This document contains questions and answers regarding Solicitation Number FA524023R0031 from the Department of the Air Force Pacific Air Forces for repair and installation of a command post radio and antenna system at Building 21007 on Andersen Air Force Base in Guam. The questions and answers provide clarification on requirements such as using exposed or galvanized conduit, combining cable types in single conduits, minimum conduit sizes, responsibility for equipment power and cable termination, antenna and conduit routing locations, and whether pull boxes, cable trays, grounding and bonding are included. Grounding requirements for both the antenna location and individual communication equipment are also addressed.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Reference Question/Comment Government Response 1 FA524023R0031 Request for Photos Refer to Section J, Attachment 8 in the solicitation 2 FA524023R0031 Requesting for As Built Drawings Refer to Section J, Attachment 9 in the solicitation
3 FA524023R0031
Please advise if conduit can be exposed and installed below ceiling. It can be but not desired.
4 FA524023R0031 Please adivice if galvanized conduit is to be used for this project? Galvanized conduit does not have to be used.
5 FA524023R0031 Can we combine coax cable in single conduit? Or dedicated conduit per coax cable. Yes, combining cables are acceptable.
6 FA524023R0031 What is the minimum sized of conduit allowed for each coax cable?
Current operating procedures state conduit can't be larger than 4" for the facility, we expect there to be a minimum of 4 conduit runs with required drilling. Most cables have a diameter of 1/2 inch minimum.
7 FA524023R0031 Do we need to provide power (receptacle outlet) for the new equipment?
Outlets are already existing in Rm 130 & 131. We believe the load is sufficient, power study can be conducted to confirm.
8 FA524023R0031 Please advise if cable termination will be done by the contractor. Yes. This will be needed.
9 FA524023R0031 Please provide the exact location where to route conduits for the communication equipment.
Antennas need to be mounted to the side of the building at the highest point, with conduit going directly into Rm 131.
Route cabling/conduits anywhere above the ceiling tiles from Rm 131 (Radio Rm) to Rm 123 (EACell).
10 FA524023R0031 Please verify if pull boxes, cable trays, associated grounding and bonding are included in the GFCI.
Contractor needs to supply all the associated. It is not included.
11 FA524023R0031
Do we need to provide new grounding for each communication equipment or grounding only for the antenna location?
Everything will need grounding; site survey will be required to check if we can bond to existing system or if it will need a new independent run.
12 FA524023R0031 Requesting for As Built Drawings Refer to Section J, Attachment 10 in the solicitation
FA524023R0031 - REPAIR INSTALLATION COMMAND POST RADIO AND ANTENNA SYSTEM, BUILDING 21007 - Questions & Answers (Q & A)