4._Seed_Project_1_Description.pdf
PDF 627 KB Posted
- Attached to
- Al Udeid Air Base (AUAB) SABER
- Solicitation number
- FA5702-18-R-0016
About this file
This document provides details for a federal construction contract opportunity at Al Udeid Air Base in Qatar. The United States Air Force is seeking a contractor through its Simplified Acquisition of Base Engineering Requirements indefinite delivery/indefinite quantity contract to complete various non-complex construction projects under $1 million individually at the base. Eligible work includes utilities, pavements, structural design, environmental abatement, and other facility maintenance, repair and construction. A pre-proposal site visit is scheduled for July 19, 2018, with interested parties required to RSVP by July 17. Proposals are due based on the Federal Acquisition Regulation Subpart 15.101-1 tradeoff process. The anticipated single-award contract has a maximum value of $50 million over five years consisting of individual firm-fixed price task orders. Task order proposals will be requested from the contractor and awarded based on regional adjustments to the RS Means Unit Price book. Work will be solely located at Al Udeid Air Base, Qatar under this opportunity.
Seed Project 1 description
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 7, 2018
SABER
ALUA 14‐0031 Repair CC Pool
Location: CC Pool
Project Manager: 2d Lt Taegyung Lee
(1) Project Inspector: Mr. Matthew Richard
(2) Using Activity/Organization: Electrical & Plumbing Infrastructure/Structural/Multi.
Scope of Work: For all details and requirements see the full SOW. Convert the chlorination system to a salt water system for a 250K gallon pool, this involves replacing all plumbing for the system, repairing or replacing the water heating and cooling chillers, and rewiring the electrical and bringing it up to NEPA code. Testing the system to ensure that it is working properly before commissioning. Completely replace the roof of the pump house. Additionally, repair the return that has an identified leak. Overall, this project will eliminate existing code violations and upgrading the entire system. Demolition of the west wall and installation of a double door entry gate will be installed to allow proper transportation of material into the pool area. This project will comply with applicable DoD Air Force and base design standards.
Phasing Requirements: N/A
Special Requirements/Security/Submittals: See Form 66 for submittals, dig permit required, and
Force Protection (FP) escorts will be required. The proposal must include the estimated number of contract employees working each day.
Applicable Codes and Standards: All UFC/AFI/NEPA must be complied with.
Proposed Period of Performance: 240 days
Work Hours: 0700‐1700
FA5702-18-R-0016 Attachment 4 Page 1 of 1
File details come from the government source that posted it. Updated .