6._Seed_Project_1_Form_66.xls

XLS spreadsheet 299 KB Posted

Attached to
Al Udeid Air Base (AUAB) SABER
Solicitation number
FA5702-18-R-0016
Issued by

About this file

This document contains a federal solicitation for a Simplified Acquisition of Base Engineering Requirements (SABER) contract to provide construction projects at Al Udeid Air Base in Qatar. The Air Force seeks a single Indefinite Delivery/Indefinite Quantity contract for a five-year period with a maximum value of $50 million and minimum value of $5,000. The SABER contract will require standard construction, real property maintenance, and repair work including utilities, pavements, structures, environmental abatement, power and heating, specialized systems, and earthwork. Prime contractors and subcontractors must register in the Joint Contingency Contracting System and have necessary licenses to operate in Qatar. Proposals will be evaluated using the tradeoff process, with no set-aside requirements. The solicitation is available electronically and requires registration for subcontracting opportunities updates. A site visit will be held on July 19, and proposals are due by the date specified in the amended solicitation posted to FBO.gov. Task orders will be awarded as firm-fixed price contracts using RS Means pricing with an adjustment coefficient.

Seed Project 1 Form 66

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Submittal 1

FA5702-18-R-0016 Attachment 6 Page 1 of 1
SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
ALUA-14-0031Repair CC Pool
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERNote: 3 copies required per submittalCERTIF. OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDrawingsReportTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
Project Specific Form 66XNTP + 3
Construction ScheduleXRFPContractor must propose a detailed construction schedule incorporating all phases of construction including but not limited to design, client review, procurement, erection/installation, certification and final punchlist and client accepting.
Staff CV's (Resume) Experience & QualificationsXNTP + 7
TCN Schedule (electronic required, hard copy optional)XNTP + 7
Contractor's Health, Safety, and Environment PlanXRFP
Contractor's QA/QC PlanXRFP
Copy of Engineering License(s) of person or consultancy responsible for designX95% DesignProvide certified translation if not in English.
DESIGN (65%)
All submissions to be provided in accordance to Task Order and PARENT SOW. 65%, 95%, and 100% Design Drawings to include:
65% DesignXXXNTP +7Locate all utilities, benchmarks, manholes, adjacent buildings, and pavement. Include Specifications
95% DesignXXXNTP +21Include Specifications
CIVIL
Select Fill SampleXXNTP + 7
Select Fill Sieve AnalysisXXNTP + 7
Select Fill Chemical AnalysisXXNTP + 7
Class A Backill SampleXXNTP + 7
Class A Backill Sieve AnalysisXXNTP + 7
Class A Backill Chemical AnalysisXXNTP + 7
Soil sampling, Excavation Calculations, Backfilling Calculations for Utilities & FacilitiesXXNTP + 7
Soil Compaction Test ResultsXXNTP + 7Compaction test to be performed per lift, not exceeding 150mm, by the Nuclear Gauge Method. Provide a copy of the equipment's calibration test results at the time of testing.
STRUCTURAL
Foundation Concrete Mix DesignXXXNTP + 7Only if needed
Miscellaneous Concrete Mix DesignXXXNTP + 7
Cement Type & Chemical Analysis, ConcreteXXNTP + 7
Aggregate Sieve Analysis, ConcreteXXTest + 7
Aggregate Chemical Analysis, ConcreteXXTest + 7
Concrete Foundation Structural CalculationsXNTP + 7
Structural Conc. Formwork & Reinf. MaterialsXXXXXXXNTP + 7
Steel Reinforcement Certifications (Steel Rebar)XXNTP + 7
Curing Compounds, Plasticizers, Joint SealantsXXXXNTP + 7
Slump Test results & Concrete Truck tickets (per truck)XTest + 3
7-Day Concrete Compressive Strength TestXXTest + 10
28-Day Concrete Compressive Strength TestXXTest + 30
Miscellaneous Metals. Contractor shall supply Manufacturer's Mill Certificates & Test ResultsXXXNTP + 7To include clamps, thimbles, turnbuckles and threaded rods.
Double GateXXXNTP + 7
Roof submittalXXXXXXXXNTP + 7
Tile for PoolXXNTP + 7
GroutXXXXXNTP + 7
COMMUNICATIONS / ELECTRICAL
Conduit, PVC Schdule 80XXXNTP + 7
Electrical PanelNTP + 7
Light bulbs for pool lightsXXNTP + 7
HVAC
Assessment of existing heatingin and cooling system with plan for repairing/replacing systemXXXX
PLUMBING
Piping DiagramNTP + 7
Pump SubmittalNTP + 7
CLOSEOUT
O&M maint data and maint manuals & Manufacturer's Warranty for Communications EquipmentXXXXInstall + 4
Factory and Field Test Certificates, Logs and Test ResultsXBefore Acceptance
As Builts (electronic in AutoCAD 2005 and hard copies)XFinal + 7

&LFA5702-18-R-0016&CPage &P of &N&RAttachment 6 &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &LFA5702-18-R-0016&CPage &P of &N&RAttachment 6 &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used

Sheet2

File details come from the government source that posted it. Updated .