FA7000-09-R-0059

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 30,000,000 Dollars, U.S.

Labor - Firm Fixed Price (3400)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. At the end of this base period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 17,000,000 Dollars, Labor - FFP Level of Effort (3400)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. At the end of this base period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.

MAX NET AMT

CEILING PRICE

UNIT UNIT PRICE MAX AMOUNT

0003 2,000,000 Dollars, Travel - Firm Fixed Price (3400)

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0004 5,000,000 Dollars, Material - Firm Fixed Price (3400)

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0005 3,000,000 Dollars, Storage - Firm Fixed Price (3400)

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0006 3,000,000 Dollars, Transportation - Firm Fixed Price (3400)

Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0007 8,000,000 Dollars, Labor - Firm Fixed Price (3600)

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. At the end of this base period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0008 18,000,000 Dollars, Labor - FFP Level of Effort (3600)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. At the end of this base period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0009 980,000 Dollars, Travel - Firm Fixed Price (3600)

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0010 3,000,000 Dollars, Material - Firm Fixed Price (3600)

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0011 10,000 Dollars, Storage - Firm Fixed Price (3600)

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

0012 10,000 Dollars, Transportation - Firm Fixed Price (3600)

Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2010 through 20 February 2011 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1001 UNDEFINED

OPTION Labor - Firm Fixed Price (3400)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1002 UNDEFINED

OPTION Labor - FFP Level of Effort (3400)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1003 UNDEFINED

OPTION Travel - Firm Fixed Price (3400)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1004 UNDEFINED

OPTION Material - Firm Fixed Price (3400)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1005 UNDEFINED

OPTION Storage - Firm Fixed Price (3400)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1006 UNDEFINED

OPTION Transportation - Firm Fixed Price (3400)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1007 UNDEFINED

OPTION Labor - Firm Fixed Price (3600)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1008 UNDEFINED

OPTION Labor - FFP Level of Effort (3600)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1009 UNDEFINED

OPTION Travel - Firm Fixed Price (3600)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1010 UNDEFINED

OPTION Material - Firm Fixed Price (3600)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1011 UNDEFINED

OPTION Storage - Firm Fixed Price (3600)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

1012 UNDEFINED

OPTION Transportation - Firm Fixed Price (3600)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2011 through 20 February 2012 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2001 UNDEFINED

OPTION Labor - Firm Fixed Price (3400)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2002 UNDEFINED

OPTION Labor - FFP Level of Effort (3400)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2003 UNDEFINED

OPTION Travel - Firm Fixed Price (3400)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2004 UNDEFINED

OPTION Material - Firm Fixed Price (3400)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2005 UNDEFINED

OPTION Storage - Firm Fixed Price (3400)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2006 UNDEFINED

OPTION Transportation - Firm Fixed Price (3400)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2007 UNDEFINED

OPTION Labor - Firm Fixed Price (3600)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2008 UNDEFINED

OPTION Labor - FFP Level of Effort (3600)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2009 UNDEFINED

OPTION Travel - Firm Fixed Price (3600)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2010 UNDEFINED

OPTION Material - Firm Fixed Price (3600)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2011 UNDEFINED

OPTION Storage - Firm Fixed Price (3600)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

2012 UNDEFINED

OPTION Transportation - Firm Fixed Price (3600)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2012 through 20 February 2013 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3001 UNDEFINED

OPTION Labor - Firm Fixed Price (3400)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3002 UNDEFINED

OPTION Labor - FFP Level of Effort (3400)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3003 UNDEFINED

OPTION Travel - Firm Fixed Price (3400)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3004 UNDEFINED

OPTION Material - Firm Fixed Price (3400)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3005 UNDEFINED

OPTION Storage - Firm Fixed Price (3400)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3006 UNDEFINED

OPTION Transportation - Firm Fixed Price (3400)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3007 UNDEFINED

OPTION Labor - Firm Fixed Price (3600)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3008 UNDEFINED

OPTION Labor - FFP Level of Effort (3600)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures SOO (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3009 UNDEFINED

OPTION Travel - Firm Fixed Price (3600)

FFP

Government required travel in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on travel.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3010 UNDEFINED

OPTION Material - Firm Fixed Price (3600)

FFP

Government required material in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOO. No burden(s) or fee will be paid on material.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3011 UNDEFINED

OPTION Storage - Firm Fixed Price (3600)

FFP

Government required storage in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on storage.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

3012 UNDEFINED

OPTION Transportation - Firm Fixed Price (3600)

FFP

Government required transportation in support of the CAStLE Aging Structures effort IAW the SOO (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOO. No burden(s) or fee will be paid on transportation.

Partial paymemts authorized and required.

Ordering Period:: 21 February 2013 through 20 February 2014 Performance of task order may continue until completion of the effort.

Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

4001 UNDEFINED

OPTION Labor - Firm Fixed Price (3400)

FFP

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.

Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).

Ordering Period:: 21 February 2014 through 20 February 2015 Performance of task order may continue until completion of the effort.

Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.

UNIT UNIT PRICE MAX AMOUNT

4002 UNDEFINED

OPTION Labor - FFP Level of Effort (3400)

FFP-LOE

The contractor shall provide support IAW the CAStLE Aging Structures Statement of Objectives (SOO) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .