6._Seed_Project_1_Form_66.xls
XLS spreadsheet 299 KB Posted
- Attached to
- Al Udeid Air Base (AUAB) SABER
- Solicitation number
- FA5702-18-R-0016
About this file
This document contains a federal solicitation for a Simplified Acquisition of Base Engineering Requirements (SABER) contract to provide construction projects at Al Udeid Air Base in Qatar. The Air Force seeks a single Indefinite Delivery/Indefinite Quantity contract for a five-year period with a maximum value of $50 million and minimum value of $5,000. The SABER contract will require standard construction, real property maintenance, and repair work including utilities, pavements, structures, environmental abatement, power and heating, specialized systems, and earthwork. Prime contractors and subcontractors must register in the Joint Contingency Contracting System and have necessary licenses to operate in Qatar. Proposals will be evaluated using the tradeoff process, with no set-aside requirements. The solicitation is available electronically and requires registration for subcontracting opportunities updates. A site visit will be held on July 19, and proposals are due by the date specified in the amended solicitation posted to FBO.gov. Task orders will be awarded as firm-fixed price contracts using RS Means pricing with an adjustment coefficient.
Seed Project 1 Form 66
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Submittal 1
| FA5702-18-R-0016 Attachment 6 Page 1 of 1 | ||||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| ALUA-14-0031 | Repair CC Pool | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | Note: 3 copies required per submittal | CERTIF. OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | Drawings | Report | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS |
| GENERAL | ||||||||||||||||||||||
| Project Specific Form 66 | X | NTP + 3 | ||||||||||||||||||||
| Construction Schedule | X | RFP | Contractor must propose a detailed construction schedule incorporating all phases of construction including but not limited to design, client review, procurement, erection/installation, certification and final punchlist and client accepting. | |||||||||||||||||||
| Staff CV's (Resume) Experience & Qualifications | X | NTP + 7 | ||||||||||||||||||||
| TCN Schedule (electronic required, hard copy optional) | X | NTP + 7 | ||||||||||||||||||||
| Contractor's Health, Safety, and Environment Plan | X | RFP | ||||||||||||||||||||
| Contractor's QA/QC Plan | X | RFP | ||||||||||||||||||||
| Copy of Engineering License(s) of person or consultancy responsible for design | X | 95% Design | Provide certified translation if not in English. | |||||||||||||||||||
| DESIGN (65%) | ||||||||||||||||||||||
| All submissions to be provided in accordance to Task Order and PARENT SOW. 65%, 95%, and 100% Design Drawings to include: | ||||||||||||||||||||||
| 65% Design | X | X | X | NTP +7 | Locate all utilities, benchmarks, manholes, adjacent buildings, and pavement. Include Specifications | |||||||||||||||||
| 95% Design | X | X | X | NTP +21 | Include Specifications | |||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| Select Fill Sample | X | X | NTP + 7 | |||||||||||||||||||
| Select Fill Sieve Analysis | X | X | NTP + 7 | |||||||||||||||||||
| Select Fill Chemical Analysis | X | X | NTP + 7 | |||||||||||||||||||
| Class A Backill Sample | X | X | NTP + 7 | |||||||||||||||||||
| Class A Backill Sieve Analysis | X | X | NTP + 7 | |||||||||||||||||||
| Class A Backill Chemical Analysis | X | X | NTP + 7 | |||||||||||||||||||
| Soil sampling, Excavation Calculations, Backfilling Calculations for Utilities & Facilities | X | X | NTP + 7 | |||||||||||||||||||
| Soil Compaction Test Results | X | X | NTP + 7 | Compaction test to be performed per lift, not exceeding 150mm, by the Nuclear Gauge Method. Provide a copy of the equipment's calibration test results at the time of testing. | ||||||||||||||||||
| STRUCTURAL | ||||||||||||||||||||||
| Foundation Concrete Mix Design | X | X | X | NTP + 7 | Only if needed | |||||||||||||||||
| Miscellaneous Concrete Mix Design | X | X | X | NTP + 7 | ||||||||||||||||||
| Cement Type & Chemical Analysis, Concrete | X | X | NTP + 7 | |||||||||||||||||||
| Aggregate Sieve Analysis, Concrete | X | X | Test + 7 | |||||||||||||||||||
| Aggregate Chemical Analysis, Concrete | X | X | Test + 7 | |||||||||||||||||||
| Concrete Foundation Structural Calculations | X | NTP + 7 | ||||||||||||||||||||
| Structural Conc. Formwork & Reinf. Materials | X | X | X | X | X | X | X | NTP + 7 | ||||||||||||||
| Steel Reinforcement Certifications (Steel Rebar) | X | X | NTP + 7 | |||||||||||||||||||
| Curing Compounds, Plasticizers, Joint Sealants | X | X | X | X | NTP + 7 | |||||||||||||||||
| Slump Test results & Concrete Truck tickets (per truck) | X | Test + 3 | ||||||||||||||||||||
| 7-Day Concrete Compressive Strength Test | X | X | Test + 10 | |||||||||||||||||||
| 28-Day Concrete Compressive Strength Test | X | X | Test + 30 | |||||||||||||||||||
| Miscellaneous Metals. Contractor shall supply Manufacturer's Mill Certificates & Test Results | X | X | X | NTP + 7 | To include clamps, thimbles, turnbuckles and threaded rods. | |||||||||||||||||
| Double Gate | X | X | X | NTP + 7 | ||||||||||||||||||
| Roof submittal | X | X | X | X | X | X | X | X | NTP + 7 | |||||||||||||
| Tile for Pool | X | X | NTP + 7 | |||||||||||||||||||
| Grout | X | X | X | X | X | NTP + 7 | ||||||||||||||||
| COMMUNICATIONS / ELECTRICAL | ||||||||||||||||||||||
| Conduit, PVC Schdule 80 | X | X | X | NTP + 7 | ||||||||||||||||||
| Electrical Panel | NTP + 7 | |||||||||||||||||||||
| Light bulbs for pool lights | X | X | NTP + 7 | |||||||||||||||||||
| HVAC | ||||||||||||||||||||||
| Assessment of existing heatingin and cooling system with plan for repairing/replacing system | X | X | X | X | ||||||||||||||||||
| PLUMBING | ||||||||||||||||||||||
| Piping Diagram | NTP + 7 | |||||||||||||||||||||
| Pump Submittal | NTP + 7 | |||||||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| O&M maint data and maint manuals & Manufacturer's Warranty for Communications Equipment | X | X | X | X | Install + 4 | |||||||||||||||||
| Factory and Field Test Certificates, Logs and Test Results | X | Before Acceptance | ||||||||||||||||||||
| As Builts (electronic in AutoCAD 2005 and hard copies) | X | Final + 7 |
&LFA5702-18-R-0016&CPage &P of &N&RAttachment 6 &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &LFA5702-18-R-0016&CPage &P of &N&RAttachment 6 &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used &L&"Arial,Bold"&6AF FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used