This document outlines requirements for a Simplified Acquisition of Base Engineering Requirements contract at Al Udeid Air Base in Qatar. The SABER contract will provide non-complex construction projects under $1 million and may include projects up to $2 million in the future. Work includes utilities, pavements, structural design, environmental abatement, power generation, specialized systems, and earthwork. A site visit is scheduled for July 19, 2018 with RSVPs due by July 17. Proposals will be evaluated using the tradeoff process and awarded as firm-fixed price IDIQ contracts for a five year term with a $50 million maximum value and $5,000 minimum guarantee. Individual task orders will be awarded as firm-fixed price contracts using RS Means pricing with a contractor coefficient. Liquidated damages will be identified for each task order. The Department of the Air Force Central Command is the contracting agency.

Seed Project 2 SOO - Install Bird Netting

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

ALUA 17-0093 INSTALL BIRD CONTROL AT B3729, B3976, B3979, B3993, and

B6671 SUNSHADES

CP # XXXXX

CONTRACT NO.

May 15, 2018

GENERAL: Provide all supervision, plant labor, transportation, equipment, and materials and perform all necessary engineering and operations to accomplish the following:

Objectives:

• Design and install a bird control system using a combination of metal mesh netting and spike strips in order to discourage avian roosting at the designated facilities.

• B3729: install bird control system underneath overhangs on east and west side of facility:

o Approximately 4.0M by 24.5M per side o See Figure 1

• B3976: install bird control system underneath metal sunshade:

o Approximately 15M by 14M o See Figure 2

• B3979: install bird control system underneath metal sunshade:

o “L” shaped o Approximately 918 SM o See Figure 2

• B3993: install bird control system underneath metal sunshade:

o Approximately 34M by 25M o See Figure 2

• B6671 Sunshade: install bird control system underneath metal sunshade over parking lot:

o Approximately 55M by 8M o See Figures 2 and 3

• The primary emphasis shall be on metal bird netting – spike strips shall only be used where metal netting is not reasonably practicable.

• The metal netting shall not cover, prevent access to, or interfere with the function of any existing lights, ballasts, or mass notification systems.

• Repair, repaint, or otherwise seal to protect in a suitable manner any damage to existing structure during the installation of bird control devices.

• The period of performance shall be 90 days.

The installing contractor will be required to meet all Al Udeid Air Base specifications for safety, installation and site requirements on Al Udeid Air Base, Qatar.

The contractor shall also comply with all guidelines provided in Applicable Codes, Regulations and Standards from the current SABER Base Contract.

FA5702-18-R-0016 Attachment 7

STATEMENT OF OBJECTIVES

ALUA 17-0093 INSTALL BIRD CONTROL AT B3729, B3976, B3979, B3993, and

B6671 SUNSHADES

CP # XXXXX

CONTRACT NO.

May 15, 2018

REQUIRED SUBMITTALS:

1. Bird Control Material

2. Fastening Hardware

3. Site Layout

4. Progress Schedule

5. As-Built Drawings

6. Construction Schedule

7. AF Form 3064

8. AF form 3065

9. O&M Manuals