FA520525R0002_Atch4_Schedule of Material Submittals_12Oct23.pdf

PDF 2 MB Posted

Attached to
Project No. QKKA 171017, Add/Repair Fitness Center B622, Misawa Air Base, Japan
Solicitation number
FA520525R0002
Issued by

About this file

The Schedule of Material Submittals is a comprehensive document detailing the required documentation, submittals, and product data for a fitness center addition/repair project at Misawa Air Base, Japan. The 30-page document systematically lists material submittals across multiple construction and engineering disciplines, including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, and operation and maintenance data.

The schedule covers an extensive range of technical sections from site preparation and earthwork to electrical, mechanical, telecommunications, and fire protection systems. Each section specifies detailed requirements for submittals such as shop drawings, product data, samples, test reports, warranties, installation drawings, equipment certifications, and quality control documentation. Contractors must provide three copies of each submittal, with specific reference to specification paragraphs, contract requirements, and submission dates. The document serves as a comprehensive checklist to ensure thorough documentation and compliance across all project phases and technical domains for the fitness center construction project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

1 01 32 01.00 10 Project Schedule 3.4 3

2 01 33 00 Schedule of Material Submittals (SMS) 1.4 3

3 01 35 29 Accident Prevention Plan (APP) 1.6 3 4 01 35 29 Activity Hazard Analysis (AHA) 1.7 3 5 01 35 29 Crane Operators 1.5.1.4 3 6 01 35 29 Crane Critical Lift Plan 1.6.1 3 7 01 35 29 Reports 1.12 3 8 01 35 29 Accident Reports 1.12.1 3 9 01 35 29 Monthly Exposure Reports 1.12.3 3 10 01 35 29 Crane Reports 1.12.4 3 11 01 35 29 Confined Space Entry Permit 1.8 3 12 01 35 29 Hot work permit 1.8 3 13 01 35 29 Certificate of Compliance 1.12.5 3 14 01 35 29 Machinery & Mechanized Equipment Certification Form 3.5.3 3

15 01 45 00.00 10 Contractor Quality Control (CQC) Plan 3.2 3 16 01 45 00.00 10 Verification Statement 3.9 3

17 01 57 19 Pre-construction Survey 3 18 01 57 19 Environmental Protection Plan 3 19 01 57 19 Natural/Cultural Resources Management Plan 3 20 01 57 19 Air Quality Management Plan 3 21 01 57 19 Water Quality Management Plan 3 22 01 57 19 Hazardous Materials Management Plan 3 23 01 57 19 POL Management Plan 3 24 01 57 19 Waste Management Plan 3 25 01 57 19 Employee Training Records 3 26 01 57 19 Environmental Manager Qualifications 3 27 01 57 19 Laboratory Analysis 3 28 01 57 19 Inspection Reports 3 29 01 57 19 Solid Waste Management Report 3 30 01 57 19 Waste Determination for all Waste Streams 3 31 01 57 19 Employee Training Records 3 32 01 57 19 EMS Certificate Of Completion 3 33 01 57 19 Certificate of Competency 3 34 01 57 19 Erosion and Sediment Control Inspector Qualifications 3 35 01 57 19 Erosion Control Plan Compliance Notebook 3 36 01 57 19 Stormwater Pollution Prevention Plan Compliance Notebook 3 37 01 57 19 Monthly Hazardous Material usage totals 3 38 01 57 19 Hazardous Waste/Debris Management 3 39 01 57 19 Solid Waste Management Report 3 40 01 57 19 Waste Determination Documentation 3 41 01 57 19 Construction MAB Contractor Solid Waste & Demolition (C&D) Debris Data 3 42 01 57 19 Disposal, Diversion and Recycling Worksheet 3 43 01 57 19 Weigh Tickets/Bills of Lading for Disposal Activities (soil/waste/construction 3 44 01 57 19 Documentation for Hazardous and Regulated Waste Disposal 3 45 01 57 19 Hazardous Waste Manifests 3 46 01 57 19 Sales Documentation 3 47 01 57 19 Contractor Certification 3 48 01 57 19 As-Built Topographic Survey 3

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

01 33 00 SUBMITTAL PROCEDURES

01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

01 32 01 .00 10 PROJECT SCHEDULE

Schedule of Material Submittals

1392090220U Text Box Attachment 4 to RFP No. FA520525R0002 Date: 12 Oct 23

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

49 01 78 00 Spare Parts Data 1.4 3 50 01 78 00 Instructions 1.6.1 3 51 01 78 00 Operation and Maintenance Manuals 3.3 3 52 01 78 00 As-Built Drawings 3.1 3 53 01 78 00 As-Built Record of Equipment and Materials 3.2 3 54 01 78 00 Final Cleaning 3.4 3 55 01 78 00 Warranty Management Plan 1.6.1 3 56 01 78 00 Warranty Tags 1.6.3 3 57 01 78 00 Record Drawings 3.1.2 3

58 01 78 23 Operation and Maintenance (O&M) Data 1.3 3

59 02 41 00 Existing Conditions 1.9 3 60 02 41 00 Demolition Plan 1.2.1 3 61 02 41 00 Notification 1.6 3 62 02 41 00 Receipts 3.2.2 3

63 02 82 00 Encapsulants 2.1 3 64 02 82 00 Amended Water 1.2.2 3 65 02 82 00 Safety Data Sheets (SDS) for All Materials 1.3.9 3 66 02 82 00 Respirators 3.1.2.1 3 67 02 82 00 Local Exhaust Equipment 3.1.7 3 68 02 82 00 Pressure Differential Automatic Recording Instrument 3.1.7 3 69 02 82 00 Vacuums 3.1.8 3 70 02 82 00 Air Sampling Results 1.5.5 3 71 02 82 00 Pressure Differential Recordings for Local Exhaust System 1.5.6 3 72 02 82 00 Encapsulation Test Patches 3.2.11.2 3 73 02 82 00 Clearance Sampling 3.2.13.5 3 74 02 82 00 Asbestos Disposal Quantity Report 3.3.3.2 3 75 02 82 00 Encapsulants 2.1 3 76 02 82 00 Equipment Used to Contain Airborne Asbestos Fibers 3.1 3 77 02 82 00 Asbestos Hazard Abatement Plan 1.3.10 3 78 02 82 00 Testing Laboratory 1.3.11 3 79 02 82 00 Landfill Approval 1.3.12 3 80 02 82 00 Transporter Certification 1.3.13 3 81 02 82 00 Medical Certification 1.3.14 3 82 02 82 00 Employee Training 1.3.4 3 83 02 82 00 Notifications 1.3.5 3 84 02 82 00 Respiratory Protection Program 1.3.7 3 85 02 82 00 Private Qualified Person Documentation 1.5.1 3 86 02 82 00 Designated Competent Person 1.5.2 3 87 02 82 00 Worker's License 1.5.3 3 88 02 82 00 Contractor's License 1.5.4 3 89 02 82 00 Citations on Previous Projects 1.5.7 3 90 02 82 00 Water Filtration Equipment 3.1.3.3 3 91 02 82 00 Vacuums 3.1.8 3 92 02 82 00 Ventilation Systems 3.1.8 3 93 02 82 00 Permits 1.3.5 3 94 02 82 00 Notifications 1.3.5 3 95 02 82 00 Respirator Program Records 1.3.7.1 3 96 02 82 00 Rental Equipment 1.7.1 3

97 02 82 14.00 10 Asbestos Hazard Abatement Plan (AHAP) 1.6 3 98 02 82 14.00 10 Detailed Drawings 1.3 3

01 78 23 OPERATION AND MAINTENANCE DATA

02 41 00 DEMOLITION

02 82 00 ASBESTOS REMEDIATION

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

Schedule of Material Submittals

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

99 02 82 14.00 10 Training Program 1.1 3 100 02 82 14.00 10 Encapsulants 2.1 3 101 02 82 14.00 10 Cleanup and Disposal 3.11 3 102 02 82 14.00 10 Qualifications 1.5.1 3 103 02 82 14.00 10 Licenses, Permits and Notifications 1.7.1 3 104 02 82 14.00 10 Respiratory Protection Program 1.8.1 3 105 02 82 14.00 10 Asbestos Waste Shipment Records 3.11.3.1 3 106 02 82 14.00 10 Weight Bills and Delivery Tickets 3.11.3.1 3 107 02 82 14.00 10 Asbestos Management Plan 3.11.3.2 3 108 02 82 14.00 10 Asbestos Sampling Plan 1.6.1 3 109 02 82 14.00 10 Medical Surveillance Requirements 1.8 3 110 02 82 14.00 10 Exposure Assessment and Air Monitoring 3.9 3 111 02 82 14.00 10 Final Clearance Sampling/Analysis Sheets 1.6.1 3 112 02 82 14.00 10 Hazardous Waste Disposal Record (Copy E) 3.11.3.1 3

113 02 85 00.00 20 Preliminary Visual Assessment Report 1.4.1.1 3 114 02 85 00.00 20 Microbial Remediation Plan 1.4.1.2 3 115 02 85 00.00 20 Respiratory Protection Program 1.4.1.3 3 116 02 85 00.00 20 Worker Records 1.4.1.4 3 117 02 85 00.00 20 Certified Industrial Hygienist (CIH)/Industrial Hygienist (IH) 1.4.1.5 3 118 02 85 00.00 20 Microbial Remediation Supervisor Qualifications 1.4.1.6 3 119 02 85 00.00 20 Fungicidal Agents 1.2.10 3 120 02 85 00.00 20 Personal Protective Equipment (PPE) 1.2.17 3 121 02 85 00.00 20 Pressure Differential Measuring Instrument 1.2.20 3 122 02 85 00.00 20 Disinfectants or Biocide Sanitizing Solutions 1.2.8 3 123 02 85 00.00 20 Dehumidifiers 3.1.4 3 124 02 85 00.00 20 Air Filtration Units 3.1.5 3 125 02 85 00.00 20 Daily Reports 1.4.3 3 126 02 85 00.00 20 Submittals at Completion of Remediation Work 1.4.4 3

127 03 30 00 Maturity Method Data 40240 3 128 03 30 00 Form Removal Schedule 1.6.2.1 3 129 03 30 00 Concrete Curing Plan 1.6.3.1 3 130 03 30 00 Quality Control Plan 1.6.5 3 131 03 30 00 Quality Control Personnel Certifications 1.6.6 3 132 03 30 00 Quality Control Organizational Chart 1.6.6 3 133 03 30 00 Laboratory Accreditation 1.6.8 3 134 03 30 00 Formwork 1.6.2.1 3 135 03 30 00 Reinforcing Steel 1.6.2.2 3 136 03 30 00 Formwork Materials 2.1 3 137 03 30 00 Reinforcement 2.6 3 138 03 30 00 Pumping Concrete 1.6.3.2 3 139 03 30 00 Finishing Plan 1.6.3.3 3 140 03 30 00 Waterstops 2.2.2 3 141 03 30 00 Biodegradable Form Release Agent 2.2.3 3 142 03 30 00 Cementitious Materials 2.3.1 3 143 03 30 00 Recycled Aggregate Materials 2.3.3.2 3 144 03 30 00 Admixtures 2.3.4 3 145 03 30 00 Concrete Curing Materials 2.4.1 3 146 03 30 00 Nonshrink Grout 2.4.2 3 147 03 30 00 Liquid Chemical Floor Hardeners and Sealers 2.4.3.1 3 148 03 30 00 Joint Filler 2.4.4 3 149 03 30 00 Joint Sealants 2.4.5 3 150 03 30 00 Vapor Retarder 2.4.6 3

02 85 00.00 20 MOLD REMEDIATION

03 30 00 CAST-IN-PLACE CONCRETE

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

151 03 30 00 Formwork Calculations 1.6.1.1 3 152 03 30 00 Concrete Mix Design 1.6.1.2 3 153 03 30 00 Concrete Mix Design 1.6.1.2 3 154 03 30 00 Fly Ash 1.6.4.1 3 155 03 30 00 Pozzolan 1.6.4.1 3 156 03 30 00 Slag Cement 1.6.4.2 3 157 03 30 00 Aggregates 1.6.4.3 3 158 03 30 00 Water 2.3.2 3 159 03 30 00 Tolerance Report 3.10.2.1 3 160 03 30 00 Slump Tests 3.14.3.1 3 161 03 30 00 Compressive Strength Tests 3.14.3.3 3 162 03 30 00 Air Content 3.14.3.4 3 163 03 30 00 Unit Weight of Structural Concrete 3.14.3.5 3 164 03 30 00 Chloride Ion Concentration 3.14.3.6 3 165 03 30 00 Welder Qualifications 1.8 3 166 03 30 00 VOC Content for Form Release Agents, Curing Compounds, and 1.6.3.4 3 167 03 30 00 Safety Data Sheets 1.6.3.5 3 168 03 30 00 Field Testing Technician and Testing Agency 1.6.6.2 3 169 03 30 00 Reinforcing Bars 2.6.1 3 170 03 30 00 Curing Compound 2.4.1 3 171 03 30 00 Liquid Chemical Floor Hardeners and Sealers 2.4.3.1 3 172 03 30 00 Joint Sealants 2.4.5 3

173 05 05 20 Installer Qualifications 1.5.1.1 3 174 05 05 20 Post-Installed Anchor Special Inspector Qualifications 1.5.1.2 3 175 05 05 20 Post-Installed Anchors 2.1.1 3 176 05 05 20 Mechanical Anchors in Concrete 2.1.1.3 3 177 05 05 20 Adhesive Anchor System in Concrete 2.1.1.4 3 178 05 05 20 Non-Shrink, Non-Metallic Grout 3.1.3 3 179 05 05 20 Post-Installed Anchor Special Inspections Report 3.3.4 3 180 05 05 20 Post-Installed Anchor Certification 2.1.1.1 3 181 05 05 20 Manufacturer's Material Data Sheets 1.5 3 182 05 05 20 Manufacturer's Printed Installation Instructions 2.1.1.2 3 183 05 05 20 Non-Shrink, Non-Metallic Grout 3.1.3 3

184 05 05 23.16 Welding Quality Assurance Plan 3.2 3 185 05 05 23.16 Welding Procedure Qualifications 1.3 3 186 05 05 23.16 Welding Electrodes and Rods 2.2 3 187 05 05 23.16 Previous Qualifications 1.3.2 3 188 05 05 23.16 Pre-Qualified Procedures 1.3.3 3 189 05 05 23.16 Welder, Welding Operator, and Tacker Qualification 1.3.4 3 190 05 05 23.16 Weld Inspection Log 3.2 3 191 05 05 23.16 Nondestructive Testing 3.3 3 192 05 05 23.16 Certified Welding Procedure Specifications (WPS) 1.3.1 3 193 05 05 23.16 Certified Brazing Procedure Specifications (BPS) 1.3.1 3 194 05 05 23.16 Certified Procedure Qualification Records (PQR) 1.3.1 3 195 05 05 23.16 Certified Welder Performance Qualifications (WPQ) 1.3.1 3 196 05 05 23.16 Certified Brazer Performance Qualifications (BPQ) 1.3.1 3 197 05 05 23.16 Certified Welding Inspector 1.3.5 3 198 05 05 23.16 Nondestructive Testing Personnel 1.3.5 3

199 05 12 00 Erection and Erection Bracing Drawings 1.4.1.1 3 200 05 12 00 Fabrication Drawings 1.4.2 3 201 05 12 00 Tension Control Bolts 2.3.3 3

05 05 20 POST-INSTALLED CONCRETE AND MASONRY ANCHORS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

202 05 12 00 Welding Electrodes and Rods 2.4.1 3 203 05 12 00 Non-Shrink Grout 2.4.2 3 204 05 12 00 Shop Primer 2.6.2 3 205 05 12 00 Shoring and Temporary Bracing 1.4.2 3 206 05 12 00 Design Calculations for Steel Connections 1.4.3 3 207 05 12 00 Bolts, Nuts, and Washers 2.3 3 208 05 12 00 Weld Inspection Reports 3.6.1.2 3 209 05 12 00 Bolt Testing Reports 3.6.2.1 3 210 05 12 00 Steel 2.2 3 211 05 12 00 Bolts, Nuts, and Washers 2.3 3 212 05 12 00 Galvanizing 2.5 3 213 05 12 00 Welding Procedure Specifications (WPS) 3.4 3 214 05 12 00 Welding Procedures and Qualifications 1.4.4.1 3 215 05 12 00 Welding Electrodes and Rods 2.4.1 3 216 05 12 00 Certified Welding Inspector 3.6.1.1 3 217 05 12 00 NDT Technician 3.6.1.2 3

218 05 30 00 Fabrication Drawings 1.3.4 3 219 05 30 00 Deck Units 2.1 3 220 05 30 00 Accessories 2.2 3 221 05 30 00 Welding Equipment 1.3.3 3 222 05 30 00 Welding Rods and Accessories 1.3.3 3 223 05 30 00 Touch-Up Paint 2.1.4 3 224 05 30 00 Mechanical Fasteners 2.2.8 3 225 05 30 00 Deck Units 2.1 3 226 05 30 00 Manufacturer's Certificate 1.3.1 3 227 05 30 00 Powder-Actuated Tool Operator 1.3.2 3

228 05 50 13 Expansion Joint Covers 2.5 3 229 05 50 13 Floor Gratings 2.6 3 230 05 50 13 Corner Guards 2.3 3 231 05 50 13 Cover Plates and Frames 2.4 3 232 05 50 13 Expansion Joint Covers 2.5 3 233 05 50 13 Floor Gratings 2.6 3 234 05 50 13 Expansion Joint Covers 2.5 3

235 05 51 33 Ladders 2.3 3 236 05 51 33 Ladders 2.3 3 237 05 51 33 Fabricator Certification for Ladder Assembly 1.3 3

238 05 52 00 Iron and Steel Hardware 3.2 3 239 05 52 00 Steel Shapes, Plates, Bars and Strips 3.2 3 240 05 52 00 Structural-Steel Plates, Shapes, and Bars 2.2.1 3 241 05 52 00 Structural-Steel Tubing 2.2.2 3 242 05 52 00 Cold-Drawn Steel Tubing 2.2.3 3 243 05 52 00 Steel Railings and Handrails 2.2.6 3 244 05 52 00 Aluminum Railings and Handrails 2.2.7 3 245 05 52 00 Welding Procedures 1.3.1 3 246 05 52 00 Welder Qualification 1.3.2 3 247 05 52 00 Installation Instructions 3.2 3

248 06 20 00 Treated Wood Products 1.3 3 249 06 20 00 Wood Products 2.1 3 250 06 20 00 Trim 2.2 3

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

06 20 00 FINISH CARPENTRY

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

251 06 20 00 Hardware and Accessories 2.5 3 252 06 20 00 Samples 1.4 3

253 06 41 16.00 10 Shop Drawings 2.11 3 254 06 41 16.00 10 Installation 3.1 3 255 06 41 16.00 10 Shop Drawings 1.4.2 3 256 06 41 16.00 10 Wood Materials 2.1 3 257 06 41 16.00 10 Wood Finishes 2.1 3 258 06 41 16.00 10 Finish Schedule 2.11.7.3 3 259 06 41 16.00 10 Plastic Laminates 2.3 3 260 06 41 16.00 10 Cabinet Hardware 2.7 3 261 06 41 16.00 10 Quality Assurance 1.4 3 262 06 41 16.00 10 Laminate Clad Casework 2.1 3 263 06 41 16.00 10 Laminate Clad Casework 3.1 3

264 06 61 16 Installation 3.1 3 265 06 61 16 Detail Fabrication Drawings 1.4.2 3 266 06 61 16 Solid Polymer 2.1.1 3 267 06 61 16 Material 2.1 3 268 06 61 16 Counter Tops 2.3.4 3 269 06 61 16 Qualifications 1.4.1 3 270 06 61 16 Solid Polymer 2.1.1 3

271 07 14 00 Fluid-Applied Membrane 2.1 3 272 07 14 00 Membrane Primer 2.2 3 273 07 14 00 Bond Breaker 2.7 3 274 07 14 00 Solvent 3.3 3 275 07 14 00 Moisture Meter 3.4.1 3 276 07 14 00 Warranty 1.6 3 277 07 14 00 Instructions To Government Personnel 3.5 3

278 07 21 13 Manufacturer's Standard Details 1.3 3 279 07 21 13 Protection Board or Coatings 1.4 3 280 07 21 13 Block or Board Insulation 2.1 3 281 07 21 13 Vapor Retarder 2.2 3 282 07 21 13 Pressure Sensitive Tape 2.3 3 283 07 21 13 Accessories 2.5 3 284 07 21 13 Special Warranties 1.7 3 285 07 21 13 Special Warranties 1.7 3 286 07 21 13 Block or Board Insulation 2.1 3 287 07 21 13 Vapor Retarder 2.2 3 288 07 21 13 Protection Board or Coating 2.4 3 289 07 21 13 Block or Board Insulation 2.1 3 290 07 21 13 Adhesive 2.5.1 3

291 07 21 16 Blanket Insulation 2.1 3 292 07 21 16 Pressure Sensitive Tape 2.3 3 293 07 21 16 Accessories 2.4 3 294 07 21 16 Insulation 3.3.1 3

295 07 42 63 Qualification of Manufacturer 1.5.3 3 296 07 42 63 Qualification of Installer 1.5.4 3 297 07 42 63 Fabrication and Installation drawings 1.5.1 3 298 07 42 63 Wall Panel Assemblies 1.5.1 3

07 21 16 MINERAL FIBER BLANKET INSULATION

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

299 07 42 63 Flashing and Accessories 1.5.1 3 300 07 42 63 Anchorage Systems 1.5.1 3 301 07 42 63 Manufacturer's catalog data 1.5.1 3 302 07 42 63 Factory Color Finish 1.5.1 3 303 07 42 63 Sub-girts and Formed Shapes 1.5.1 3 304 07 42 63 Closure Materials 1.5.1 3 305 07 42 63 Insulation 1.5.1 3 306 07 42 63 Pressure Sensitive Tape 1.5.1 3 307 07 42 63 Accessories 1.5.1 3 308 07 42 63 Sealants and Caulking 2.4.3.1 3 309 07 42 63 Wall Panel Assemblies 1.5.1 3 310 07 42 63 Fasteners 1.5.1 3 311 07 42 63 Metal Closure Strips 1.5.1 3 312 07 42 63 Insulation 1.5.1 3 313 07 42 63 manufacturer's color charts and chips 1.5.1 3 314 07 42 63 Wind Design Analysis 1.5.1 3 315 07 42 63 Wind Load Tests 1.3.2 3 316 07 42 63 Seismic Tests 1.3.2 3 317 07 42 63 Factory Color Finish 1.5.1 3 318 07 42 63 Leakage Tests 3.7.2 3 319 07 42 63 Fasteners 1.5.1 3 320 07 42 63 wall system assembly wind load classification listing 1.5.1 3 321 07 42 63 Installation of Wall Panels 1.5.1 3 322 07 42 63 Warranty 1.5.1 3 323 07 42 63 Instructions 1.5.1 3 324 07 42 63 Safety Data Sheets 1.5.1 3 325 07 42 63 20 year 'No-Dollar-Limit' Warranty 1.5.1 3

326 07 57 00 Primer 2.1.1.2 3 327 07 57 00 Urethane Base Compound 2.1.1.2 3 328 07 57 00 Urethane Topcoat 2.1.1.2 3 329 07 57 00 Urethane Topcoat 2.1.1.2 3 330 07 57 00 Protective Coating 2.1.1.1 3

331 07 60 00 Recycled Content 2.1 3 332 07 60 00 Exposed Sheet Metal 2.2.1 3 333 07 60 00 Gravel Stops and fascia 2.2.1 3 334 07 60 00 Reglets 2.2.9 3 335 07 60 00 Base Flashing 3.1.11 3 336 07 60 00 Counterflashing 3.1.12 3 337 07 60 00 Drip Edges 3.1.15 3 338 07 60 00 Gutters 3.1.16 3 339 07 60 00 Downspouts 3.1.17 3 340 07 60 00 Eave Flashing 3.1.18 3 341 07 60 00 Expansion Joints 3.1.20 3 342 07 60 00 Flashing at Roof Penetrations and Equipment Supports 3.1.21 3 343 07 60 00 Copings 3.1.23 3 344 07 60 00 Finish Samples 1.4.2 3 345 07 60 00 Quality Control Plan 3.5 3 346 07 60 00 Instructions for Installation 1.4.3 3 347 07 60 00 Cleaning and Maintenance 1.4.3 3

348 07 61 15.00 20 Roofing Panels 2.1 3 349 07 61 15.00 20 Warranty 1.8 3

07 57 00 URETHANE SPRAYED ELASTOMERIC ROOF COATINGS OVERLAY SYSTEM

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

350 07 61 15.00 20 Roofing Panels 2.1 3 351 07 61 15.00 20 Attachment Clips 2.2 3 352 07 61 15.00 20 Accessories 2.3 3 353 07 61 15.00 20 Underlayment 2.4 3 354 07 61 15.00 20 Closures 2.3.1 3 355 07 61 15.00 20 Roofing Panels 2.1 3 356 07 61 15.00 20 Accessories 2.3 3 357 07 61 15.00 20 Load Calculations 1.5 3 358 07 61 15.00 20 Manufacturer's Field Inspection 3.5 3 359 07 61 15.00 20 Structural Performance 1.3.2.5 3 360 07 61 15.00 20 Panel Finish 1.6.6 3 361 07 61 15.00 20 Technical Representative 1.6.2 3 362 07 61 15.00 20 Qualification of Installer 1.6.3 3 363 07 61 15.00 20 Coil Stock 2.1.1.5 3 364 07 61 15.00 20 Installation 3.3 3 365 07 61 15.00 20 Sealant 2.3.3 3 366 07 61 15.00 20 Warranty 1.8 3 367 07 61 15.00 20 Information Card 3.7 3

368 07 84 00 Firestopping System 2.1 3 369 07 84 00 Firestopping Materials 2.2 3 370 07 84 00 Inspection 3.3 3 371 07 84 00 Firestopping Materials 2.2 3 372 07 84 00 Installer Qualifications 1.5.1 3 373 07 84 00 Inspector Qualifications 1.5.2 3

374 07 92 00 Sealants 2.1 3 375 07 92 00 Primers 2.2 3 376 07 92 00 Bond Breakers 2.3 3 377 07 92 00 Backstops 2.4 3

378 08 11 13 Doors 2.1 3 379 08 11 13 Doors 2.1 3 380 08 11 13 Accessories 2.3 3 381 08 11 13 Frames 2.5 3 382 08 11 13 Frames 2.5 3 383 08 11 13 Doors 2.1 3 384 08 11 13 Accessories 2.3 3 385 08 11 13 Frames 2.5 3

386 08 11 16 Door and Frame Assembly 1.5.1 3 387 08 11 16 Door and Frame Assembly 1.5.1 3 388 08 11 16 Finish Samples 1.5.2 3 389 08 11 16 Air Infiltration 1.2.2 3 390 08 11 16 Water Penetration 1.2.3 3 391 08 11 16 NFRC Project Label Certificates for Fenestration 1.2.4 3 392 08 11 16 NFRC Project Label Certificates for Fenestration 1.2.4 3 393 08 11 16 Door and Frame Assembly 1.5.1 3 394 08 11 16 Adjustments, Cleaning, and Maintenance 1.5.3 3

395 08 31 00 Access Doors And Panels 1.3 3 396 08 31 00 Access Doors And Panels 1.3 3 397 08 31 00 Hardware 1.3.2 3 398 08 31 00 Accessories 2.1.7 3

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

399 08 31 00 Finishes 2.4 3 400 08 31 00 Fire-rating(s) of Assemblies 1.3.1 3

401 08 33 13 Detail Drawings 1.3 3 402 08 33 13 Warranty 1.5 3 403 08 33 13 Coiling Counter Doors 2.1 3 404 08 33 13 Installation 3.1 3 405 08 33 13 Cleaning 3.3 3 406 08 36 13 Doors 2.2 3 407 08 36 13 Doors 2.2 3 408 08 36 13 Electric Operators 2.6 3 409 08 36 13 Doors 2.2 3 410 08 36 13 Doors 2.2 3

411 08 41 13 Sample Warranty 1.2.1 3 412 08 41 13 List of Product Installations 1.2.1 3 413 08 41 13 Fabrication Drawings 2.2 3 414 08 41 13 Installation Drawings 3.3 3 415 08 41 13 Manufacturer's Catalog Data 1.2.1 3 416 08 41 13 Recycled Content of Aluminum Material 2.1.1.2 3 417 08 41 13 Finish 2.2.3 3 418 08 41 13 Finish and Color Samples 1.2.1 3 419 08 41 13 Certified Test Reports 1.2.1 3 420 08 41 13 Air Infiltration 3.4.1 3 421 08 41 13 Deflection 3.4.3 3 422 08 41 13 Condensation Resistance and Thermal Transmittance 3.4.4 3 423 08 41 13 Water Infiltration 3.4.5 3 424 08 41 13 Manufacturer's Instructions 3.3 3 425 08 41 13 Manufacturer's Product Warranty 3.6 3

426 08 51 13 Fabrication Drawings 1.6 3 427 08 51 13 Windows 2.1 3 428 08 51 13 Window Performance 1.7 3 429 08 51 13 Windows 2.1 3 430 08 51 13 Thermal-Barrier Windows 2.3 3 431 08 51 13 Thermal Performance 1.7.5 3 432 08 51 13 Weatherstripping 2.1.4 3 433 08 51 13 Fasteners 2.2.2 3 434 08 51 13 Adhesives 2.2.3 3 435 08 51 13 Accessories 2.2.5 3 436 08 51 13 Hardware 2.2.5.1 3 437 08 51 13 Finish Sample 1.3.3.1 3 438 08 51 13 Window Sample 1.3.3.2 3 439 08 51 13 Structural Calculations for Deflection 2.1 3 440 08 51 13 Design Analysis 1.3.4 3 441 08 51 13 Minimum Condensation Resistance Factor 1.3.5 3 442 08 51 13 Windows 2.1 3

443 08 71 00 Manufacturer's Detail Drawings 1.3 3 444 08 71 00 Verification of Existing Conditions 1.3 3 445 08 71 00 Hardware Schedule 1.5 3 446 08 71 00 Keying System 2.3.8 3 447 08 71 00 Hardware Items 2.3 3 448 08 71 00 Installation 3.1 3

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 33 13 COILING COUNTER DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES ANDSTOREFRONTS

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

449 08 71 00 Hardware Schedule 1.5 3 450 08 71 00 Key Bitting 1.6.1 3

451 08 81 00 Glazing Accessories 1.3 3 452 08 81 00 Insulating Glass 2.2 3 453 08 81 00 Sealants 2.3.3.1 3 454 08 81 00 Insulating Glass 2.2 3 455 08 81 00 Glazing Compound 2.3.2 3 456 08 81 00 Tape 2.3.5 3 457 08 81 00 Sealing Tapes 2.3.5 3 458 08 81 00 Setting and Sealing Materials 2.3 3 459 08 81 00 Glass Setting 3.2 3 460 08 81 00 Insulated Glass Units 1.7.1 3

461 08 91 00 Wall Louvers 1.4 3 462 08 91 00 Metal Wall Louvers 2.2 3 463 08 91 00 Door Louvers 2.3 3 464 08 91 00 Wall Louver Samples 1.5 3 465 08 91 00 Door Louver Samples 1.5 3

466 09 22 00 Metal Support Systems 2.1 3 467 09 22 00 Metal Support Systems 2.1 3

468 09 29 00 Gypsum Board 2.1.1 3 470 09 29 00 Cementitious Backer Units 2.1.2 3 471 09 29 00 Accessories 2.1.5 3 472 09 29 00 Asbestos Free Materials 2.1 3

473 09 30 10 Detail Drawings 3.2 3 474 09 30 10 Transition Strips 2.1 3 475 09 30 10 Setting-Bed 2.2 3 476 09 30 10 Mortar, Grout, and Adhesive 2.4 3 477 09 30 10 Waterproof Membrane 2.7 3 478 09 30 10 Crack Isolation Membrane 2.8 3 479 09 30 10 Porcelain Tile 2.1.1 3 480 09 30 10 Glazed Ceramic Wall Tile 2.1.2 3 481 09 30 10 Reinforcing Wire Fabric 2.2.6 3 482 09 30 10 Transition Strips 2.6.1 3 483 09 30 10 Metal Strips 2.6.2 3 484 09 30 10 Tile 2.1 3 485 09 30 10 Accessories 2.1 3 486 09 30 10 Transition Strips 2.1 3 487 09 30 10 Accessories 2.1.3 3 488 09 30 10 Grout 2.4.2 3 489 09 30 10 Transition Strips 2.6.1 3 490 09 30 10 Metal Strips 2.6.2 3 491 09 30 10 Manufacturer's Approved Cleaning Instructions 3.7 3 492 09 30 10 Transition Strips 2.1 3 493 09 30 10 Porcelain Tile 2.1.1 3 494 09 30 10 Glazed Ceramic Wall Tile 2.1.2 3 495 09 30 10 Transition Strips 2.6.1 3 496 09 30 10 Metal Strips 2.6.2 3

497 09 51 00 Approved Detail Drawings 2.1 3

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

498 09 51 00 Acoustical Units 2.2 3 499 09 51 00 Acoustical Performance 2.1.1 3 500 09 51 00 Acoustical Units 2.2 3

501 09 64 66 Hardwood Strip Flooring 2.1 3 502 09 64 66 Hardwood Strip Flooring 2.1 3 503 09 64 66 Strip Flooring 2.2.1 3 504 09 64 66 Steel Channels and Clips 2.2.2 3 505 09 64 66 Cushions and Pads 2.2.3 3 506 09 64 66 System 2.1 3 507 09 64 66 Strip Flooring 2.2.1 3

508 09 65 00 Resilient Flooring and Accessories 2.9 3 509 09 65 00 Vinyl Composition Tile 2.1 3 510 09 65 00 Luxury Vinyl Tile 2.2 3 511 09 65 00 Wall Base 2.3 3 512 09 65 00 Adhesives 2.5 3 513 09 65 00 Resilient Flooring and Accessories 2.9 3 514 09 65 00 Moisture, Alkalinity and Bond Tests 3.3 3 515 09 65 00 Installation 3.1 3 516 09 65 00 Surface Preparation 3.2 3 517 09 65 00 Resilient Flooring and Accessories 2.9 3

518 09 65 66 Approved Detail Drawings 3.3.3.1 3 519 09 65 66 Installation 3.3 3 520 09 65 66 Flooring 1.3.8 3 521 09 65 66 Laboratory Test Results 1.3.4 3 522 09 65 66 Warranty 1.5 3

523 09 84 20 Approved Detail Drawings 2.2 3 524 09 84 20 Acoustical Wall Panels 2.2 3 525 09 84 20 Installation 3.2 3 526 09 84 20 Acoustical Wall Panels 2.2 3 527 09 84 20 Acoustical Wall Panels 2.2 3 528 09 84 20 Warranty 1.4 3

529 09 90 00 Paint 2.1 3 530 09 90 00 Paint 2.1 3 531 09 90 00 Paint 2.1 3 532 09 90 00 Paint 2.1 3 533 09 90 00 Mildewcide and Insecticide 2.1.3 3 534 09 90 00 Lead 2.1.4 3 535 09 90 00 Volatile Organic Compound (VOC) Content 2.1.6 3

536 10 14 00.20 Detail Drawings 1.4.2 3 537 10 14 00.20 Room Identification And Directional Signage System 2.1 3 538 10 14 00.20 Exit Door Tactile Sign 2.2 3 539 10 14 00.20 Building Directories 2.3 3 540 10 14 00.20 Door Tags 2.4 3 541 10 14 00.20 Room Identification And Directional Signage System 2.1 3 542 10 14 00.20 Exit Door Tactile Sign 2.2 3 543 10 14 00.20 Building Directories 2.3 3 544 10 14 00.20 Door Tags 2.4 3 545 10 14 00.20 Interior Signage 1.4.1 3

09 90 00 PAINTING, GENERAL

10 14 00.20 INTERIOR SIGNAGE

09 64 66 WOOD ATHLETIC FLOORING

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 84 20 ACOUSTICAL WALL PANELS

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

546 10 14 00.20 Approved Manufacturer's Instructions 3.1 3 547 10 14 00.20 Protection and Cleaning 3.1.2 3

548 10 21 13 Fabrication Drawings 2.1 3 549 10 21 13 Installation Drawings 3.3 3 550 10 21 13 Cleaning and Maintenance Instructions 2.1 3 551 10 21 13 Colors And Finishes 2.7 3 552 10 21 13 Painted Metal 2.2.1 3 553 10 21 13 Sound-Deadening Cores 2.2.2 3 554 10 21 13 Anchoring Devices and Fasteners 2.2.3 3 555 10 21 13 Brackets 2.2.4 3 556 10 21 13 Finishes 2.2.5.2 3 557 10 21 13 Door Hardware 2.2.6 3 558 10 21 13 Finishes 2.7.2 3 559 10 21 13 Colors and Finishes 2.7 3 560 10 21 13 Hardware and Fittings 2.2.5 3 561 10 21 13 Warranty 1.5 3

562 10 22 13 Wire Mesh Partitions 1.4 3 563 10 22 13 Wire Mesh Partitions 1.4 3

564 10 22 26.23 Manufacturer's Qualifications 1.3.1 3 565 10 22 26.23 Manufacturer's Sample Warranty 1.3.1 3 566 10 22 26.23 Statement of Code Compliance 1.3.1 3 567 10 22 26.23 Statement of Standards Conformity 1.3.1 3 568 10 22 26.23 Verification of Field Measurements 1.3.1 3 569 10 22 26.23 Statement of Code Compliance 3.1.1 3 570 10 22 26.23 Statement of Standards Conformity 3.1.1 3 571 10 22 26.23 coiling grilles 2.1 3 572 10 22 26.23 Fabrication Drawings 1.3.1 3 573 10 22 26.23 Installation Drawings 1.3.1 3 574 10 22 26.23 Finish Hardware 1.3.2 3 575 10 22 26.23 Accessories 1.3.2 3 576 10 22 26.23 Suspension System 2.3.2 3 577 10 22 26.23 Coiling Partition Layouts 3.1.1 3 578 10 22 26.23 Finish Hardware 1.3.2 3 579 10 22 26.23 Ceiling Guard 1.3.2 3 580 10 22 26.23 Pull-In Latch 1.3.2 3 581 10 22 26.23 Framework 2.3.1 3 582 10 22 26.23 Suspension System 2.3.2 3 583 10 22 26.23 Coiling Partitions 1.3.1 3 584 10 22 26.23 Coiling Partitions 3.1.1 3 585 10 22 26.23 Manufacturer's Guarantee 1.3.3 3

586 10 26 00 Corner Guards 2.2 3 587 10 26 00 Door Protectors 2.3 3 588 10 26 00 Corner Guards 2.2 3 589 10 26 00 Door Protectors 2.3 3 590 10 26 00 Corner Guards 2.2 3 591 10 26 00 Door Protectors 2.3 3 592 10 26 00 Corner Guards 2.2 3 593 10 26 00 Door Protectors 2.3 3

594 10 28 13 Product Schedule 2.1 3

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 26.23 COILING GRILLES

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

595 10 28 13 Item A5135 2.1.10 3 596 10 28 13 Item A5140 2.1.11 3 597 10 28 13 Item A5170 2.1.12 3 598 10 28 13 Item A5200 2.1.13 3 599 10 28 13 Hand Sanitizer Dispenser 2.1.14 3 600 10 28 13 Toilet Seat Cover Dispenser 2.1.15 3 601 10 28 13 Item A4995 2.1.3 3 602 10 28 13 Item A5030 2.1.4 3 603 10 28 13 Item A5074 2.1.5 3 604 10 28 13 Item A5080a 2.1.6 3 605 10 28 13 Item A5090 2.1.7 3 606 10 28 13 Item A5109 2.1.8 3 607 10 28 13 Item A5110 2.1.9 3 608 10 28 13 Diaper Changing Stations 1.3.1 3 609 10 28 13 Item A5135 2.1.10 3 610 10 28 13 Item A5140 2.1.11 3 611 10 28 13 Item A5170 2.1.12 3 612 10 28 13 Item A5200 2.1.13 3 613 10 28 13 Hand Sanitizer Dispenser 2.1.14 3 614 10 28 13 Toilet Seat Cover Dispenser 2.1.15 3 615 10 28 13 Item A4995 2.1.3 3 616 10 28 13 Item A5030 2.1.4 3 617 10 28 13 Item A5074 2.1.5 3 618 10 28 13 Item A5080a 2.1.6 3 619 10 28 13 Item A5090 2.1.7 3 620 10 28 13 Item A5109 2.1.8 3 621 10 28 13 Item A5110 2.1.9 3

622 10 44 16 Fire Extinguishers 2.1.1 3 623 10 44 16 Wall Brackets 2.2.2 3 624 10 44 16 Accessories Part 2 3 625 10 44 16 Cabinets Part 2 3 626 10 44 16 Fire Extinguishers 2.1.1 3 627 10 44 16 Wall Brackets 2.2.2 3 628 10 44 16 Replacement Parts List 3.2.1 3 629 10 44 16 Accessories Part 2 3 630 10 44 16 Cabinets Part 2 3 631 10 44 16 Equipment Samples 1.3.1 3 632 10 44 16 Manufacturer's Warranty with Inspection Tag 1.4 3 633 10 44 16 Fire Extinguishers Certifications 2.1.1 3

634 10 51 13 Location 1.4 3 635 10 51 13 Fabrication Drawings 2.1 3 636 10 51 13 Types 2.2 3 637 10 51 13 Installation 3.1 3 638 10 51 13 Material 2.3 3 639 10 51 13 components 2.4 3 640 10 51 13 Assembly 3.1 3 641 10 51 13 Plastic Identification 2.1.1 3 642 10 51 13 Finish 2.4.1.2 3 643 10 51 13 Handles 2.4.4 3 644 10 51 13 Color chips 1.5.1 3

645 12 35 30.23 20 Vanities 2.1 3

10 44 16 FIRE EXTINGUISHERS

10 51 13 PLASTIC LOCKERS

12 35 30.23 20 BATHROOM CASEWORK

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

646 12 48 13 Installation Drawings 3.2 3 647 12 48 13 Detail Drawings 3.2 3 648 12 48 13 Entrance Floor Mats and Frames 2.1.1 3 649 12 48 13 Adhesives and Concrete Primers 2.1.2 3 650 12 48 13 Entrance Floor Mats and Frames 2.1.1 3 651 12 48 13 Manufacturer's Instructions 3.2 3 652 12 48 13 Protection, Maintenance, and Repair Information 3.2 3

653 21 13 13 Qualified Fire Protection Engineer (QFPE) 1.2.3 3 654 21 13 13 Sprinkler System Designer 1.4.2.1 3 655 21 13 13 Sprinkler System Installer 1.4.2.2 3 656 21 13 13 Shop Drawing 1.2.1.1 3 657 21 13 13 Backflow Prevention Assembly 2.5 3 658 21 13 13 Fire Department Connection 2.6 3 659 21 13 13 Sprinklers 2.7 3 660 21 13 13 Nameplates 2.1.2 3 661 21 13 13 Pipe 2.2.1 3 662 21 13 13 Fittings 2.3.1.2 3 663 21 13 13 Pipe Hangers and Supports 2.3.3 3 664 21 13 13 Seismic Bracing 2.3.3 3 665 21 13 13 Valves 2.3.4 3 666 21 13 13 Sprinkler Alarm Switch 2.4.1 3 667 21 13 13 Valve Supervisory (Tamper) Switch 2.4.2 3 668 21 13 13 Hose Valve 2.5.1 3 669 21 13 13 Relief Valves 2.8.5 3 670 21 13 13 Air Vent 2.8.6 3 671 21 13 13 Hydraulic Calculations 1.2.1.2 3 672 21 13 13 Seismic Bracing 2.3.3 3 673 21 13 13 Test Procedures 3.7.1 3 674 21 13 13 Verification of Compliant Installation 3.7.2.1 3 675 21 13 13 Request for Government Final Test 3.7.2.2 3 676 21 13 13 Spare Parts 1.6 3 677 21 13 13 Operating and Maintenance (O&M) Instructions 3.9 3 678 21 13 13 As-built drawings 3.9 3

679 22 00 00 Plumbing System 3.8.1 3 680 22 00 00 Fixtures 2.4 3 681 22 00 00 Pumps 2.9 3 682 22 00 00 Vibration-Absorbing Features 3.3 3 683 22 00 00 Drinking-Water Coolers 2.4.10 3 684 22 00 00 Plastic Shower Stalls 2.4.13 3 685 22 00 00 Flush Valve Water Closets 2.4.3 3 686 22 00 00 Flush Valve Urinals 2.4.4 3 687 22 00 00 Flush Tank Water Closets 2.4.5 3 688 22 00 00 Wall Hung Lavatories 2.4.6 3 689 22 00 00 Countertop Lavatories 2.4.7 3 690 22 00 00 Kitchen Sinks 2.4.8 3 691 22 00 00 Service Sinks 2.4.9 3 692 22 00 00 Shower Faucets 2.6.2 3 693 22 00 00 Plumbing System 3.8.1 3 694 22 00 00 Backflow Prevention Assemblies 3.8.1.1 3 695 22 00 00 Tests, Flushing and Disinfection 3.8 3 696 22 00 00 Test of Backflow Prevention Assemblies 3.8.1.1 3

22 00 00 PLUMBING, GENERAL PURPOSE

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

697 22 00 00 Materials and Equipment 1.3 3 698 22 00 00 Bolts 2.1.1 3 699 22 00 00 Plumbing System 3.8.1 3

700 22 07 19.00 40 Installation Drawings 3.1 3 701 22 07 19.00 40 Adhesives 2.3 3 702 22 07 19.00 40 Coatings 2.3 3 703 22 07 19.00 40 Insulating Cement 2.3 3 704 22 07 19.00 40 Insulation Materials 2.3 3 705 22 07 19.00 40 Jacketing 2.3 3 706 22 07 19.00 40 Tape 2.3 3 707 22 07 19.00 40 Installation Manual 3.1 3 708 22 07 19.00 40 Adhesives 2.3 3 709 22 07 19.00 40 Coatings 2.3 3 710 22 07 19.00 40 Insulation Materials 2.3 3 711 22 07 19.00 40 Record Drawings 3.4 3 712 22 07 19.00 40 Recycled Materials 1.3.1 3

713 23 05 15 Material, Equipment, and Fixture Lists 1.2 3 714 23 05 15 Record Drawings 1.2 3 715 23 05 15 Coordination Drawings 1.2 3 716 23 05 15 Pipe and Fittings 2.1 3 717 23 05 15 Piping Specialties 2.2 3 718 23 05 15 Valves 2.3 3 719 23 05 15 Miscellaneous Materials 2.4 3 720 23 05 15 Supporting Elements 2.5 3 721 23 05 15 Surface Resistance 3.1 3 722 23 05 15 Shear and Tensile Strengths 3.1 3 723 23 05 15 Temperature Ratings 3.1 3 724 23 05 15 Bending Tests 3.1 3 725 23 05 15 Flattening Tests 3.1 3 726 23 05 15 Transverse Guided Weld Bend Tests 3.1 3 727 23 05 15 Record of Satisfactory Field Operation 1.4.2 3 728 23 05 15 List of Qualified Permanent Service Organizations 1.4.3 3 729 23 05 15 Operation and Maintenance Manuals 3.8 3

730 23 05 48.00 40 Installation Drawings 1.2 3 731 23 05 48.00 40 Outline Drawings 1.2 3 732 23 05 48.00 40 Equipment and Performance Data 1.2 3 733 23 05 48.00 40 Isolators 2.2.7 3 734 23 05 48.00 40 Type of Isolator 2.4 3 735 23 05 48.00 40 Type of Base 2.4 3 736 23 05 48.00 40 Allowable Deflection 2.4 3 737 23 05 48.00 40 Measured Deflection 2.4 3

738 23 05 48.19 Equipment Restraint 2.2 3 739 23 05 48.19 Coupling and Bracing 3.1 3 740 23 05 48.19 Flexible Couplings or Joints 3.3 3 741 23 05 48.19 Contractor Designed Bracing 1.2.4 3 742 23 05 48.19 Equipment Restraint 2.2 3 743 23 05 48.19 Snubbers 2.6 3 744 23 05 48.19 Coupling and Bracing 3.1 3 745 23 05 48.19 Flexible Couplings Or Joints 3.3 3 746 23 05 48.19 Anchor Bolts 3.9 3

22 07 19.00 40 PLUMBING PIPING INSULATION

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 48.19 SEISMIC BRACING FOR HVAC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

747 23 05 48.19 Contractor Designed Bracing 1.2.4 3 748 23 05 48.19 Vibration Isolators 2.2.2 3 749 23 05 48.19 Design Calculations 1.2.4 3 750 23 05 48.19 Anchor Bolts 3.9 3

751 23 05 93 TAB Team Assistants 1.2 3 752 23 05 93 TAB Team Engineer 1.2 3 753 23 05 93 TAB Team Field Leader 1.2 3 754 23 05 93 TAB Firm 1.5.3.1 3 755 23 05 93 TAB Specialist 1.5.3.2 3 756 23 05 93 TAB Schematic Drawings and Report Forms 1.3.3 3 757 23 05 93 Equipment and Performance Data 1.3 3 758 23 05 93 TAB Procedures 1.5.2 3 759 23 05 93 Calibration 1.5.2 3 760 23 05 93 TAB Related HVAC Submittals 1.5.3.4 3 761 23 05 93 TAB Execution 1.5.4 3 762 23 05 93 TAB Verification 1.5.4.3 3 763 23 05 93 TAB Report for Season 1 1.5.5.2 3 764 23 05 93 TAB Report for Season 2 1.5.5.2 3 765 23 05 93 TAB Design Review Report 1.6.1.1 3 766 23 05 93 Completed Pre-Final DALT Report 3.3.5 3 767 23 05 93 Certified Final DALT Report 3.3.8 3 768 23 05 93 Independent TAB Agency and Personnel Qualifications 1.5.1 3 769 23 05 93 TAB Firm 1.5.3.1 3 770 23 05 93 Design Review Report 1.5.4.3 3 771 23 05 93 DALT and TAB Submittal and Work Schedule 1.6.1 3 772 23 05 93 Advanced Notice for Season 1 TAB Field Work 1.6.1 3 773 23 05 93 Prerequisite HVAC Work Check Out List For Season 1 1.6.1 3 774 23 05 93 Advanced Notice for Season 2 TAB Field Work 1.6.1 3 775 23 05 93 Prerequisite HVAC Work Check Out List For Season 2 1.6.1 3 776 23 05 93 Pre-field DALT Preliminary Notification 1.6.1.2 3 777 23 05 93 TAB Pre-Field Engineering Report 1.6.1.3 3

778 23 07 00 Pipe Insulation Systems 2.3 3 779 23 07 00 Pipe Insulation Systems 3.2 3 780 23 07 00 Duct Insulation Systems 3.3 3 781 23 07 00 Equipment Insulation Systems 3.4 3 782 23 07 00 MICA Plates 3.2.2.4 3 783 23 07 00 Pipe Insulation Systems 2.3 3 784 23 07 00 Pipe Insulation Systems 3.2 3 785 23 07 00 Duct Insulation Systems 3.3 3 786 23 07 00 Equipment Insulation Systems 3.4 3 787 23 07 00 Indoor air quality for adhesives 2.2.1 3

788 23 09 00 DDC Contractor Design Drawings 3.2 3 789 23 09 00 Draft As-Built Drawings 3.2 3 790 23 09 00 Final As-Built Drawings 3.2 3 791 23 09 00 Manufacturer's Product Data 2.2 3 792 23 09 00 Configuration Software 1.8.1 3 793 23 09 00 Controller Configuration Settings 1.8.2 3 794 23 09 00 Programming Software 1.8.3 3 795 23 09 00 Controller Application Programs 1.8.4 3 796 23 09 00 Pre-Construction Quality Control (QC) Checklist 1.9.1 3 797 23 09 00 Post-Construction Quality Control (QC) Checklist 1.9.2 3

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

SH

O

P D

R

AW

IN

G

S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R

U C

TI

O

N S

M

AN

U

FA

C

TU

R E'

S

FI

EL

D

R

EP

O R

T

O

PE

R

AT

IO

N

A N

D M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

S

U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

2 APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO.

PROJECT NO.

PROJECT TITLE Add / Repair Fitness Center, B622

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SE

C

TI

O

N N

U M

BE

R

SE

C

TI

O

N N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

798 23 09 00 Start-Up Testing Report 3.4.2 3 799 23 09 00 PVT Procedures 3.5.1 3 800 23 09 00 PVT Report 3.5.3 3 801 23 09 00 Equipment Supplier’s Performance Verification Testing 3.6.3.1 3 802 23 09 00 Control Contractor’s Performance Verification Testing Plan 3.6.5 3 803 23…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .