Attachment 1
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-Proposal Conference / Site Visit Project No. QKKA 13-3001-P1
Improve Military Family Housing (IMFH), Weatherization Phase I
RFP No. FA5205-15-R-0008
35 CONS/LGCP
35 CES/CENM
21 Apr 15
0900 hrs
Summary
Scope & Requirements General Requirement / Pricing Structure
RFP
CONS remarks for solicitation / filling instructions
CES tech briefing (Specs and Drwg)
Q&A Session
Site Visit to MFH area (see next slides)
Summary
Attachment 2
Misawa Air Base Map
Scope & Requirements
Scope & Requirements
Project Description (Sec B):
Weatherization Phase IA – Improve weatherization to 1,012 MFH units (185 bldgs, 4 twrs)
Weatherization Phase IB – Improve weatherization and A/C installation to 208 MFH units (58 bldgs)
Place: Main / North MFH area, Misawa AB, Japan
Contract Type: Firm-Fixed-Price
Performance Period: 700 CD (incl. 30 CD for mobilization)
Scope & Requirements
Solicitation
RFPComplete block 14, 15, 16, 17, 18, 19 & 20.
Fill-in
RFP
RFP - Page 2
Proposal of CLIN Amounts
Solicitation
RFP - Page 3
Fill-in
See Exhibit A
Proposal of CLIN Amounts (Cont’d)
Solicitation
RFP - Page 4
See Exhibit B
Fill-in
Fill IA Base Bid (CLIN 0001), 1B Base Bid (CLIN 0002) & Total Amount (CLINs 0001 – 0002)
CLIN & Exhibit Structure
Solicitation
Exhibit A
ELIN A001
Sub-ELIN A001AA - A001BB
CLIN 0001
CLIN 0002
Exhibit B
ELIN B001
Sub-ELIN B001AA - B001AM
Exhibit A & B – Base Bid
Solicitation
Unit price / Extended amount
Fill offeror’s name, address, signature, seal/han
Fill-in
See RFP Atch. 3 for Ref.
Total amount
Adobe Acrobat Document
Section F:
52.211-12 Liquidated Damages @¥146,076 (1st day ) & @¥130,622 (2nd day ~ )
F-901 Performance Period (PP)
PP: 700 CD (incl. 30 CD mobilization)
NTP: Within 30 CD after the date of contract award
Solicitation
RFP - Page 8
Section H:
H-901 Required Insurance Property Damage - ¥2,000,000
H-902 Performance Bond Amount Required: 100% of awarded contract amt.
Submission: Within 30 CD after contract award
Required add’l if Mod >$10K
Japanese Yen or U.S. dollar equivalent to yen-based contract amount accompanying the surety’s separate certification
FAR 52.228-15 as modified, Sec. I, page 15
Solicitation
RFP - Page 10 - 11
Section I
52.223-3 Hazardous Material
Section J
List of Documents, Exhibit & Other Attachments Atch 1: Specifications
Atch 2: Drawings
Atch 3: Exhibit A and B
Atch 4: Past Performance Questionnaire (PPQ) Cover Letter
Atch 5: Past/Present Performance Questionnaire (PPQ)
Atch 6: IMFH Weatherization Phase I Construction Timeline
Atch 7: Schedule of Material Submittals
Atch 8: Acceptable Japanese Product Substitutes
Atch 9: Manufacturer’s Cut Sheet/Catalog Information
Solicitation
Fill-in
RFP - Page 12 - 23
RFP - Page 24
Section K
FAR 52.204-8 Annual Reps & Certs
FAR 52.209-7 Responsibility Matters Info
DFARS 252.204-7007 Alt. A Annual Reps & Certs
DFARS 252.247-7022 Transportation by Sea
K-800 Tax Exemption under SOFA
K-900 Contractor’s Cert
K-901 Construction Contractor License
Fill-in
Fill-in
Fill-in
Solicitation
Fill-in
Fill-in
Submit
RFP - Page 25 - 33
Fill-in
Solicitation
Section K (cont’d)
K-901 CONSTRUCTION CONTRACTOR LICENSE
Offeror shall submit 7 copies of “special construction license” under applicable law of Japan together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042.
Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offeror.
Such offeror that fails in representation of the above required license will not be considered for award.
Submit
Section L
L-100 Proposal Preparation Instructions
Offer required to meet all sol. requirements, terms & conditions, reps & certs, & tech requirements
Prepare & Submit:
Part I – Summary & Misc. Data (Submit Orig. + 2 Copies)
Part II – Price Proposal (Submit Orig.)
Part III – Past Performance Proposal (Submit Orig. + 7 copies)
Solicitation
Submit
RFP - Page 34 - 39
Section M
M-900 Basis of Award & Evaluation
Weight of Importance:
Past Performance is approximately equal to price
Evaluation Process:
Step 1. Price – Fairness and Reasonableness of price and price realism analysis
Step 2. Past Performance – Recent and Relevant performance information
Solicitation
RFP - Page 40 - 41
Section M (Cont’d)
Past Performance Factor
Recency: Work within the last 3-Yr
Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation.
Integrated Assessment
The Gov’t reserves the right to award contract to other than the lowest price offeror if the difference in PP confidence rating of another offeror justifies the higher price premium.
Solicitation
Technical Briefing
CES Technical Briefing
Description of Work Requirement:
Install multi-split heat pump system in 208 MFH units
Provides energy efficient heating system Provides energy efficient air conditioning Provides de-humidifier function
Provide facility weatherization upgrades to 1,220 MFH units (includes 208 units noted above)
Install new energy efficient windows/doors Install solar film to existing windows (towers) Add roof insulation, as required
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Misawa AB, Japan
35 CES Personnel Mr. Daniel Erickson (PM)
Lt Shane Lockridge (PM)
Mr. Rocky Hartley (PM)
Mr. Yasuhiro Yonaiyama (35 CES Architect)
Mr. Fujio Harada (35 CES Engineer)
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Misawa AB, Japan
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Travel Route (Approx 2hrs):
1. Start: B656
2. B111 (3B) Inner Window Installation
3. B329 (4B) Window and Roof Repair, including Roof Vent Removal
4. B174 (ADA) Window
5. B2109 (SOQ) Window Film and Heat Pump Installation
6. B1813 (4B) Window/Roof and Heat Pump Installation
7. B1846 (2B) Window and Heat Pump Installation
8. Tower 1937 (8H) Heat Pump Installation Sample (Past Project)
9. Phantom Court Heat Pump Installation Sample (Past Project)
10. End: B656
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Misawa AB, Japan
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Questions???
QKKA 13-3001-P1, Improve Military Family Housing (IMFH), Weatherization Phase I, Misawa AB, Japan
Let’s move on to Site Visit but please remind
RFP Closing Date / Time:
2 Jun 15 / 02:30 PM (JST)
Questions shall be submitted to 35 CONS/LGCP NLT 30 Apr 15 (JST)
Bldg. 2109 Exterior