This document is a Question and Answer (Q&A) memorandum from the Department of Air Force's 374th Airlift Wing regarding a Request for Quote (RFQ) Number FA520925Q0063 for C-130 Maintenance Stands at Yokota Air Base, Japan. The Q&A addresses six key questions from prospective quoters, covering technical specifications such as mechanical lifting mechanisms, funding timeline, contract options, and electrical component requirements. Specifically, the document clarifies that maintenance stands must have both primary automatic lifting capabilities and a mechanical backup lifting method, with the government potentially receiving funding before 30 September 2025. The request is for a slightly modified version of an existing wrap-around system previously supplied by SIGNYS, with the Air Force intending to exercise some or all option CLINs depending on funding availability. The document also confirms that outdoor-rated electrical and lighting components are acceptable for the ISO Stands, provided they are not installed within designated hazardous zones of the hangar.

View the file

Other files for this federal contract opportunity

Other files attached to C-130 ISO Maintenance Stands & Accessories, newest first.
File Type Posted
_QA 18 Sep 2025.pdf PDF
_QA 17 Sep 2025.pdf PDF
_QA2_10 Sep 2025.pdf PDF
Atc1_Combined Aircraft Dimmension.pdf PDF
_QA1_ 9 Sep 2025 signed.pdf PDF
Atc5_Contractor Personnel Performing in Japan.pdf PDF
Atc1a_Apendencies.pdf PDF
Atc3_Business w US Government.pdf PDF
Atc2_Pricing Schedule V2.xlsx XLSX spreadsheet
Solicitation - FA520925Q0063 V4.pdf PDF
Atc1_Specifications and General Conditions for C-130 Maintenance Stands V2.pdf PDF
Atc6_Notice to Offeror V2.pdf PDF
Atc4_Contractor Responsibility.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

374th Airlift wing

September 15, 2025

MEMORANDUM FOR ALL PROSPECTIVE QUOTERS

SUBJECT: Question and Answer (Q&A) for C-130 Maintenance Stands for Yokota Air Base, Japan

Reference: Request for Quote (RFQ) Number FA520925Q0063

1. We received the below questions from prospective quoters for the referenced RFQ and hereby provide the responses below.

No. Question Response

1 "According to PARA 1.2.1.2, it states that “stands must have mechanical lifting mechanisms in case of operation failure.”

Does this mean that the all stands are required to be equipped with an automatic lifting system operated by hydraulics or motors as the primary system, with a mechanical lifting mechanism installed as a backup? "

That is correct. If the primary auto lifting capabilities fail, there needs to be a method for us to still raise and lower the stands.

2 Could you please advise on the anticipated timeline for when funding will be made available for this requirement?

The Government may receive funding for a portion of the CLINS for this requirement before 30 September 2025

3 Does the USAF intend to make use of contract options within this procurement?

The Government intends to use option as identified in the solicitation for this requirement.

The Government intends on exercising all or a portion of the options CLINS, which will depend on the availability of funding.

4 Is the requested wrap-around system intended to be a direct copy or slightly modified version of the existing system currently in use at Yokota AB?

The request is for a slightly modified version.

5 "Could you please provide background on the existing wrap-around system, including:

o The original supplier o Whether there is an active contract still in place.

The company was SIGNYS and there is no active contract.

6 "Based on NFPA 70 (NEC), UFC, and AFOSH standards, only areas within approximately 18 inches above floor level— where fuel vapors may accumulate—are typically classified as hazardous and require explosionproof-rated equipment (Class I, Division 1 or 2).

Since the ISO Stands are designed for wing and fuselage access and are positioned well above these hazardous zones, our understanding is that outdoor-rated industrial components (NEMA 3R/4X, IP65/IP66 with GFCI protection) would be sufficient and compliant.

We respectfully request your confirmation on the following point:

• Is it acceptable for the ISO Stands to utilize outdoor-rated electrical and lighting components rather than explosionproof equipment, provided that they are not installed within designated hazardous zones of the hangar?"

Yes, it is acceptable for the ISO Stands to utilize outdoor-rated electrical and lighting components rather than explosion proof equipment.

2. If you have any questions regarding this matter, please contact Miya Nemoto (Ms.) or the undersigned at 042-552-3011.

BENJAMIN WARREN

Contracting Officer

CC: 374 MXS

No:
Question:
Response:
1:
That is correct If the primary auto lifting capabilities fail there needs to be a method for us to still raise and lower the stands:
2:
3:
Does the USAF intend to make use of contract options within this procurement:
4:
The request is for a slightly modified version:
5:
The company was SIGNYS and there is no active contract:
6:
Yes it is acceptable for the ISO Stands to utilize outdoorrated electrical and lighting components rather than explosion proof equipment:
2025-09-15T11:14:34+0900