5._Seed_Project_1_Combined_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Al Udeid Air Base (AUAB) SABER
- Solicitation number
- FA5702-18-R-0016
About this file
This document package includes construction drawings and specifications for repair work at Al Udeid Air Base in Qatar, along with a related federal contract opportunity notice.
The construction drawings detail demolition and new installation plans for repair of the base's CC pool pump house. Work includes dismantling existing filtration and water treatment equipment, saw cutting piping, removing chlorine storage units and doors, installing a new saline chlorination system, electrical components, piping and valves, HVAC equipment, doors, lighting, and ceilings.
The federal contract opportunity is a Simplified Acquisition of Base Engineering Requirements indefinite delivery/indefinite quantity contract seeking construction services for non-complex projects up to $1 million at Al Udeid Air Base. The maximum contract value is $50 million over five years. Task orders will be awarded on a firm-fixed price basis. Interested parties must register in the Joint Contingency Contracting System and have necessary business licenses to perform work in Qatar. Proposals are due by the response date specified in the solicitation, which is available on FBO.gov along with any amendments.
Seed Project 1 Combined Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SABER_Q&A.pdf | ||
| Amendment_0001-_FA5702-18-R-0016.pdf | ||
| 3._Seed_Project_1_SOW_-_Repair_Swimming_Pool.pdf | ||
| 10._Seed_Project_2_Drawings_3.pdf | ||
| 7._Seed_Project_2_SOO_-_Install_Bird_Netting.pdf | ||
| 8._Seed_Project_2_Drawings_1.pdf | ||
| 11._AF_Form_3065_Progress_Report.pdf | ||
| 1._SABER_SOW_16_June.pdf | ||
| 16._Sample_Past_Performance_Consent_Letter.docx | DOCX document | |
| 12._AF_Form_3064_Progress_Sched.xlsx | XLSX spreadsheet | |
| 6._Seed_Project_1_Form_66.xls | XLS spreadsheet | |
| 14._AMRDEC_Instructions.pdf | ||
| FA5702-18-R-0021_SABER_Solicitation.pdf | ||
| 13._AF_Form_3000_Material_Approval_Submittal.pdf | ||
| 2._Combined_Technical_Evaluation_Form.docx | DOCX document | |
| 15._Past_Performance_Questionnaire.docx | DOCX document | |
| 9._Seed_Project_2_Drawings_2.pdf | ||
| 4._Seed_Project_1_Description.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E
V
D E
S C
R I P
T I O
N D
A T
E
DWG
SHEET
I S
S U
D
F
O R
A L
U
D E
I
A
B
S
E
E
C E
S
C
E P
A U
Q
T
A R
P
A
C
P
O O
L
C O
V E
R
S
H E
E T
I N
D E
X
O
F
D
R A
W I N
G S
A N
D
K
Y
P
L A
N
G-0.0
R E
V I E
W
L S
S
M J M
E
C E
S
E
C E
S
S
N
T
E D
M
G E
N E
R A
L
IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT
SCALE
0 5 10 20
1/8" = 1'-0"SCALE
0 5 10 20
1/16" = 1'-0"
SCALE
0 8 12
1/4" = 1'-0" SCALE
1/2" = 1'-0"
2 4
SCALE
3/4" = 1'-0"
1 2 421 3 6
SCALE
1" = 1'-0"
1 2 3
SCALE
11/2" = 1'-0"
1 2
SCALE
3" = 1'-0"
W
I
N
G
I
T
I
O
N
A
R
Y
A
I
R t h
E
X
P
E
D
REPAIR CC POOL
AL UDEID AIR BASE, QATAR
KEY PLAN
NOT TO SCALE
N
PROJECT LOCATION
NOT FOR CONSTRUCTION
PROJECT NO. 14-0031
SUBMITTED FOR: REVIEW
DATE SUBMITTED: 07 MAR 2018
DEPARTMENT OF THE AIR FORCE
379th AIR EXPEDITIONARY WING
EXPEDITIONARY CIVIL ENGINEER SQUADRON
W
I
N
G
I
T
I
O
N
A
R
Y
A
I
R t h
E
X
P
E
D
INDEX OF DRAWINGS
DWG NO. REV NO. DESCRIPTION
GENERAL
G-0.0 00
COVER SHEET, INDEX OF DRAWINGS AND KEY PLAN
ARCHITECTURAL
A-1.0 00 DEMOLITION PLAN
A-2.0 00 NEW INSTALLATION PLAN AND REFLECTED CEILING PLAN
A-2.0 00 REFLECTED CEILING PLAN
THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.
FA5702-18-R-0016 Attachment 5 Page 1 of 3
2"Ø MASSAGE TWO (2) RETURN
2 1/2"Ø TO AIR JETS
JACUZZI
BALANCE
FV
CHLORINE
STORAGE
CHLORINE
STORAGE
2 1/2" Ø VACUUM LINE
5 1/2" Ø MAIN DRAIN LINE
5 1/2" BALANCE TANK SUCTION
24" X 24" MANHOLE COVER
CONDENSATE LINE
CALOREX MODEL AW 7034 BHC
HEAT/COOL PUMP 3
CALOREX MODEL AW 7034 BHC
HEAT/COOL PUMP 2
63A TPN ISOLATER
TYPICAL THREE (3)
PLACES
CALOREX MODEL AW 7034 BHC
HEAT/COOL PUMP 1
5 1/2" Ø FLOOR INLET LINE
TANK
120V/240V SINGLE
PHASE PANEL
3 NOS. 5.5 HP CIRULATING PUMP
2 NOS. DUTY AND ONE (1) STANDBY
CONTROL PANEL
DISTRIBUTION BOARD
16 NOS. TRANSFORMER
POOL LIGHTS
2 NOS. 1800mm SAND FILTERS
CH/BROMINE FEEDAR
2"Ø MASSAGE ONE (1) RETURN
2 1/2"Ø THERAPY SUCTION
2"Ø VACUUM
2"Ø MAIN DRAIN
2"Ø INLET
2 1/2"Ø THERAPY SUCTION
CHLORINE
STORAGE
12KW SPA HEATER
36"Ø SAND FILTER
BACK WASH TO NEAREST MANHOLE
CHLORINE DOSING PUMP UNIT
PH DOSING PUMP UNIT
3/4 H.P. FILTRATION PUMP
2 H.P. MASSAGE PUMP 1
2 H.P. MASSAGE PUMP 2
AIR MASSAGE AIR BLOWER
HVAC
HVAC
1A
1B 1C
1B
1E
1D
REMOVE EXISTING GATE AND
EXTENT OF WALL AS NOTED
SHEET KEYNOTES
1. CONTRACTOR SHALL DISMANTLE THE EXISTING PUMP ROOM FILTRATION
AND WATER TREATMENT COMPONENTS.
A. TWO (2) 1800mm DIAMETER PRAGA FILTERS MODEL 00691 BY M/s
ASTRAL-SPAIN, COMPLETE FILTER MEDIA - SILICA SAND AND HEADER VALVE
SYSTEM.
B. THREE (3) 5.5 HP (TWO (2) DUTY AND ONE (1) STANDBY) FILTRATION PUMPS
MODEL 08005 BY M/s, ASTRAL-SPAIN.
C. PH DOSING PUMP, CHORINE DOSING PUMP INCLUDING CHEMICAL SENSERS
AND TANKS.
D. AIR MASSAGE AIR BLOWER, 2 H.P. MASSAGE PUMP 2, 2 H.P. MASSAGE PUMP 1,
AND H.P. FILTRATION PUMP.
E. SAND FILTER AND 12KW SPA HEATER.
2. CONTRACTOR SHALL SAW CUT PIPING A MINIMUM OF 12" ABOVE FLOOR.
3. REMOVE THREE (3) CHLORINE STORAGE UNITS AND RAMPS.
4. REMOVE DOUBLE DOORS.
5. REMOVE BOTH HVAC SYSTEM.
6. REMOVE EXISTING CEILING GRID AND CEILING TILES.
7. CONTRACTOR SHALL REMOVE THE THREE (3) EXISTING LIGHT FIXTURES.
LEGEND
DEMOLITION
GENERAL ELECTRICAL NOTES
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND SHOW APPROXIMATE
LOCATIONS OF WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD
VERIFY EXISTING CONDITIONS AND ADJUST EQUIPMENT LOCATIONS TO FIT
THE EXISTING CONDITIONS.
2. INSTALL ALL ELECTRICAL SYSTEMS IN ACCORDANCE WITH THE LATEST NEC,
IECC, UPC AND STANDARDS.
3. ALL WORK SHALL BE COORDINATED WITH SUBCONTRACTORS AND OTHER
TRADES, TO INCLUDE MECHANICAL AND PLUMBING TO MINIMIZE CONFLICTS
WITH OVERHEAD ROUTING, STRUT SUPPORTS, ETC.
4. ALL NEW EQUIPMENT AND MATERIAL TO BE INSTALLED AS PART OF
RENOVATION OR NEW CONSTRUCTION SHALL BEAR AN UNDERWRITERS
LABORATORIES LABEL (UL) (OR CE), AND INSTALLED IN SUCH A MANNER FOR
WHICH THEY ARE DESIGNED AND APPROVED.
5. CONTRACTOR SHALL DOCUMENT AND SUBMIT TO THE CONTRACTING
OFFICER ANY MAJOR DEVIATIONS FROM THE DESIGN DOCUMENTS, AND
ATTAIN APPROVAL BEFORE CONSTRUCTION.
GENERAL NOTES
1. TURN OFF AND DISCONNECT POWER AT SOURCE FOR ALL PUMPS AND
OTHER EQUIPMENT.
2. REMOVE AND CORRECTLY DISPOSE OF POWER AND CONTROL CABLES FOR
ALL EQUIPMENT IN PUMP HOUSE.
R E
V
D E
S C
R I P
T I O
N D
A T
E
W
I
N
G
I
T
I
O
N
A
R
Y
A
I
R t h
E
X
P
E
D
DWG
SHEET
I S
S U
R
U
E
S
E
E
C E
S
C
E P
A U
T
A R
P
A
P
O O
L
P
U M
P
H
O U
S E
D E
M O
L I T
I O
N
P
L A
N
A-1.0
R E
V I E
W
L S
S
M J M
E
C E
S
E
C E
S
T
E D
M
A R
C H
I T
E C
T U
R E
IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT
SCALE
0 5 10 20
1/8" = 1'-0"SCALE
0 5 10 20
1/16" = 1'-0"
SCALE
0 8 12
1/4" = 1'-0" SCALE
1/2" = 1'-0"
2 4
SCALE
3/4" = 1'-0"
1 2 421 3 6
SCALE
1" = 1'-0"
1 2 3
SCALE
11/2" = 1'-0"
1 2
SCALE
3" = 1'-0"
THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.
DEMOLITION PLAN
A-1.0
0 4' 8' 12'
Scale: 3/16" = 1'-0"
FA5702-18-R-0016 Attachment 5 Page 2 of 3
JACUZZI
HVAC HVAC
1 2
3 4
7 7
(2) 6'-0" BY HEIGHT OF WALL WELDED
WIRE FABRIC GATES.
SHEET KEYNOTES
1. CONTRACTOR SHALL SUPPLY AND INSTALLED NEW SALINE CHLORINATION
SYSTEM.
2. CONTRACTOR SHALL SUPPLY ALL ELECTRICAL COMPONENTS FOR EQUIPMENT.
3. CONTRACTOR SHALL SUPPLY ALL PIPING, VALVES AND FITTINGS FOR
EQUIPMENT. ADJUST AND INSTALL PIPE SUPPORTS.
4. PERFORM PIPE PRESSURE TESTING OF PIPING.
5. CONTRACTOR SHALL REPAIR HOLE IN WALL WHERE THROUGH WALL HVAC
WAS THAT.
6. CONTRACTOR SHALL INSTALL NEW HOLLOW METAL DOORS, FRAMES AND NEW
DOOR HARDWARE.
7. CONTRACTOR SHALL INSTALL TWO (2) 2 TON NEW SPLIT SYSTEM HAVC.
8. CONTRACTOR SHALL INSTALL NEW GRID CEILING AND NEW 24" X 24"
CEILING TILES. CEILING TILE SHALL BE WASHABLE, SOIL RESISTANT, MOLD
AND MILDEW RESISTANT.
9. CONTRACTOR SHALL INSTALL THREE (3) NEW 24" X 24" L.E.D. LIGHT FIXTURES.
GENERAL NOTES
1. PROVIDE AND INSTALL NEW XLPE POWER CABLE BETWEEN SOURCE AND
MAIN DISCONNECT SWITCH FOR NEW SALINE CHORINATION SYSTEM.
CABLE TO BE SIZED BASED ON SALINE CHORINATION SYSTEM
SPECIFICATIONS.
2. INSPECT NEW ELECTRICAL WORK FROM KEYNOTES 1, TEST AND TURN
ON. ELECTRICAL CONTRACTOR SHALL REPLACE ANY POWER AND CONTROL
CABLES NOT WORKING AFTER INSTALLATION. PROVIDE MEGGER TEST OF
NEW POWER AND CONTROL CABLES WITH ELECTRICAL INSPECTOR PRESENT
TO WITNESS IF REPLACEMENT IS NECESSARY.
2'X2' LED LIGHT FIXTURE
NEW WALLPACK ON PHOTOCELL (3)
2'X2' LAY-IN ACT AND SUSPENDED GRID
R E
V
D E
S C
R I P
T I O
N D
A T
E
W
I
N
G
I
T
I
O
N
A
R
Y
A
I
R t h
E
X
P
E
D
DWG
SHEET
I S
S U
R
U
E
S
E
E
C E
S
C
E P
A U
T
A R
P
A
P
O O
L
P
U M
P
H
O U
S E
N E
W
I N
S T
A L L A
T I O
N
P
L A
N
A-2.0
R E
V I E
W
L S
S
M J M
E
C E
S
E
C E
S
T
E D
M
A R
C H
I T
E C
T U
R E
IF THIS SHEET IS NOT 24" X 36" IT IS A REDUCED SCALE PRINT
SCALE
0 5 10 20
1/8" = 1'-0"SCALE
0 5 10 20
1/16" = 1'-0"
SCALE
0 8 12
1/4" = 1'-0" SCALE
1/2" = 1'-0"
2 4
SCALE
3/4" = 1'-0"
1 2 421 3 6
SCALE
1" = 1'-0"
1 2 3
SCALE
11/2" = 1'-0"
1 2
SCALE
3" = 1'-0"
THIS DRAWING IS SCHEMATIC IN NATURE. THE GOVERNMENT MAKES NO REPRESENTATIONS REGARDING THE ACCURACY OR COMPLETENESS OF THIS DOCUMENT. THE CONTRACTOR WILL NOT REPRODUCE THIS DOCUMENT FOR USE IN DESIGN SUBMITTALS. THE CONTRACTOR WILL FIELD VERIFY AS-BUILT CONDITIONS PRIOR TO INCLUSION IN PROJECT DRAWINGS.
REFLECTED CEILING PLAN
A-2.0
0 4' 8' 12'
Scale: 3/16" = 1'-0"
NEW INSTALLATION PLAN
A-2.0
0 4' 8' 12'
Scale: 3/16" = 1'-0"
FA5702-18-R-0016 Attachment 5 Page 3 of 3