tiles.

Furnish all plant, labor, equipment, and materials necessary to replace the tile steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Slate Roof

FFP

IAW: UFGS 07 31 26, Slate Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the slate steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal Roof

FFP

IAW: UFGS 07 41 14, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each
OPTION
Program Management Review

FFP

The contractor shall participate in an annual PMR with the Air Force Installation Contracting Agency Roofing Program Team and other stakeholders in accordance with the Statement of Work found in Section C. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, quality, competitiveness, and/or any other topic the Government or contractor deem necessary to reducing costs, increasing quality, or resolving issues.

Region Awarded: TBD

INFORMATION FOR RFP ONLY: No price shall be provided for this CLIN. This CLIN is not separately priced, meaning that the cost of this effort should be rolled into priced CLINs. If no task orders are issued during the ordering period, a PMR is not required.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each
OPTION
Contract Data Requirement List (CDRL)

FFP

The contractor shall provide the data required in CDRL A001 in accordance with the Statement of Work found in Section C. See Attachment 5 Roofing CDRL, DD1423 found in Section J of this RFP.

Region Awarded: TBD

If no task orders are issued during the ordering period, the contractor need not comply with this CLIN.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, no price is needed for this CLIN, the Data to be provided shall not be separately priced meaning that the cost of this effort should be rolled into priced CLINs.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphal Built-Up Membrane Roof

FFP

IAW: UFGS 07 51 13, Built-Up Asphalt Roofing

Furnish all plant, labor, equipment and materials necessary to replace low slope asphalt built-up membrane roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SBS Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Styrene Butadiene Styrene (SBS) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
APP Modified Bitumen Roof

FFP

IAW: UFGS 07 52 00, Modified Bituminous Membrane Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope Atactic Polypropylene Polymer (APP) modified roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
EPDM Single Ply Membrane Roof

FFP

IAW: UFGS 07 53 23, Ethylene-Propylene-Diene-Monomer (EPDM) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope EPDM Single Ply Membrane Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
PVC Single Ply Membrane Roof

FFP

IAW: UFGS 07 54 19, Polyvinyl-Chloride (PVC) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope PVC Single Ply Roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
SPF Roof

FFP

IAW: UFGS 07 57 13, Sprayed Polyurethane Foam (SPF) Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace low slope SPF roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal (Hydrostatic) Membrane Roof

FFP

IAW: UFGS 07 41 13, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal low slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Asphalt Shingle Roof

FFP

IAW: UFGS 07 31 13, Asphalt Shingle Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the asphalt shingle steep slope in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Tile Roof

FFP

IAW: UFGS 07 32 13 and UFGS 07 32 14, Clay Tiles or Roof Tiles.

Furnish all plant, labor, equipment, and materials necessary to replace the tile steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Slate Roof

FFP

IAW: UFGS 07 31 26, Slate Roofing.

Furnish all plant, labor, equipment, and materials necessary to replace the slate steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing construction work), and installing new construction (new insulation, roofing, and flashing systems).

Region Awarded: TBD

The base contracting officer (CO) will decide with each order whether "typical" or "most difficult" pricing is used. The decision of the CO is final.

INFORMATION FOR RFP ONLY: For purposes of completing the solicitation, the Contractor should not enter prices into these blanks. Pricing shall be provided in RFP Section J Attachment 2 - Roofing Price Matrix

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Square Foot
OPTION
Metal Roof

FFP

IAW: UFGS 07 41 14, UFGS 07 41 63, UFGS 07 61 14.00 20, and UFGS 07 61 15.00 20.

Furnish all plant, labor, equipment, and materials necessary to replace the metal steep slope roof in accordance with the Statement of Work found in Section C. Work includes, but is not limited to, removing and disposing of the existing roofing and flashing system (materials above the roof deck), incidental general construction work (mechanical, electrical, non-roofing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .