This document is a Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification for a Request for Proposal (RFP) for the Add/Repair Fitness Center B622 project at Misawa Air Base, Japan. The document contains 136 queries from prospective contractors and corresponding government responses, covering a wide range of technical, specification, and drawing-related questions across multiple disciplines including electrical, mechanical, architectural, and telecommunications systems.
Key details include the solicitation closing date extended to 30 June 2025, a 700-calendar-day performance period, and extensive clarifications on acceptable materials, standards, and equipment. The government is open to using equivalent Japanese (JIS) products in many cases, with the requirement that contractors provide shop drawings for approval. The project involves comprehensive renovation of Building B622, including electrical systems, HVAC, fire alarm, security systems, steam rooms, saunas, and various finish and equipment upgrades. The responses provide specific technical guidance on everything from ground rod specifications to steam generator characteristics, aiming to provide clear direction for potential bidders while allowing some flexibility in material sourcing.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Query No.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
1 General General Can Building B622 be fully occupied by the contractor during the construction period? Yes.
2 General General Will the government relocate all athletic training equipment and other government-owned property in Building 622 prior to the start of construction?
All items required to be relocated will be relocated.
3 Solicitation Is it possible to extend the bid submission date due to the time required for technical estimates, such as EMCS, cybersecurity, U.S. door frames, glazing, and other specialized items?
The solicitation closing date is extended to 30 June 2025, 1400 hours under Amendment No. 0003.
4 Period of Performance We understand that the construction period has been extended from 555 to 700 days. However, considering the time required for various end-of-project testing activities—such as EMCS, TAB, commissioning, fire alarm testing, and others—would it be possible to consider an additional extension of two months or more?
At this time the Period of Performance will remain at 700 calendar days.
5 Solicitation Section L-100, Part B, Section 3, Sub Section (b)
Section L-100, Part B, Section 3, Sub Section (c), Item (7)
Given the recent and extreme volume of DoD personnel who have left service and/or retired, we are no longer able to reach many of our project Points-of-Contact (POCs) who were involved with our completed projects and have the knowledge to adequately evaluate our performance.
Will the Government allow Contractor Performance Assessment Reporting System (CPARS) to be provided with the proposal for projects in lieu of the submission of Attachment 9 Past Performance Questionnaires (PPQs)?
CPARS provide contractor information; project information; full customer evaluation of a contractor’s performance in quality, management, schedule, regulatory compliance, and cost control;
summary comments; and recommendations regarding the contractor’s ability to perform future work.
This information supports the same information requested in Attachment 9 and provides an adequate review of performance by those intimately involved on the project.
If an offeror is unable to identify a point-of-contact for the proposed past performance and determines that a PPQ request is not feasible, this may be noted in the past performance proposal, and the CPARS may be included in the submission. However, offerors should identify points of contact who can respond to questions regarding the proposed past performance. See Query No. 21.
6 Solicitation Section L-100, Part B, Section 3, Sub Section (d)
Section M-900, Part B
Section L indicates past performance for predecessor companies and/or subcontractors will not be considered. Section M indicates past performance for predecessor companies and/or subcontractors will be considered but not rated as highly as offeror past performance.
Please clarify the conflicting statements between Section L and Section M regarding the utilization of past performance for predecessor companies and subcontractors.
It seems you misread Section M-900. Its paragraph B states, Past performance regarding predecessor companies of the offeror and/or subcontractors that will perform major aspects of the requirement, if applicable (see Section L, para. B.3.(d)), will not be rated as highly as past performance information for the principal offeror."
7 Solicitation Section L-100, Part B, Section 3, Sub Section (f) Subcontractor Consent
Given that the previous sub section (d) does not allow for the past performance of subcontractors, please clarify the requirement for sub section (f) Subcontractor Consent to disclosure of past performance information is not required.
A subcontractor's consent is not required if an offeror's past performance proposal does not include a past performance information pertaining to a subcontractor.
8 Solicitation Section L-100, Part B, Section 4, Sub section (g)
Section L-100, Part B, Section 4, Table
This section states Offerors “can also submit electronic copies of proposals via e-mail” indicating an optional delivery method. However, the proposal submission table indicates electronic copies of proposals via e-mail are required .
Please clarify delivery requirements.
As specified, an offeror is required to submit both a hard copy and an electronic copy. An offeror may use email to deliver the electronic copy. Using DoD SAFE to submit a proposal is not allowed.
9 Solicitation Section L-100, Part B, Section 4, Table
The proposal response timeframe is shortened when paper copies of proposals are required. Pricing elements that can change up through the last hour must be finalized days earlier to accommodate printing, shipping/transit, base access, and delivery timeframes. As a result, the Government risks not receiving an Offeror’s best and lowest price.
Will the Government please consider eliminating the requirement for a paper copy submission and requiring only an electronic submission.
See Query No. 8 above.
10 Solicitation Section L-100, Part B, Section 4, Table
If a paper copy of the proposal must be submitted, will the Government allow paper copies to be delivered within a week (7 days) following the due date of the electronic copy? This will support printing, shipping/transit, base access, and delivery without shortening the proposal response timeframe and ensure the Government receives the best and lowest price offers?
See Query No. 8 above.
11 Specifications Section 02 82 14.00 10, Paragraph 3.3.2
We are unable to locate the referenced “Detail Sheet 27”. Will the Government please provide “Detail Sheet 27” identifying what stationary objects and equipment the Government will not remove from the area of work?
Detail sheet 27 is shown on EP1110-1-11 Engineering and Design --Asbestos Abatement Guideline detail sheets but this guideline is not used at present. Spec 02 82 14.00 10 needs to be revised as follows:
1. Remove “EP1110-1-11 (1992; Change1 1997) Engineering and Design – Asbestos Abatement Guideline Detail Sheets” from para 1.1 of this spec.
2. Para 3.3.2 of spec 02 82 14.00 10 should be changed to remove description “~as shown on
DETAIL SHEET 27, ~”. SPEC WILL BE REVISED IN THE AWARDED SET OF
DOCUMENTS
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
12 Specifications Specification Section 02 82
14.00 10, Paragraph 3.3.1
Please clarify that the Contractor is not responsible for the removal of any furniture or equipment from the work area before work begins.
The contractor is not responsible for the removal of any furniture or equipment from the work area prior to the start of construction. Specification needs to be re written for clarity. SPEC WILL BE
REVISED IN THE AWARDED SET OF DOCUMENTS.
13 Specifications Specification Section 01 11 00, Paragraph 1.40
Please clarify that the entire facility B1196 will be completely vacated by the Government prior to the commencement of on-site work.
Bldg. 622 will be vacated in its entirety prior to the commencement of on-site work.
14 Specifications Specification Section 01 11 00, Paragraph 1.40
If parts of the building will be occupied during construction, requiring phased construction efforts, please identify those restrictions and parameters for executing the scope.
Bldg. 622 will be vacated in its entirety prior to the commencement of on-site work.
15 Solicitation Section L, B.1, Sub Section (a)
Section L, C.4, Sub Section (a)
Please clarify if the “master table of contents of the entire proposal” called for in B.1(a) should be included in Part I, Part II, and Part III based on the requirement noted in C.4(a) “Each Part shall contain a Table of Contents.”
The mater table of contents called in Section L-100, paragraph B.1.(a) is for the entire proposal, including Part I thru III, and to be included in Part I of the proposal. Each of Part I, II, and II shall contain a table of contents as specified in Section L-100, paragraph C.4.(a).
16 Solicitation Section L, B.1, Sub Section (c) It is noted that “Amendments will not be counted against the page limits.”
Please clarify Part I does not have page limits per the proposal submission table in Section L, Paragraph C.
Part I, Summary and Misc. Data does not have a page limit, as shown in the table under Section L- 100, paragraph 4.
17 Solicitation Section L, C.4, Sub Section (a)
Section L, C.4, Sub Section (h)
It is noted in the referenced sub section (a) that “Each Part shall contain… Cross References .”
However, sub section (h) states “Each Part shall be complete in itself and shall not reference information contained in other Parts.”
Please clarify no cross references should be included in any Parts.
Each Part of the proposal may contain cross references directing to additional information located in the same Part. However, each Part shall be complete in itself and shall not reference information contained in other parts.
18 General General Please confirm the manufacturer of the existing Energy Management Control System (EMCS) (Direct Digital Controller) and what version is being used.
EC-BOS-9 & EC net version 4.12.
19 General General Is the EMCS standalone or is it connected to a remote system via hard wire, telephone, microwave, or another system just within the same facility?
EMCS shall operates standalone and it must be connect EMCS server for central monitoring & controls.
20 General General What type of Fire Alarm equipment and system is currently in use on Misawa Air Base? Transmitter: MONACO BT-X Mass Notification System: MONACO MAAP-X
21 Solicitation Section L, B.3, Sub Section (c), Item (7)
Recently, many relevant and knowledgeable points of contact for our projects have left the Government service and/or retired since completion of the project. Given such circumstances, please identify what POC an Offeror should provide contact data for under the past performance information, Item (7).
Offerors should identify points of contact who can answer to questions regarding the proposed past performance. These POCs are critical sources for verifying project scope, magnitude, and complexity as needed. Identifying them helps ensure that the proposed past performance can be fully evaluated.
22 Specifications Section 26 05 00.00 40 Common Work Results for Electrical Para 2.1.1 Conduits and raceways
Section 26 20 00 Interior Distribution System Para 2.1 Materials and Equipment
Specification 26 05 00.00 40 paragraph 2.1.1 states various UL standards for conduit and raceway. On the other hand, Specification 26 20 00 paragraph 2.1 lists only JIS standards. It is our understanding that both JIS and UL standards can be used. Is it acceptable? Please confirm.
Concur. Both JIS and UL are acceptable. Except for Fire Alarm. Fire Alarm must be UL.
23 Specifications Section 26 05 00.00 40 Common Work Results for Electrical Para 2.1.5 Panelboards
Section 26 20 00 Interior Distribution System Para 2.11 Panelboards
This question is the same as question No.1. Regarding panelboard, Section 26 05 00.00 40 specifies UL Standards, while Section 26 20 00 specifies JIS Standards. Therefore, please ensure that both standards can be used.
Concur. Both JIS and UL are acceptable.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
24 Specifications Section 26 20 00 Interior Distribution System Para 2.1.5.1 Circuit Breakers
Section 26 05 00.00 40 Common Work Results for Electrical Para 2.11.3 Circuit Breakers
This question is the same as question No.2. Regarding circuit breakers Section 26 05 00.00 40 specifies UL Standards, while Section 26 20 00 specifies JIS Standards. Therefore, please ensure that both standards can be used.
Concur. Both JIS and UL are acceptable.
25 Specifications Section 26 20 00 Interior Distribution System Para 2.11.3 Circuit Breakers
Section 26 20 00 para 2.11.3 (specification for Japanese breaker) describes: “Breaker terminal: UL listed as suitable for type of conductor provided.”
Japanese product circuit breakers are not compatible with UL standard. Please revise the specification or consider including UL standards so that US materials can be used.
Concur. Shall provide updated specifications to modify "UL listed" to "UL/JIS Listed". Specs will be revised in the awarded set of documents.
26 Specifications Section 26 05 00.00 40 Common Work Results for Electrical Para 2.2.1 Wire and Cable
Section 26 20 00 Interior Distribution System Para 2.5 Wires and Cables (2.5.3 Insulation)
Section 26 05 00.00 40 para 2.2.1 Wires and Cables states that wires and cables shall be provided in accordance with the insulation type requirements of NFPA 70 and UL Standards. On the other hand, Section 26 20 00 para 2.5 Wires and Cables states that wires and cables shall be provided in accordance with applicable requirements of JIS.
Therefore, please modify the specification so that both standards can be used.
Concur. Shall provide updated specifications to incorporate UL and JIS standards for consistency throughout electrical sections. Specs will be revised in the awarded set of documents.
27 Specifications Section 26 20 00 Interior Distribution System Para 2.2 Conduit and Fittings Para 2.2.7.2 Fittings for EMT or Type E Conduit
Specification 26 20 00 para 2.2 indicates standard usage of electrical conduit. Para 2.2.4 allows Japanese products JIS C 8305 type E to be used in this project. However, Type E conduit fitting is a compression type as described in para 2.2.7.2.
Please consider accepting the use of screw type connector & fittings for Type-E conduit.
The intent of NFPA 70 or NEC is to provide a tight connection for coupling and connectors, thus, compression type should be used. Screw type does not meet the intent of NFPA 70 or NEC.
28 Specifications Section 26 20 00 Interior Distribution System Para 2.3 Outlet Boxes and Covers Para 1.4.3 Standard products
As per Spec 26 20 00 para 2.3, outlet boxes and covers are indicated as JIS C 8340 or JIS C 8435.
Moreover, IP65 is required for wet location but the highest rating for Japanese products is IPX4.
(SUS)
Rating IP65 is not possible for Japanese products.
In addition, Specification 26 20 00 para 1.4.3 Standard Products requests to provide materials and equipment that are products of "Manufacturers regularly engaged".
Please modify the specification according to the manufacturer’s recommendation for standard IP rating for wet locations
For wet locations, IP65 is the standard and is available in Japan. This was already implemented in previous MILCON projects. IPX4 is used for electronic equipment such as mobile phones, emergency radios and the like.
29 Specifications Section 26 20 00 Interior Distribution System Para 2.4 Cabinets, Junction Boxes, and Pull Boxes
Per Spec 26 20 00 para 2.4, CABINETS, JUNCTION BOXES, AND PULL BOXES are indicated as JIS C 8340 and IP65 for wet location. But rating IP65 is not possible for Japanese products.
Therefore, please modify and reconfirm the specification according to the manufacturer’s recommendation for standard IP rating for wet location.
For example, IP 23 C is the highest IP rating for exterior use in wet location per JIS standard.
For wet locations, IP65 is the standard and is available in Japan. This was already implemented in previous MILCON projects.
30 Specifications Section 26 20 00 Interior Distribution System Para 2.10 Receptacles
Section 26 20 00 para 2.10 indicates receptacles to meet JIS C 8303, JIS C 8281-1, hard use (also designated heavy-duty), grounding-type.
However, there are no products of receptacles with designated heavy-duty in Japan. Please revise the specification or delete “designated heavy-duty type”.
Will revise spec with the following: "Receptacles shall comply with JIS C 8303 and JIS C 8281-1, grounding-type, and shall be suitable for hard use applications."
Response to bidder: The term 'hard use' shall refer to performance and durability requirements comparable to the North American 'heavy-duty' designation, with the intent of providing a high-durability product suitable for demanding environments.
31 Specifications Section 26 20 00 Interior Distribution System Para 2.7 Device Plates Para 2.8 Switches Para 2.10 Receptacles
Section 26 20 00 para 2.7 Device Plates describes only UL listed.
On the other hand, para 2.8 Switches and para 2.10 Receptacles states only JIS standard products.
Therefore, please remove UL listed or add both UL and JIS standard to be mentioned in the Specification.
Concur. Shall provide updated specifications to incorporate "or equivalent JIS product". Specs will be revised in the awarded set of documents.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
32 Specifications Section 26 20 00 Interior Distribution System Para 2.11.3 Circuit Breakers
Section 26 20 00 para 2.11.3 (specification for Japanese breaker) describes: “Breaker terminal: UL listed as suitable for type of conductor provided.”
Japanese product circuit breakers are not compatible with UL standard. Please revise the specification or consider including UL standards so that US materials can be used.
Concur. Shall provide updated specifications to incorporate "or equivalent JIS product". Specs will be revised in the awarded set of documents.
33 Specifications
Drawings
Section 26 20 00 Interior Distribution System Specification 26 20 00 Interior Distribution System Para 2.11.3 Circuit Breakers
Drawing E-603 ~E-605 Electrical Panel Schedules
Section 26 20 00 para 2.11.3, circuit breaker shall comply with JIS C 8201-2-1 and have a minimum short-circuit current rating equal to the short-circuit current rating of the panelboards in which the circuit breaker will be mounted.
The maximum short-circuits current rating for 1P 20A circuit breaker per JIS is 5KA. UFC 3-520 also specifies that the minimum short circuit current rating of a circuit breaker is 10,000A.
In addition, Drawing E-603, E-604, and E-605 show that the preliminary minimum AIC rating for each branch panel is 18 KAIC to 25 KAIC.
Therefore, do we have to use UL-approved circuit breaker? Please verify.
For drawings E-603, E-604, and E-605, the 18 KAIC and 25 KAIC is rating for the main circuit breaker. It is understood that the KAIC for US and Japanese type circuit breakers have differences in KAIC rating. However, adhere to the minimum KAIC rating for the main circuit breaker.
34 Specifications Section 26 20 00 Interior Distribution System Para 2.10.2 Weatherproof Receptacle
Spec 26 20 00 para 2.10.2 Weatherproof Receptacles describes UL listed for use “wet location” or weather resistant per JIS C 8303, and to include cast metal box with gasketed, hinged, lockable and weatherproof while-in-use, die-cast metal/aluminum cover plate.
However, lockable products are not general-purpose products.
Please consider non-lockable products.
Please check with the catalogs of major manufactures for UL products or JIS products.
Non-lockable product is acceptable. Specs will be revised to be included in the awarded set of documents.
35 Specifications Section 26 20 00 Interior Distribution System Para 2.11.3.2 Circuit Breaker with GFCI or Type RCBO
Specification mentions JIS C8222 for GFCI breaker, with trip on current imbalance of 6 milliamperes or greater per requirements of JIS C 8222 for Class A ground-fault circuit interrupter devices.
But Japanese standard of GFCI breaker trip on current imbalance is 15mA to 30mA. To allow the use of Japanese GFCI breaker (JIS C8222), please revise the specification to indicate 15mA to 30mA instead of 6mA.
Specs will be revised to be included in the awarded set of documents to indicate 15mA to 30mA for GFCI circuit breakers. Alternative JIS material for a GFCI circuit breaker is acceptable as some of the panel schedules in drawings E-603 and E-604 states "CIRCUIT BREAKER 1B-18,20,22 SHALL BE EQUIPPED WITH GROUND-FAULT EQUIPMENT PROTECTION (GFEP) OF 30mA" or similar notes with the corresponding circuit numbers. The Japanese product will meet the 30mA rating.
36 Specifications Section 26 20 00 Interior Distribution System Para 2.14 Transformers
Specification for transformer is JES 2200 and JIS C61558-1, and requirements for transformer insulation system is: 220 degrees C for transformers 15KVA and greater, with temperature rise not exceeding 115 degrees C under full-rated load in maximum ambient of 40 degrees C.
However, the maximum temperature rises for high-grade transformer that apply to JES 2200 is 180 degrees C. But this transformer is compliant with JEC and JEM standard. Therefore, for approval of Japanese product please consider revising the requirements.
The equivalent JIS product should be submitted for review and approval via material transmittal. This specs is a general or ideal standard. If the proposed product has slightly different parameters, but adheres to the JIS standards, then, it is acceptable. However, the specs cannot be revised just to accommodate one certain product.
37 Specifications Section 26 20 00 Interior Distribution System Para 2.16 (c) Motor Controllers
Section 26 20 00 para 2.16 (c) MOTOR CONTROLLERS requires to provide optional functions such as electronic phase-voltage monitors designed to protect motors from phase-loss, under voltage, and over voltage, for motor control panels with 1HP or above.
We consider it is not necessary for non-critical equipment such as ventilator of bathroom since motors can be fully protected with "breaker" and/or "overload relay". Is it acceptable to omit the above optional functions (para 2.16.c)?
Bathroom exhaust fan is small so that is not applicable.
38 Specifications Section 26 20 00 Interior Distribution System Para 2.20.1 Ground Rods
Section 33 71 02 Underground Electrical Distribution Para 2.11.1 Driven Ground Rods
Ground Rods are specified in Section 26 20 00 para 2.20.1 and Section 33 71 02 para 2.11.1. It is specified as “JIS C 60364-5-54. Ground rods: with minimum diameter of 20 mm and minimum length 3000mm.”
On the other hand, in Section 33 71 02 para 2.11.2 it is specified conforming to UL 467 not less than 19 mm in diameter and a minimum length of 3.1 m.
But the JIS standard product is 19mm x 3050 mm (10 ft).
So please approve it as a qualified Japan standard product.
The equivalent JIS product for ground rods can be approved.
39 Specifications Section 26 20 00 Interior Distribution System Para 3.1.5.4 Underground Conduit
Spec 26 20 00 para 3.1.5.4 Underground Conduit mentions plastic-coated rigid steel: plastic-coated steel IMC or type C, LL or LT; PVC, Type EPC-40, or Type VE, HIVE, VP, and HIVP. In addition, it mentions steel conduit before rising through floor slab, and to provide plastic coating to extend minimum 150 mm above floor.
Therefore, instead of plastic-coated steel we propose the use of anti-corrosion tape with double winding. This construction method is a standard of MLIT (Ministry of Land, Infrastructure and Transport) in Japan. Please confirm.
The anti-corrosion tape is acceptable.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
40 Specifications
Drawings
Section 26 11 16.00 33 Three-Phase, Cubicle Type Pad-Mounted Transformer Para 2.6.6.1 Instruments Para 2.6.6.2 Instrument Control Switches
Drawing E-501, E-505 Electrical One Line Diagram Electrical Details
③
Section 26 11 16.00 33 para 2.6.6.1 and Para 2.6.6.2, requires various meters and rotary cam-operated type instrument control switches with positive means of indicating contact positions. These are normally provided for voltmeters and ammeters but are not shown in the new cubicle type transformer station one-line diagram in Drawing E-501 and E-505
③
. Please clarify where these will be used.
Please refer to E-505 (3) Transformer Detail. The metering arrangement includes ammeters and voltmeters on both the primary and secondary sides of the transformer to include volt and amp selector switches (VS) & (AS) as part of instrument scheme.
41 Specifications Section 26 11 16.00 33 Three-Phase, Cubicle Type Pad-Mounted Transformer Para 2.6.6.8 EMCS Terminal
Section 26 11 16.00 33 para 2.6.6.8, requires providing plywood (600mm x 600mm x 12mm) with terminal blocks, receptacle outlet and associated wiring as indicated on drawings for EMCS Terminal.
However, this requirement is not shown in the drawings- please advise where this will be applied.
Refer to EM-series drawings for EMCS coordination and location of EMCS terminals.
42 Specifications
Drawings
Section 26 11 16.00 33 Three-Phase, Cubicle Type Pad-Mounted Transformer Para 2.6.6.1 Instruments
Drawing E-501 Electrical One Line Diagram
Section 26 11 16.00 33 para 2.6.6.1, ammeter, watt meters, varmeters, frequency meters, phase meters, power factor meters, synchroscopes, ohmmeters, conductance meters and multi-function instruments are indicated; however, DWG E-501 only indicates WHM, voltmeter, and ammeter.
Please clarify where the above instruments will be installed, CT Ratios etc.
Instrument will be installed in WHM MITSUBISHI ME110SSR.
43 Specifications Section 26 11 16.00 33 Three-Phase, Cubicle Type Pad-Mounted Transformer Para 2.3 Cubicle Type Unit Substation
Section 26 11 16.00 33 para 2.3 states that the equipment complies with JIS C 4620 and MLIT ESS, and that the enclosure of the substation and inside of the enclosure shall be coated by salt-air proofing paint, heavy-duty type. But this equipment is a product based on Japanese standards.
Therefore, is it acceptable to use manufacturer’s standard recommendation for coating with salt-proofing paint?
See drawing E-505, detail 1 for paint details.
44 Specifications Section 26 05 13.00 40 Medium Voltage Cables Para 3.3-f Field Quality Control
Spec 33 71 02 Underground Electrical Distribution Para 3.19.1.1-b (2) Electrical Tests
Section 26 05 13.00 40 para 3.3-f requires Very Low Frequency (VLF) test (IEEE400.2) for MV cable testing. In addition, section 33 71 02 para 3.19.1.1-b (2) also requires Very Low Frequency (VLF) test (IEEE400.2). However, there is no organization in Japan to perform this test.
This requires the dispatch of engineers from the U.S. and the leasing of testing equipment, both of which are very expensive.
Is it acceptable to perform High Direct Current Voltage (HDCV) test (IEEE400.1) conducted by engineers from Japan Electrical Safety Inspection Association? Please advise.
Concur. Shall provide updated specifications to incorporate equivalent/alternative testing conducted in Japan. Specs will be revised to be included in the awarded set of documents.
45 General Standard product If the standard product specified in the drawing and the specification does not meet the manufacturer standard product, can contractor quote an equivalent product?
The contractor can quote an equivalent JIS product that meets the intent of the drawings and specifications.
46 General Material Alternative Product
For materials provided by contractors, if the products are equivalent (product with equivalent functions), is it acceptable to provide products from manufacturers other than those specified?
The contractor can quote an equivalent JIS product that meets the intent of the drawings and specifications.
47 Specifications Section 33 71 02 Underground Electrical Distribution Para 2.4 Low Voltage Splices
Section 33 71 02 para 2.4, Low Voltage Splice only indicates Heat Shrinkable splice and Cold Shrink rubber splice. Please include resin type, as it is generally used in Japan. Resin type is the best interconnect material and has excellent waterproof protection.
Concur. Shall provide updated specifications to indicate resin type for splices - will remove language for heat shrinkable and cold shrink to ensure resin type is used. Specs will be revised to be included in the awarded set of documents.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
48 Specifications Section 33 71 02 Underground Electrical Distribution Para. 1.5.1 Precast Underground Structures
Specification section 33 71 02 para 1.5.1 requires providing calculations and drawings for precast manholes and handholes bearing the seal of a registered professional engineer.
We would like to provide Japanese precast Manhole (MH) and Handhole (HH) with the same specifications and equivalent (in strength and withstand load) to US product. However, the registered PE seal of approval does not apply to manholes and handholes made in Japan. Since the registered PE seal of approval applies only to US products, we request approval to use Japanese MH and HH in accordance with manufacturer’s standard.
Please consider to state in the specification so that Japanese MH and HH become applicable. We will submit detailed information such as manhole strength and withstand load as variation for approval.
Use Japanese precast manholes and handholes with correct size and for the right applications.
49 Specifications Section 33 71 02 Underground Electrical Distribution Para 2.6 Medium Voltage Cable Terminations Para 2.7 Medium Voltage Cable Joints
Section 33 71 02 para 2.6 (Medium Voltage Cable termination) and para 2.7 (Medium Voltage Cable Joints), only indicates Cold Shrink rubber type. Please include resin type, as it is generally used in Japan. Resin type is the best interconnect material and has excellent waterproof protection.
Concur. Shall provide updated specifications to indicate resin type for splices - will remove language for heat shrinkable and cold shrink to ensure resin type is used. Specs will be revised to be included in the awarded set of documents.
50 Specifications Section 33 71 02 Underground Electrical Distribution Para 3.19.1 Performance of Field Acceptance Checks and Tests
Regarding Field Acceptance Checks and Tests, para 3.19.1 of this section states “Perform in accordance with NETA ATS.
However, since there are no NETA ATS certified engineers in Japan, we propose that the inspection and testing to be performed by Denki Hoan Kyokai for medium voltage system, and a First-Class Construction Electrical Management Engineer (1 Kyu Denkikouji Sekou Kanrigishi) and /or Electrical Chief technician (1 Class Qualified Electrician) certified and approved by GOJ for low voltage system. Please confirm.
Concur. Shall provide updated specifications to indicate "or equivalent Japanese testing standards".
Specs will be revised to be included in the awarded set of documents.
51 Specifications Section 33 71 02 Underground Electrical Distribution Para 2.5.1 Cable Configuration
Specification 33 71 02 para 2.5.1 mentions the use of Medium Voltage cable in accordance with NEMA WC 74/ICEA S-93-639 and UL 1072. In addition, Section 01 42 00.00 30 specifies JIS C 3606 type CV or CE are acceptable as an alternative to Japanese standard.
However, JIS C 3606 type CV or CE do not have the concept of characteristics of 133% insulation level for Japan-made 6.6KV cable.
Therefore, is it acceptable to use JIS C 3606 type CV or CE for Japan-made 6.6KV cable? In the list of acceptable alternative JIS standard, JIS C 3606 CV/CE is also approved. Please confirm.
JIS C 3606 Type CV or CE is as an acceptable alternative. If JIS C 3606 cables are proposed, they must provide an insulation level equivalent to 133% rating. Submittal shall indicate manufacturer documentation confirming that the selected JIS cable provides equivalent dielectric strength and meets the intended system design requirements.
52 Specifications Section 26 05 48.00 10 Seismic Protection for Electrical Equipment Para 1.2.4 Contractor Designed Bracing
Section 26 05 48.00 10 para 1.2.4, states that Seismic Protection calculations must be approved, certified, stamped and signed by a Registered Professional Engineer and to design the bracing in accordance with UFC 3-301-01. However, can we also perform these works by non-US citizen with a 1 Kyu Kenchikushi (1st Class Qualified Architect) in lieu of US licensing qualifications or in accordance with the instruction indicated in the Manufacturer’s recommendation?
For instance, concerning “Seismic Considerations”, products of Manufacturers are seismic qualified at the highest possible level and have been tested in accordance with actual earthquake conditions.
Concur. Shall provide updated specifications to indicate "or Japanese Qualified Engineer". Specs will be revised to be included in the awarded set of documents.
53 Specifications Section 26 05 48.00 10 Seismic Protection for Electrical Equipment Para 3.2.2.1 Recessed Fixtures
Section 26 51 00 Interior Lighting Para 3.1.2.2-a Recessed and Semi Recessed Luminaires
Section 26 05 48.00 10 Para 3.2.2.1 mentions “Recessed lighting fixtures not over 25 kg in weight may be supported by and attached directly to the ceiling system runners using screws or bolts.”
On the other hand, section 26 51 00 para 3.1.2.2-a describes that “Recessed and semi-recessed luminaires independently from the building structure by a minimum of two wires, straps or rods per luminaire and located near opposite corners of the luminaire”.
Please advise which section contractor should select (proceed with) for the installation of fixtures.
Will revise 26 05 48.00 10 Para 3.2.2.1 to remove recessed lighting fixture language. 26 51 00 spec shall apply. Specs will be revised to be included in the awarded set of documents.
54 Specifications Section 26 24 13 Switchboards Para 2.2.5.2 Electronic Watthour Meter
Section 26 24 13 Para 2.2.5.2 mentions “ANSI C12.1. Provide a switchboard style electronic programmable watthour meter, semi-flush mounted, as indicated”.
However, this switchboard style electronic programmable watthour meter is not shown in the drawings- please advise where this will be applied and provide details of wiring diagram.
**Watthour meter included in new substation transformer primary and secondary sides - see E-501.
Watthour meter should be included inside B622 electrical room to monitor fitness center - this will be adjusted in E-501 to show WHM.
Note that WHM are indicated to comply with UFC 3-520-01, 3-5 Metering. Please advise in WHM are not desired.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
55 Specifications Section 26 24 13 Switchboards Para 2.2.2.1 Enclosure
Section 26 24 13 Para 2.2.2.1 states NEMA ICS Type 1 fabricated entirely of 12-gauge ASTM A240/A240M type 304 or 304L stainless steel. But the location of the switchboard (MDP) will be in the electrical room in building 622(indoor installation) Therefore, is it acceptable to provide US or Japan standard indoor specification?
Indoor specifications will suffice. The MDP enclosure in drawing E-605 states NEMA 1 enclosure.
Therefore, reconcile the specs with the drawings. All revised document shall be included in the awarded set of documents.
56 Specifications
Drawings
Section 26 11 16.00 33 Three-Phase, Cubicle Type Pad-Mounted Transformer Para 2.6.6.1 Instruments
Drawing E-501 Electrical One Line Diagram One Line Diagram-New
②
Section 26 11 16.00 33 para 2.6.6.1 states “Metering shall be compliant with the current Advanced Meter Reading System (AMRS) Electric Meter Specifications”. On the other hand, drawing E- 501shows “The WHM are MITSUBISHI ME 110SSR and OMROM KM-N2-FLKUL”.
Which is correct? Please verify.
Drawing E501 is correct.
57 Drawings Drawing E-504 ⑤
Shunt Trip Detail
Drawing E-603 ~ E-605 Electrical Panel Schedules
Drawing E-504, Note indicates “When emergency pushbutton is activated or a signal from the fire alarm devices is energized the shunt trip breaker in panel 「X」to shut down all the shop equipment in this room” But, the main breaker of all panelboards shown on drawings E-603 to E-605 are MLO (Mains Type). So what does the「X」panelboard refer to? Please verify.
Will adjust drawings to clarify. Pushbutton will activate shunt-trip breakers for DOAS units in panel M1. Drawings will be revised to be included in the awarded set of documents.
58 Drawings Drawing E-101 Electrical Site Plan
Drawing E-115 Electrical Roof Lightning Protection Plan
Regarding bonding and lightning protection conductors, the size of the bare copper conductors is not specified in the drawing E-101 and E-115. Please provide the size of each conductor.
Will adjust drawings to indicate size of conductors. Drawings will be revised to be included in the awarded set of documents.
59 Drawings Drawing E-112 Electrical Power Plan Keynotes
② Keynotes in Drawing E-112 describes “provide power for wireless access point (W.A.P) at ceiling, prior to rough-in. Refer to technology sheets for further coordination”. However, we (Contractor) do not know the details of this technology sheets. Please provide it for bidding purposes.
Will remove "technology sheets for further coordination" to avoid confusion. Intent is to provide power to WAP units. WAP unit locations are shown on Telecommunication sheets. Drawings will be revised to be included in the awarded set of documents.
60 Specifications Section 26 41 00 Lightning protection System Para 2.2.2 Ground Rods
Ground Rods are specified in Section 26 41 00 para 2.2.2, which requires to provide ground rods with a diameter not less than 20 mm and a length of at least 3,000 mm. For UL products, the diameter is typically 3/4” (19 mm) diameter. Thus, the standard of UL and JIS are 19 mm (3/4”) x 3050 mm (10 ft). Please revise the specifications.
The JIS equivalent product is acceptable for ground rod.
61 Specifications
Drawings
Section 26 41 00 Lightning protection System Para 3.1.4 Grounding Electrodes
Drawing E-101 Electrical Site Plan
The number of ground rods is not shown in the drawing E-101, but specification section 26 41 00, para 3.1.4 requires that ground rods to be spaced 3000mm apart minimum and equally spaced around the perimeter of the building. The approximate ground ring perimeter indicated in the plan is 258 meters. According to the specifications, the number of ground rods is 86 sets, but the location of test wells are not shown on the drawing. Is it required to provide test wells at each location of the ground rod (86 sets) or only for some of locations? Please verify.
Please refer to E-101 Keynote 8 - "Provide Test well at each ground rod location".
62 Specifications Section 26 24 13 Switchboards Para 3.5.1 Performance of Acceptance Checks and Tests
Para 3.5.1.1 -b. (5) Switchboard Assemblies
b. Electrical Tests (5)
Para. 3.5.1.2 b. (4)~(7) – Circuit Breakers Low voltage - Power – Electrical tests
Para. 3.5.1.3 b. (4)~(7) – Circuit Breakers Low Voltage - Insulated-Case and Low Voltage Molded Case with Solid State Trip
Performance of Acceptance Checks and Tests, para. 3.5.1, states that the visual and mechanical inspection and electrical tests to be performed in accordance with NETA ATS.
However, the following tests (Switchboard Assemblies – Electrical tests, Circuit Breakers Low voltage - Power – Electrical tests and Circuit Breakers Low Voltage - Insulated-Case and Low Voltage Molded Case with Solid State Trips– Electrical tests) which are mentioned in the section under electrical tests related to primary current injection testing, cannot be performed in Japan because there is no test equipment available, and are not common tests performed at field test in Japan.
Therefore, can we perform these tests as factory inspection or following the standard tests of Denki Hoan Kyoukai?
Please consider these conditions.
The factory inspection is a preliminary tests, however, the performance acceptance checks and tests must be done to ensure that the equipment and system is installed correctly and 100% working operationally. The tests could be done by the equivalent qualified and competent personnel.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
63 Specifications Section 26 24 13 Switchboards Para 3.5.1 Performance of Acceptance Checks and Tests
3.5.1.2. b (3) Circuit Breakers - Low Voltage – Power
Section 26 24 13 paragraph 3.5.1.2. b (3) mentions adjust breaker (s) for final settings in accordance with Government provided settings.
Does this mean that the Government will provide the recommended overcurrent setpoints for the LV breaker (s) during the field testing?
This is a general statement. However, as far as low voltage breakers are concerned, the ampere trip should follow the panel schedule.
64 Specifications DIVISION 26 Electrical
General
Division 26 indicates that only UL listed or only JIS products can be used depending on the section.
However, we have used both UL listed product and JIS listed product in the US Military project in Japan.
Therefore, please consider that UL products and JIS products can be used as long as they are equivalent products (with equivalent capacity and functions).
UL listed products and equivalent JIS products is acceptable. However, technical issues arise, coordination to the Contracting Officer is needed for proper determination and action.
65 Specifications Section 26 27 13.10 30 Electric Meters Para 2.4 Spare Parts
Regarding Section 26 27 13.10 30 para 2.4 Spare Parts, please be advised that the following items cannot be provided as “Spare Parts” due to their functions and specifications being integrated into the meter.
c. Potential transformer – three for each type used.
d. Communications module – one for each type used.
e. Protocol module – one for each type used.
Concur. Designer of Record shall update specifications to remove the spare parts. All revised document shall be included in the awarded set of documents.
66 Specifications Section 26 27 13.10 30 Electric Meters Para 3.3.3 Training
Para 2.2.2 Communications protocols and methods
Regarding Section 26 27 13.10 30 para 3.3.3 Training, please note that for conducting the communications protocol and methods of communications specified in para 2.2.2 a special meter will be needed.
Therefore, we have to dispatch engineers from the United Sates.
Dispatching technical instructors and bringing in training equipment from US will significantly impact the construction cost and schedule. Therefore, is it acceptable that the training to be performed by instructors in Japan?
Competent and qualified personnel in Japan alternative to US engineers is acceptable to conduct the required training.
67 Specifications Spec 26 28 01.00 10 Coordination Power System protection
General
In recent years, despite being DBB projects, there has been a tendency, to impose on the contractor the requirement to "Bid as advertised; conduct work in accordance with drawings and specifications" for the notes in the Specs and Drawings that should be considered and implemented at the time of design.
Contractor is not a design firm (DOR). The implementation of COORDINATED POWER SYSTEM PROTECTION to be conducted at DOR at the design stage according to UFC 3-501-01 para 3-2.5.3 Coordination Study, and it is clearly stated that the results, necessary information etc.
during the design stage will all be provided to the contractor.
The contractor will use the data results performed during the design phase to verify the equipment under consideration.
Therefore, it is necessary to provide the data of COORDINATED POWER SYSTEM PROTECTION that was implemented at the time of design.
Short-circuit analysis was conducted during the design and provided the basis for selecting KAIC ratings for panels, as indicated in the panel schedules (Drawings E-603 to E-605).
68 Specifications Section 26 28 01.00 10 Coordinated Power System Protection para:1.4.1 System Coordinator
Spec 26 28 01.00 10, para 1.4.1 requires analyses prepared/performed by a registered professional electrical power engineer with a minimum of 3-year of current experience in the coordination of electrical power systems.
For this project, the unit substation will require new cubicle type transformer stations to apply with JIS C 4620 and circuit breakers will be conformed to JIS C 8201-2-1. This is a standard type of Japanese local product.
Therefore, is it acceptable for a Japanese manufacturer engineer to perform coordinated power system protection when the product meets the inherent properties as indicated in this specification section and drawings, and conform to applicable JIS listed?
Concur. Shall provide updated specifications to indicate an alternative competent and qualified personnel in Japan is acceptable. Revised specs shall be included in the awarded set of documents.
69 Specifications Section 26 28 01.00 10 Coordination Power System protection Para 2.1.6 Study Report
If Study Report (fault current analysis and/or short circuit verification) would be needed, please provide short circuit current value at service entrance point.
We cannot perform the Field Testing (verification of short circuit and/or fault current) without this information.
Short-circuit analysis was conducted as part of the design analysis (Appendix F – Electrical - Short Circuit Analysis). Analysis is based on infinite bus to model worst-case scenario. (IAW UFC-3-501- 01, 3-2.4)
70 Specifications Spec 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration
General
Concerning section 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration, we (contractor) have following questions:
1. Are the UMCS and EMCS (Energy Monitoring Control System) independently and separately monitored and operated as a separate system?
2. Does UMCS and EMCS have compatibility? Or is EMCS equivalent to UMCS?
EMCS and UMCS are referring to the same system.
Target Document
Reference Question Submitted by Prospective Offerors Government Response/Clarification
Request for Proposal (RFP) No. FA520525R0002, Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Date: 11 June 2025
71 Drawings Drawing E-101 Electrical Site Plan
Keynotes
① Keynotes in Drawing E-101 indicates “See detail 2/E-506 for additional information”. However, sheet number 2/E-506 is not included in the bid drawings. Please provide this information for bidding purposes.
Page typo, no missing drawing. Will adjust E-101 keynote (1) to indicate "See detail 2/E-505..."
Revised drawings shall be included in the awarded set of documents.
72 Drawings Drawing E-101 Electrical Site Plan Keynotes
③ In Drawing E-101 Electrical Site Plan Keynotes No. it states “ Provide connection of lightning protection down conductors to ground ring electrode. See sheet E-114. (Typical)”. We think this is referring to sheet E-115, not sheet E-114. Please confirm.
Correct. Will adjust E-101 to indicate "E-115". Revised drawings shall be included in the awarded set of documents.
73 Drawings Drawing E-101 Electrical Site Plan Keynotes
⑥
Drawing E-503 Electrical Details
Keynotes in Drawing E-101 mentions “Provide (3) new medium voltage conduits from new manhole C302-HR to existing T622/T625 manhole C302-HN2. See Electrical details sheet E-503 for additional information”. However, there is no additional information about MV conduits in drawing E-503. Please provide this information.
Page typo. Will adjust E-101 keynote (6) to indicate "E-502." Revised drawings shall be included in the awarded set of documents.
74 Drawings Drawing E-101 Electrical Site Plan Keynotes
⑧
Drawing E-115 Electrical Roof Lightning Protection Plan
Keynotes in Drawing E-101 indicates “Location of ground rods and test wells for grounding electrode system. See electrical details for additional information. Provide test well at each ground rod location”. Where is the electrical details and additional information and the location of test well?
Please provide.
See response to RFI #61. Ground rods are to be spaced 3000mm apart minimum and equally spaced around the perimeter of the building. Contractor to field verify and install accordingly and install a test well at each ground rod. Electrical detail of test well is in E-504. Other detail sheets include additional information regarding grounding and bonding.
75 Drawings Drawing E-115 Electrical Roof Lightning Protection Plan
Roof Power Plan Notes New No.
④
In Drawing E-115 Electrical Roof Lightning Protection Plan, Notes No.
This is the start of the file's text. The full file is on GovTribe.