FA520525R0002_Atch7_List of Contractor-Furnished US Material_5Feb25.pdf
PDF 228 KB Posted
- Solicitation number
- FA520525R0002
About this file
This document is a List of Contractor Furnished U.S. Material (CFUSM) for a design and renovation project at the Misawa Air Base Fitness Center (Building 622) in Japan. The list itemizes 12 specific materials and equipment to be provided by the contractor, including electrical components (36 ground fault current interrupt outlets), telecommunications equipment (3 Cisco 7300 switches), emergency systems (62 emergency lighting units, fire alarm components, UPS system), mechanical components (sprinkler system parts, backflow preventors, drinking fountains), and building materials (mineral fiber insulation, STC-rated interior doors).
The document includes two critical notes: first, that transportation of these items must comply with DFARS 252.247-7023 for transportation of supplies by sea, and second, a provision regarding the disposition of surplus materials. If surplus contractor-furnished materials exempted from Japanese customs duties are retained by the contractor, they must fully disclose the settlement to local government customs authorities and be responsible for applicable duties and taxes. The document is an attachment (Attachment 7) to Request for Proposal No. FA520525R0002, dated 5 February 2025, for the Misawa Air Base Fitness Center renovation project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF CONTRACTOR FURNISHED U.S. MATERIAL (CFUSM)
Project No. & Title: #1072264 (QKKA171017), Design – Add/Repair Fitness Center, B622, Misawa Air Base, Japan
NOTE:
a. Transportation of these items shall be in accordance with Section I, Contract Clause
DFARS 252.247-7023, Transportation of Supplies by Sea (OCT 2024).
b. Disposition of Surplus U.S. Materials, Supplies or Equipment:
In the event the U.S. Government and contractor agree that title to any surplus contractor-furnished U.S. Materials, supplies or equipment which have been exempted from Japanese
Custom Duties or Taxes pursuant to Article XI of the Status of Forces Agreement will remain with the contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the contractor. The contractor further agrees to make a full disclosure of such settlement to the local Government customs authorities for the payment of applicable duties and taxes.
Item No. Nomenclature Quantity Unit of Issue
001 Ground fault current interrupt outlets 36 EA
002 Telecommunication Switch; Cisco 7300 3 EA
003 EMCS System; Cabinet-mounted UPS 1 EA
004 Emergency Lighting 62 EA
005 Sprinkler system components (not to include piping) 300 EA
006 Fire Alarm Mass notification system components 200 EA
007 Dual-level drinking fountains / bottle fillers 1 EA
008 Reduced Pressure Zone Backflow Preventors 4 EA
009 Washing machine connection box 1 EA
010 Ice machine connection box 1 EA
011 Mineral fiber blanket (batt) insulation 1420 m2
012 STC-rated interior doors including sound-reduction hardware elements (102.1, 105.1, 105.2, 113, 115)
5 EA
Attachment 7 to RFP No. FA520525R0002 Date: 5 Feb 25