FA7000-09-R-0059
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 30,000,000 Dollars, U.S.
Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. At the end of this base period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
FOB: Destination
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 17,000,000 Dollars, Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. At the end of this base period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
MAX NET AMT
CEILING PRICE
UNIT UNIT PRICE MAX AMOUNT
0003 2,000,000 Dollars, Travel - Firm Fixed Price (3400)
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0004 5,000,000 Dollars, Material - Firm Fixed Price (3400)
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0005 3,000,000 Dollars, Storage - Firm Fixed Price (3400)
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0006 3,000,000 Dollars, Transportation - Firm Fixed Price (3400)
Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0007 8,000,000 Dollars, Labor - Firm Fixed Price (3600)
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. At the end of this base period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0008 18,000,000 Dollars, Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. At the end of this base period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0009 980,000 Dollars, Travel - Firm Fixed Price (3600)
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0010 3,000,000 Dollars, Material - Firm Fixed Price (3600)
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0011 10,000 Dollars, Storage - Firm Fixed Price (3600)
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0012 10,000 Dollars, Transportation - Firm Fixed Price (3600)
Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1003 UNDEFINED
OPTION Travel - Firm Fixed Price (3400)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1004 UNDEFINED
OPTION Material - Firm Fixed Price (3400)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1005 UNDEFINED
OPTION Storage - Firm Fixed Price (3400)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1006 UNDEFINED
OPTION Transportation - Firm Fixed Price (3400)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1007 UNDEFINED
OPTION Labor - Firm Fixed Price (3600)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1008 UNDEFINED
OPTION Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1009 UNDEFINED
OPTION Travel - Firm Fixed Price (3600)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1010 UNDEFINED
OPTION Material - Firm Fixed Price (3600)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1011 UNDEFINED
OPTION Storage - Firm Fixed Price (3600)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1012 UNDEFINED
OPTION Transportation - Firm Fixed Price (3600)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2003 UNDEFINED
OPTION Travel - Firm Fixed Price (3400)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2004 UNDEFINED
OPTION Material - Firm Fixed Price (3400)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2005 UNDEFINED
OPTION Storage - Firm Fixed Price (3400)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2006 UNDEFINED
OPTION Transportation - Firm Fixed Price (3400)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2007 UNDEFINED
OPTION Labor - Firm Fixed Price (3600)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2008 UNDEFINED
OPTION Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2009 UNDEFINED
OPTION Travel - Firm Fixed Price (3600)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2010 UNDEFINED
OPTION Material - Firm Fixed Price (3600)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2011 UNDEFINED
OPTION Storage - Firm Fixed Price (3600)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2012 UNDEFINED
OPTION Transportation - Firm Fixed Price (3600)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3003 UNDEFINED
OPTION Travel - Firm Fixed Price (3400)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3004 UNDEFINED
OPTION Material - Firm Fixed Price (3400)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3005 UNDEFINED
OPTION Storage - Firm Fixed Price (3400)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3006 UNDEFINED
OPTION Transportation - Firm Fixed Price (3400)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3007 UNDEFINED
OPTION Labor - Firm Fixed Price (3600)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3008 UNDEFINED
OPTION Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3009 UNDEFINED
OPTION Travel - Firm Fixed Price (3600)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3010 UNDEFINED
OPTION Material - Firm Fixed Price (3600)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3011 UNDEFINED
OPTION Storage - Firm Fixed Price (3600)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
3012 UNDEFINED
OPTION Transportation - Firm Fixed Price (3600)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period:: 21 February 2014 through 20 February 2015 Performance of task order may continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
4002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .