Atch 3_SMS (A-19-106).pdf

PDF 84 KB Posted

Attached to
Repair Air Conditioning (A/C) Units, Bldg 103 at Camp Zama, Japan
Solicitation number
FA520920B0011
Issued by

About this file

This document contains a schedule of material submittals for a federal contract to repair air conditioning units in Building 103 at Camp Zama, Japan. The contract requires the submission of 51 items divided into categories such as safety plans, environmental plans, construction documents, shop drawings, work procedures, inspection reports, warranties and more. Submission dates range from within 15 days of award to prior to construction period completion. The schedule specifies whether the contracting officer, civil engineer, or safety office should review each submittal. It also notes the project number, title and solicitation number as A-19-106 for repair of air conditioning units.

View the file

Other files

File Type Posted
Atch_4 (DD254_ Rev 22Sep20).pdf PDF
Amendment 0003 (SF30).pdf PDF
Conformed SF1442 (20B0011-0003).pdf PDF
Atch_7b (QA_22Sep20).pdf PDF
Conformed SF1442 (20B0011-0002).pdf PDF
Amendment 0002 (SF 30).pdf PDF
Atch_7a (QA_ 21 Sep 20).pdf PDF
Atch_6 (CSP_ Rev 21 Sep 20).pdf PDF
Atch_4 (DD254_ Rev 21 Sep 20).pdf PDF
Amendment 0001 (SF 30).pdf PDF
Atch_6 (CSP).pdf PDF
Atch_5 (Rev_BOM16 Sep 20).pdf PDF
Atch_1a (Addendum No 1).pdf PDF
Atch_7 (QA_16 Sep 20).pdf PDF
Conformed SF1442 (20B0011-0001).pdf PDF
Atch 4_DD 254 Draft.pdf PDF
FA520920B0011.pdf PDF
Atch 5_BOM (A-19-106).pdf PDF
Atch 1_Contract Spec (A-19-106).pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-19-106

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 02

1.10.2 Safety *

SECTION 01 11 02

1.10.3 Environmental **

SECTION 01 11 02

1.13.1 Comprehensive Construction

SECTION 01 11 02

2.1 Memo for HM Usage

SECTION 01 11 02

2.3 Drawing Bindings and specificati

SECTION 01 11 02

1.17.1 As Built Drawing

SECTION 01 11 02

1.16.2 Photographic Records

SECTION 01 11 02

1.17.3 Inspection document

SECTION 01 35 43

1.4 Environmental Protection Plan**

SECTION 01 74 19

1.6 Waste Managt Plan**

SECTION 01 74 19

1.7 Manifest

SECTION 02 41 00

1.8 Dem / Deconst Plan

SECTION 05 50 13

1.5 work procedure

SECTION 05 50 13

1.4 Detail Drawings

SECTION 05 50 13

3.10 Field inspection report

X

X

A

14 X

9 X

X

13 X

X

X

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R

U C

TI

O

N S

C

ER

TI

FI

C A

TI

O

N S

X

W O

R K

P R

O C

ED

U

R E

PL

A

N S

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

REPAIR AIR CONDITIONING UNITS, BUILDING

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

X

D11

A or E

A or E

A

A

X

X

D or E

X

A or E

A

A

B

D

E

A

X D or E8

X

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

REPAIR AIR CONDITIONING UNITS, BUILDING

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SECTION 05 50 13

2.2 Mill sheet

SECTION 07 14 00

3.7 Work Procedure

SECTION 07 14 00

3.7 Field Inspection Report

SECTION 07 14 00

1.5 Installer Qualification

SECTION 07 21 16

3.3 Work Procedure

SECTION 07 21 16

3.3 Field Inspection Report

SECTION 09 29 00

3.1.1 Work Procedure

SECTION 09 29 00

1.6 Detail Drawings

SECTION 09 29 00

3.1.1 Field Inspection Reports

SECTION 09 51 00

3.2 Work Procedure

SECTION 09 51 00

1.6 Detail Drawings

SECTION 09 51 00

3.2 Field Inspection Reports

SECTION 09 90 00

1.9 Work Procedure

SECTION 09 90 00

1.9 Field Inspection Report

SECTION 21 13 00

3.3 Work Procedure

17 X A

18 X D or E

19 X A

20 X A

21 X D or E

22 X A

23 X B

24 X D or E

25 X A

26 X B

27 X D or E

28 X A

29 X D or E

30 X A

16 X D or E

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

REPAIR AIR CONDITIONING UNITS, BUILDING

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SECTION 21 13 00

3.3 Field Inspection Report

SECTION 21 13 00

1.3 Certified Technician

SECTION 23 00 00

3.7 Work Procedure

SECTION 23 00 00

1.4.4 Detail Drawings

SECTION 23 00 00

3.7 Field Inspection Report

SECTION 23 00 00

3.2 Field Inspection Report(Duct Cle

SECTION 23 00 00

3.2 Duct Cleaning Contractor

SECTION 23 00 00

3.11.1 Operation and Maintenance M

SECTION 23 07 00

3.1 Work Procedure

SECTION 23 07 00

3.1 Field Inspection Report

SECTION 23 81 00

3.4 Work Procedure

SECTION 23 81 00

1.3.2 Detail Drawing

SECTION 23 81 00

3.4 Field Inspection Report

SECTION 26 05 00

3.3 Work Procedure

SECTION 26 05 00

1.4 Detail Drawings

31 X D or E

32 X A

33 X A

34 X B

35 X D or E

36 X D or E

37 X A

38 X D or E

39 X A

40 X D or E

41 X A

42 X B

43 X D or E

44 X A

45 X B

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

REPAIR AIR CONDITIONING UNITS, BUILDING

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SECTION 26 05 00

3.3 Field Inspection Report

SECTION 26 05 00

1.3 Experienced person

SECTION 28 31 00

1.6 Work Procedure

SECTION 28 31 00

1.4.4 Detail Drawings

SECTION 28 31 00

1.6 Field Inspection Report

SECTION 33 11 01

3.4 Work Procedure

SECTION 33 11 01

2.1.1 Detail Drawings

SECTION 33 11 01

3.4 Field Inspection Report

46 X D or E

47 X A

51 X A

52 X B

53 X D or E

48 X A

49 X B

50 X D or E

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.