This document package includes construction drawings and specifications for repair work at Al Udeid Air Base in Qatar, along with a related federal contract opportunity notice.

The construction drawings detail demolition and new installation plans for repair of the base's CC pool pump house. Work includes dismantling existing filtration and water treatment equipment, saw cutting piping, removing chlorine storage units and doors, installing a new saline chlorination system, electrical components, piping and valves, HVAC equipment, doors, lighting, and ceilings.

The federal contract opportunity is a Simplified Acquisition of Base Engineering Requirements indefinite delivery/indefinite quantity contract seeking construction services for non-complex projects up to $1 million at Al Udeid Air Base. The maximum contract value is $50 million over five years. Task orders will be awarded on a firm-fixed price basis. Interested parties must register in the Joint Contingency Contracting System and have necessary business licenses to perform work in Qatar. Proposals are due by the response date specified in the solicitation, which is available on FBO.gov along with any amendments.

Seed Project 1 Combined Drawings

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

V

D E

S C

R I P

T I O

N D

A T

E

DWG

SHEET

I S

S U

D

F

O R

A L

U

D E

I

A

B

S

E

E

C E

S

C

E P

A U

Q

T

A R

P

A

C

P

O O

L

C O

V E

R

S

H E

E T

I N

D E

X

O

F

D

R A

W I N

G S

A N

D

K

Y

P

L A

N

G-0.0

R E

V I E

W

L S

S

M J M

E

C E

S

E

C E

S

S

N

T

E D

M

G E

N E

R A

L

IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT

SCALE

0 5 10 20

1/8" = 1'-0"SCALE

0 5 10 20

1/16" = 1'-0"

SCALE

0 8 12

1/4" = 1'-0" SCALE

1/2" = 1'-0"

2 4

SCALE

3/4" = 1'-0"

1 2 421 3 6

SCALE

1" = 1'-0"

1 2 3

SCALE

11/2" = 1'-0"

1 2

SCALE

3" = 1'-0"

W

I

N

G

I

T

I

O

N

A

R

Y

A

I

R t h

E

X

P

E

D

REPAIR CC POOL

AL UDEID AIR BASE, QATAR

KEY PLAN

NOT TO SCALE

N

PROJECT LOCATION

NOT FOR CONSTRUCTION

PROJECT NO. 14-0031

SUBMITTED FOR: REVIEW

DATE SUBMITTED: 07 MAR 2018

DEPARTMENT OF THE AIR FORCE

379th AIR EXPEDITIONARY WING

EXPEDITIONARY CIVIL ENGINEER SQUADRON

W

I

N

G

I

T

I

O

N

A

R

Y

A

I

R t h

E

X

P

E

D

INDEX OF DRAWINGS

DWG NO. REV NO. DESCRIPTION

GENERAL

G-0.0 00

COVER SHEET, INDEX OF DRAWINGS AND KEY PLAN

ARCHITECTURAL

A-1.0 00 DEMOLITION PLAN

A-2.0 00 NEW INSTALLATION PLAN AND REFLECTED CEILING PLAN

A-2.0 00 REFLECTED CEILING PLAN

THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.

FA5702-18-R-0016 Attachment 5 Page 1 of 3

2"Ø MASSAGE TWO (2) RETURN

2 1/2"Ø TO AIR JETS

JACUZZI

BALANCE

FV

CHLORINE

STORAGE

CHLORINE

STORAGE

2 1/2" Ø VACUUM LINE

5 1/2" Ø MAIN DRAIN LINE

5 1/2" BALANCE TANK SUCTION

24" X 24" MANHOLE COVER

CONDENSATE LINE

CALOREX MODEL AW 7034 BHC

HEAT/COOL PUMP 3

CALOREX MODEL AW 7034 BHC

HEAT/COOL PUMP 2

63A TPN ISOLATER

TYPICAL THREE (3)

PLACES

CALOREX MODEL AW 7034 BHC

HEAT/COOL PUMP 1

5 1/2" Ø FLOOR INLET LINE

TANK

120V/240V SINGLE

PHASE PANEL

3 NOS. 5.5 HP CIRULATING PUMP

2 NOS. DUTY AND ONE (1) STANDBY

CONTROL PANEL

DISTRIBUTION BOARD

16 NOS. TRANSFORMER

POOL LIGHTS

2 NOS. 1800mm SAND FILTERS

CH/BROMINE FEEDAR

2"Ø MASSAGE ONE (1) RETURN

2 1/2"Ø THERAPY SUCTION

2"Ø VACUUM

2"Ø MAIN DRAIN

2"Ø INLET

2 1/2"Ø THERAPY SUCTION

CHLORINE

STORAGE

12KW SPA HEATER

36"Ø SAND FILTER

BACK WASH TO NEAREST MANHOLE

CHLORINE DOSING PUMP UNIT

PH DOSING PUMP UNIT

3/4 H.P. FILTRATION PUMP

2 H.P. MASSAGE PUMP 1

2 H.P. MASSAGE PUMP 2

AIR MASSAGE AIR BLOWER

HVAC

HVAC

1A

1B 1C

1B

1E

1D

REMOVE EXISTING GATE AND

EXTENT OF WALL AS NOTED

SHEET KEYNOTES

1. CONTRACTOR SHALL DISMANTLE THE EXISTING PUMP ROOM FILTRATION

AND WATER TREATMENT COMPONENTS.

A. TWO (2) 1800mm DIAMETER PRAGA FILTERS MODEL 00691 BY M/s

ASTRAL-SPAIN, COMPLETE FILTER MEDIA - SILICA SAND AND HEADER VALVE

SYSTEM.

B. THREE (3) 5.5 HP (TWO (2) DUTY AND ONE (1) STANDBY) FILTRATION PUMPS

MODEL 08005 BY M/s, ASTRAL-SPAIN.

C. PH DOSING PUMP, CHORINE DOSING PUMP INCLUDING CHEMICAL SENSERS

AND TANKS.

D. AIR MASSAGE AIR BLOWER, 2 H.P. MASSAGE PUMP 2, 2 H.P. MASSAGE PUMP 1,

AND H.P. FILTRATION PUMP.

E. SAND FILTER AND 12KW SPA HEATER.

2. CONTRACTOR SHALL SAW CUT PIPING A MINIMUM OF 12" ABOVE FLOOR.

3. REMOVE THREE (3) CHLORINE STORAGE UNITS AND RAMPS.

4. REMOVE DOUBLE DOORS.

5. REMOVE BOTH HVAC SYSTEM.

6. REMOVE EXISTING CEILING GRID AND CEILING TILES.

7. CONTRACTOR SHALL REMOVE THE THREE (3) EXISTING LIGHT FIXTURES.

LEGEND

DEMOLITION

GENERAL ELECTRICAL NOTES

1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND SHOW APPROXIMATE

LOCATIONS OF WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD

VERIFY EXISTING CONDITIONS AND ADJUST EQUIPMENT LOCATIONS TO FIT

THE EXISTING CONDITIONS.

2. INSTALL ALL ELECTRICAL SYSTEMS IN ACCORDANCE WITH THE LATEST NEC,

IECC, UPC AND STANDARDS.

3. ALL WORK SHALL BE COORDINATED WITH SUBCONTRACTORS AND OTHER

TRADES, TO INCLUDE MECHANICAL AND PLUMBING TO MINIMIZE CONFLICTS

WITH OVERHEAD ROUTING, STRUT SUPPORTS, ETC.

4. ALL NEW EQUIPMENT AND MATERIAL TO BE INSTALLED AS PART OF

RENOVATION OR NEW CONSTRUCTION SHALL BEAR AN UNDERWRITERS

LABORATORIES LABEL (UL) (OR CE), AND INSTALLED IN SUCH A MANNER FOR

WHICH THEY ARE DESIGNED AND APPROVED.

5. CONTRACTOR SHALL DOCUMENT AND SUBMIT TO THE CONTRACTING

OFFICER ANY MAJOR DEVIATIONS FROM THE DESIGN DOCUMENTS, AND

ATTAIN APPROVAL BEFORE CONSTRUCTION.

GENERAL NOTES

1. TURN OFF AND DISCONNECT POWER AT SOURCE FOR ALL PUMPS AND

OTHER EQUIPMENT.

2. REMOVE AND CORRECTLY DISPOSE OF POWER AND CONTROL CABLES FOR

ALL EQUIPMENT IN PUMP HOUSE.

R E

V

D E

S C

R I P

T I O

N D

A T

E

W

I

N

G

I

T

I

O

N

A

R

Y

A

I

R t h

E

X

P

E

D

DWG

SHEET

I S

S U

R

U

E

S

E

E

C E

S

C

E P

A U

T

A R

P

A

P

O O

L

P

U M

P

H

O U

S E

D E

M O

L I T

I O

N

P

L A

N

A-1.0

R E

V I E

W

L S

S

M J M

E

C E

S

E

C E

S

T

E D

M

A R

C H

I T

E C

T U

R E

IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT

SCALE

0 5 10 20

1/8" = 1'-0"SCALE

0 5 10 20

1/16" = 1'-0"

SCALE

0 8 12

1/4" = 1'-0" SCALE

1/2" = 1'-0"

2 4

SCALE

3/4" = 1'-0"

1 2 421 3 6

SCALE

1" = 1'-0"

1 2 3

SCALE

11/2" = 1'-0"

1 2

SCALE

3" = 1'-0"

THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.

DEMOLITION PLAN

A-1.0

0 4' 8' 12'

Scale: 3/16" = 1'-0"

FA5702-18-R-0016 Attachment 5 Page 2 of 3

JACUZZI

HVAC HVAC

1 2

3 4

7 7

(2) 6'-0" BY HEIGHT OF WALL WELDED

WIRE FABRIC GATES.

SHEET KEYNOTES

1. CONTRACTOR SHALL SUPPLY AND INSTALLED NEW SALINE CHLORINATION

SYSTEM.

2. CONTRACTOR SHALL SUPPLY ALL ELECTRICAL COMPONENTS FOR EQUIPMENT.

3. CONTRACTOR SHALL SUPPLY ALL PIPING, VALVES AND FITTINGS FOR

EQUIPMENT. ADJUST AND INSTALL PIPE SUPPORTS.

4. PERFORM PIPE PRESSURE TESTING OF PIPING.

5. CONTRACTOR SHALL REPAIR HOLE IN WALL WHERE THROUGH WALL HVAC

WAS THAT.

6. CONTRACTOR SHALL INSTALL NEW HOLLOW METAL DOORS, FRAMES AND NEW

DOOR HARDWARE.

7. CONTRACTOR SHALL INSTALL TWO (2) 2 TON NEW SPLIT SYSTEM HAVC.

8. CONTRACTOR SHALL INSTALL NEW GRID CEILING AND NEW 24" X 24"

CEILING TILES. CEILING TILE SHALL BE WASHABLE, SOIL RESISTANT, MOLD

AND MILDEW RESISTANT.

9. CONTRACTOR SHALL INSTALL THREE (3) NEW 24" X 24" L.E.D. LIGHT FIXTURES.

GENERAL NOTES

1. PROVIDE AND INSTALL NEW XLPE POWER CABLE BETWEEN SOURCE AND

MAIN DISCONNECT SWITCH FOR NEW SALINE CHORINATION SYSTEM.

CABLE TO BE SIZED BASED ON SALINE CHORINATION SYSTEM

SPECIFICATIONS.

2. INSPECT NEW ELECTRICAL WORK FROM KEYNOTES 1, TEST AND TURN

ON. ELECTRICAL CONTRACTOR SHALL REPLACE ANY POWER AND CONTROL

CABLES NOT WORKING AFTER INSTALLATION. PROVIDE MEGGER TEST OF

NEW POWER AND CONTROL CABLES WITH ELECTRICAL INSPECTOR PRESENT

TO WITNESS IF REPLACEMENT IS NECESSARY.

2'X2' LED LIGHT FIXTURE

NEW WALLPACK ON PHOTOCELL (3)

2'X2' LAY-IN ACT AND SUSPENDED GRID

R E

V

D E

S C

R I P

T I O

N D

A T

E

W

I

N

G

I

T

I

O

N

A

R

Y

A

I

R t h

E

X

P

E

D

DWG

SHEET

I S

S U

R

U

E

S

E

E

C E

S

C

E P

A U

T

A R

P

A

P

O O

L

P

U M

P

H

O U

S E

N E

W

I N

S T

A L L A

T I O

N

P

L A

N

A-2.0

R E

V I E

W

L S

S

M J M

E

C E

S

E

C E

S

T

E D

M

A R

C H

I T

E C

T U

R E

IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT

SCALE

0 5 10 20

1/8" = 1'-0"SCALE

0 5 10 20

1/16" = 1'-0"

SCALE

0 8 12

1/4" = 1'-0" SCALE

1/2" = 1'-0"

2 4

SCALE

3/4" = 1'-0"

1 2 421 3 6

SCALE

1" = 1'-0"

1 2 3

SCALE

11/2" = 1'-0"

1 2

SCALE

3" = 1'-0"

THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.

REFLECTED CEILING PLAN

A-2.0

0 4' 8' 12'

Scale: 3/16" = 1'-0"

NEW INSTALLATION PLAN

A-2.0

0 4' 8' 12'

Scale: 3/16" = 1'-0"

FA5702-18-R-0016 Attachment 5 Page 3 of 3

File details come from the government source that posted it. Updated .