FA7000-09-R-0059 Amend 2_16Oct09.pdf
PDF 11 MB Posted
- Solicitation number
- FA7000-09-R-0059
About this file
FA7000-09-R-0059 Amendment 2 Dated 16Oct2009
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 18 Nov 2009
X
A X B
C D
EX
X G F 123 - 128
129 - 135 X H 136 richard.harper@usafa.af.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 136
(If other than Item 7) FA7000
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA7000 8. ADDRESS OFFER TO
9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and not applicable conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
RICHARD HARPER 719-333-3927
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 81
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
82 - 84
85 - 90 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 91 - 92 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 93 - 94 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
95 - 121
PART II - CONTRACT CLAUSES
10 CONS - FA7000
ATTN: RICHARD HARPER
8110 INDUSTRIAL DRIVE, STE 200
USAF ACADEMY CO 80840
10 CONS - FA7000
ATTN: SHAWNA BOWSHOT
8110 INDUSTRIAL DRIVE, STE 200
USAFA CO 80840719-333-3927
719-333-6608FAX:
TEL:
719-333-9103FAX:
TEL: 719-333-4060
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
29 Sep 2009
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA7000-09-R-0059
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 30,000,000 Dollars, U.S.
Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. At the end of this base period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
FOB: Destination
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 17,000,000 Dollars, Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. At the end of this base period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
MAX NET AMT
CEILING PRICE
UNIT UNIT PRICE MAX AMOUNT
0003 1,750,000 Dollars, Travel - Firm Fixed Price (3400)
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0004 2,000,000 Dollars, Material - Firm Fixed Price (3400)
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0005 3,000,000 Dollars, Storage - Firm Fixed Price (3400)
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0006 3,000,000 Dollars, Transportation - Firm Fixed Price (3400)
Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0007 8,000,000 Dollars, Labor - Firm Fixed Price (3600)
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. At the end of this base period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0008 18,000,000 Dollars, Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. At the end of this base period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0009 730,000 Dollars, Travel - Firm Fixed Price (3600)
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0010 1,500,000 Dollars, Material - Firm Fixed Price (3600)
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0011 10,000 Dollars, Storage - Firm Fixed Price (3600)
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0012 10,000 Dollars, Transportation - Firm Fixed Price (3600)
Government required transportatoin in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. At the end of this base period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0013 250,000 Dollars, Travel - Cost Reimbursable (3400)
COST
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
MAX COST
UNIT UNIT PRICE MAX AMOUNT
0014 250,000 Dollars, Travel - Cost Reimbursable (3600)
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0015 3,000,000 Dollars, Material - Cost Reimbursable (3400)
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
0016 1,500,000 Dollars, Material - Cost Reimbursable (3600)
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2010 through 20 February 2011 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1003 UNDEFINED
OPTION Travel - Firm Fixed Price (3400)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1004 UNDEFINED
OPTION Material - Firm Fixed Price (3400)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1005 UNDEFINED
OPTION Storage - Firm Fixed Price (3400)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1006 UNDEFINED
OPTION Transportation - Firm Fixed Price (3400)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1007 UNDEFINED
OPTION Labor - Firm Fixed Price (3600)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1008 UNDEFINED
OPTION Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1009 UNDEFINED
OPTION Travel - Firm Fixed Price (3600)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1010 UNDEFINED
OPTION Material - Firm Fixed Price (3600)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1011 UNDEFINED
OPTION Storage - Firm Fixed Price (3600)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1012 UNDEFINED
OPTION Transportation - Firm Fixed Price (3600)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1013 UNDEFINED
OPTION Travel - Cost Reimbursable (3400)
COST
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1014 UNDEFINED
OPTION Travel - Cost Reimbursable (3600)
COST
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1015 UNDEFINED
OPTION Material - Cost Reimbursable (3400)
COST
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
1016 UNDEFINED
OPTION Material - Cost Reimbursable (3600)
COST
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2011 through 20 February 2012 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. At the end of this base period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED
OPTION Labor - Firm Fixed Price (3400)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3400) labor CLINs including base and option periods is $30,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $30,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2002 UNDEFINED
OPTION Labor - FFP Level of Effort (3400)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3400) labor CLINs including base and option periods is $17,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $17,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2003 UNDEFINED
OPTION Travel - Firm Fixed Price (3400)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2004 UNDEFINED
OPTION Material - Firm Fixed Price (3400)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2005 UNDEFINED
OPTION Storage - Firm Fixed Price (3400)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2006 UNDEFINED
OPTION Transportation - Firm Fixed Price (3400)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3400) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2007 UNDEFINED
OPTION Labor - Firm Fixed Price (3600)
FFP
The contractor shall provide support IAW the CAStLE Aging Structures Statement of Work (SOW) (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order.
Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP (3600) labor CLINs including base and option periods is $8,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $8,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2008 UNDEFINED
OPTION Labor - FFP Level of Effort (3600)
FFP-LOE
The contractor shall provide support IAW the CAStLE Aging Structures SOW (Attachment 1). Individual task orders will be issued for each project and will specifically identify the applicable labor category/categories and quantity of labor hours to be ordered under a given order. Maximum labor category pricing for all labor categories is as listed in the Labor Rate Table (Attachment 2).
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The Labor CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for FFP LOE (3600) labor CLINs including base and option periods is $18,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $18,000,000.00 will be established as the NTE amount of subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2009 UNDEFINED
OPTION Travel - Firm Fixed Price (3600)
FFP
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2010 UNDEFINED
OPTION Material - Firm Fixed Price (3600)
FFP
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for material (3600) CLINs including base and option periods is $3,000,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $3,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2011 UNDEFINED
OPTION Storage - Firm Fixed Price (3600)
FFP
Government required storage in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on storage.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The storage CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for storage (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2012 UNDEFINED
OPTION Transportation - Firm Fixed Price (3600)
FFP
Government required transportation in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and reimbursement will be made IAW the SOW. No burden(s) or fee will be paid on transportation.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The transportation CLIN amounts are for estimating purposes only. Not to exceed amount will be established at the time the option is exercised. The total NTE value for this contract for transportation (3600) CLINs including base and option periods is $10,000.00. Value for this CLIN will be carried over from the balance of prior year labor CLINs of this contract. At the end of this option period, the remaining balance of the $10,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2013 UNDEFINED
OPTION Travel - Cost Reimbursable (3400)
COST
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3400) CLINs including base and option periods is $2,000,000.00. At the end of this base period, the remaining balance of the $2,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2014 UNDEFINED
OPTION Travel - Cost Reimbursable (3600)
COST
Government required travel in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on travel.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The travel CLIN amounts are for estimating purposes only. The total NTE value for this contract for travel (3600) CLINs including base and option periods is $980,000.00. At the end of this base period, the remaining balance of the $980,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2015 UNDEFINED
OPTION Material - Cost Reimbursable (3400)
COST
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3400) CLINs including base and option periods is $5,000,000.00. At the end of this base period, the remaining balance of the $5,000,000.00 will be established as the NTE amount of the subsequent option periods.
UNIT UNIT PRICE MAX AMOUNT
2016 UNDEFINED
OPTION Material - Cost Reimbursable (3600)
COST
Government required material in support of the CAStLE Aging Structures effort IAW the SOW (Attachment 1). Funding will be included, if necessary, in the task orders and payment will be made IAW the SOW. No burden(s) or fee will be paid on material.
Partial paymemts authorized and required.
Ordering Period: 21 February 2012 through 20 February 2013 Performance of individual task orders shall continue until completion of the effort.
Note: The material CLIN amounts are for estimating purposes only. The total NTE value for this contract for material (3600) CLINs…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .