Atch_7b (QA_22Sep20).pdf

PDF 153 KB Posted

Attached to
Repair Air Conditioning (A/C) Units, Bldg 103 at Camp Zama, Japan
Solicitation number
FA520920B0011
Issued by

About this file

This document contains questions and answers regarding Solicitation No. FA520920B0011 for repair work on air conditioning units at Building 103 at Camp Zama, Japan. The work includes removing and replacing air conditioning units and associated ducting and piping. Electrical work involves removing and installing new conduit and wiring for the new air conditioning units, fans, demineralizers and other accessories. Modifications must also be made to existing panel boards, fire alarm systems and sprinkler systems. The contractor must have a Secret facility security clearance and utilize only United States citizens with Secret clearances for work inside Area A, while local national labor can perform work outside of Area A. Clarification is provided that the contractor will not be handling classified information.

View the file

Other files

File Type Posted
Atch_4 (DD254_ Rev 22Sep20).pdf PDF
Amendment 0003 (SF30).pdf PDF
Conformed SF1442 (20B0011-0003).pdf PDF
Conformed SF1442 (20B0011-0002).pdf PDF
Amendment 0002 (SF 30).pdf PDF
Atch_7a (QA_ 21 Sep 20).pdf PDF
Atch_6 (CSP_ Rev 21 Sep 20).pdf PDF
Atch_4 (DD254_ Rev 21 Sep 20).pdf PDF
Amendment 0001 (SF 30).pdf PDF
Atch_6 (CSP).pdf PDF
Atch_5 (Rev_BOM16 Sep 20).pdf PDF
Atch_1a (Addendum No 1).pdf PDF
Atch_7 (QA_16 Sep 20).pdf PDF
Conformed SF1442 (20B0011-0001).pdf PDF
Atch 4_DD 254 Draft.pdf PDF
FA520920B0011.pdf PDF
Atch 3_SMS (A-19-106).pdf PDF
Atch 5_BOM (A-19-106).pdf PDF
Atch 1_Contract Spec (A-19-106).pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for

Solicitation No. FA520920B0011

(DATE: 22 Sep 20)

This Q&A is to revised Q&A dated 21 Sep 20

Question: There are some contradictory requirements between the Amendment CSP & Q&A (dated 16 Sep 20, Attachment 7 in Section J).

(1) The CSP does not define the “project site” that it applies to. Our understanding is that the CSP applies only to Area “A”. Q&A (17) states that Local National labor can be used for all work outside of Area “A”. The CSP 5.b. states that “100% of the facility interior work requirement will be completed (by) US Citizens under cleared escort…”. The Q&A (17) response makes sense if the CSP applies only to Area “A”. Please confirm CSP requirements are limited to Area “A”. Please confirm use of LN labor inside the building.

Answer: CSP will be revised to clarify that only Area “A” under this project shall be performed by the US citizens with “Secret Clearance” and other area can be performed by local national. An amendment will be issued to revise CSP.

(2) Q&A (4) – The response to Q&A (4) states that no classified documents will be distributed to contractor. So in fact the contractor will not be handling/safeguarding classified information at any classification level. Only the Government will be handling/safeguarding classified. Recommend revising the DD‐254, removing safeguarding requirement as imposing TS safeguarding requirements on the contractor quite and extensive and expensive and does not appear to be necessary.

Answer: DD Form 254 (Draft)(Attachment 4 in Section J) has been revised; “Secret” for block 1a.

and “None” for block 1b. An amendment will be issued to revise DD Form 254 (Draft).

Answer: DD Form 254 (Draft) (Attachment 4 in Section J) has been revised as of 22 Sep 20;

“Secret” for both block 1a and 1b based on the security requirement. In addition, the classification of DD Form 254 becomes “Top Secret” when filled in. An amendment will be issued to replace DD Form 254 (Draft) with the one dated 22 Sep 20.

(3) Q&A (16) – The DD‐254 states TS FCL Requirement. By way of DD‐254 I think it is clear the

Contractor Firm must have a TS FCL. However, the guidance in Q&A (16) is unclear and the CSP only requires US Citizen labor under escort. I did not present the question, but I think the question is asking if Secret cleared US labor can be used in Area “A”. The answer states “Yes”, thus allowing use of secret cleared US labor, then further states “contractor have to have top/secret clearance for Security Area “A””. The “Contractor (the firm)” will have TS FCL. Is the response stating that utilization of US labor with either Top Secret or Secret personal clearance is allowable in Area “A”?

Answer: Please see answer (2) above.