QKKA 13-3001-P1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Schedule.
POC: Miyako Fujimoto, Contracting Officer/Comm Ph: 0176-77-2171
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5205-15-R-0008
X 9B. DATED (SEE ITEM 11)
10-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jun-2015
CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5205-15-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
This amendment is issued to incorporate Addendum No. 1 dated 17 Jun 15 and “Consolidated List of the Government Response/Clarification” dated 17 Jun 15 into the subject solicitation based on the questionnaires submitted by the prospective offerors. In association with the changes of Addendum No. 1, the closing time and date of the subject solicitation is extended.
(a) By incorporating Addendum No. 1 (Attachment 1 to this Amendment) and “Consolidated List of the
Government Response/Clarification”, the following changes are provided to the solicitation.
(1) Section J.
(A) Attachment 1, Specifications. Sections 00001, 01 11 00, 01 11 10, 01 11 20, 06 20 00, 08 51 15, 08 87 13, 23 05 15, and 23 82 02 are revised or added; therefore, replaced or added with attached specification sections dated 17 Jun 15 (Attachment 2 to this Amendment).
(B) Attachment 2, Drawings. Following drawing sheets are revised; therefore, replaced with attached drawings dated 17 Jun 15 (Attachment 3 to this Amendment).
Phase 1A
G-002 G-003 A-002 A-003 A-004 A-005 6-AD101
6-AE101 6-AE201 6A-AD101 6A-AE101 6A-AE201 7-AD101 7-AE101
7-AE102 7-AE201 7A-AD101 7A-AE101 7A-AE201 12J-AD101 12J-AE101
15N-AD101 15N-AE101 16N-AD101 A-501 A-503 A-601 A-602
Phase 1B
G-002 G-003 A-002 1-AE102 1-AE201 1-AE202 4-AD101
4-AE101 4-AE102 4-AE201 4A-AD101 4A-AE101 4A-AE102 4A-AE201
5-AE102R 5A-AE101 5A-AE102 6A-AD101 6A-AD201 6A-AE101 6A-AE201
A-501 A-502 A-601 1-MH101 2-MH101 3-MH101 4-MH101
4A-MH101 5-MH101 1-EP101 1-E601 2-EP101 2-E601 3-EP101
3-E601 4-EP101 4-E601 4A-EP101 4A-E601 5-EP101 5-E601
5A-EP101 5A-E601 6-EP101 6-E601 6A-EP101 6A-E601 E-601
(C) Attachment 3, Exhibit A and B. Below ELIN/Sub-ELINs are revised to read as follows;
therefore, replaced with attached Exhibit A and B dated 17 Jun 15 (Attachment 4 to Amendment).
Exhibit A A 001 AB FGO 3 BEDROOM (TYPE 12J) 24 Units
BLDG 223, 225, 226, 235, 237, 239
A 001 AC FGO 3 BEDROOM (TYPE 12JF) 40 Units
BLDG 241, 243, 245, 247, 249, 251, 252, 253, 255, 257
(Window flim installation only)
A 001 AG SNCO 4 BEDROOM (TYPE 7) 36 Units
BLDG 193, 194, 195, 196, 717, 719, 1899, 1900, 1901
A 001 AH SNCO 4 BEDROOM (TYPE 7R) 12 Units
BLDG 191, 400, 403
(including Roof Rigid Insulation & Urethance membrane system)
Exhibit B B 001 AD SNCO/CGO/JNCO 3 BEDROOM (TYPE 4) 24 Units
BLDG 1823, 1824, 1825, 1826, 1828, 1829
B 001 AE SNCO/CGO/JNCO 3 BEDROOM (TYPE 4A) 4 Units
(D) Attachment 6, IMFH Weatherization Phase I Construction Timeline is replaced with the attached revised construction timeline dated 17 Jun 15 (Attachment 5 to this Amendment).
(E) Attachment 8, Acceptable Japanese Product Substitutes is revised to read as follows; therefore, replaced with attached Acceptable Japanese Product Substitutes dated 17 Jun 15 (Attachment 6 to this Amendment).
Spec Sect Material Description U.S. Standard Japanese Standard 26 20 00 Disconnect Switch NEMA KS1 JIS C 8201
(F) Consolidated List of the Government Response/Clarification is hereby incorporated into Section J of the solicitation as Attachment 10 (Attachment 7 to this Amendment).
(2) Accordingly, “List of Documents, Exhibits and Other Attachments” is revised as follows:
DOCMENT TYPE DESCRIPTION PAGE DATE
Attachment 1 Specifications 435 Rev. 17 Jun 15 Attachment 2 Drawings 170 Rev. 17 Jun 15 Attachment 3 Exhibit A and B 3 Rev. 17 Jun 15 Attachment 4 Past Performance Questionnaire (PPQ) Cover Letter 1 10 Apr 15 Attachment 5 Past/Present Performance Questionnaire (PPQ) 6 30 Mar 15 Attachment 6 IMFH Weatherization Phase I Construction Timeline 1 Rev. 17 Jun 15 Attachment 7 Schedule of Material Submittals 12 25 Mar 15 Attachment 8 Acceptable Japanese Product Substitutes 2 Rev. 17 Jun 15 Attachment 9 Manufacturer’s Cut Sheet / Catalog Information 182 27 Mar 15 Attachment 10 Consolidated List of the Gov’t Response/Clarification 19 17 Jun 15
(b) As a result of the changes above, the solicitation closing time and date specified in block 13A of SF1442 is extended to “11:00 AM” on “10 Jul 15”. Accordingly, the document submission due date specified in Section L-100(c)(4) of the solicitation is revised to read as follows:
(c) The offerors are required to replace solicitation, exhibits, and attachments with revised documents provided under this amendment. The offeror must use the revised Exhibit A and B dated 17 Jun 15 for submission.
(d) Except as provided herein, all terms and conditions remain unchanged.
Attachments:
1. Addendum No. 1 dated 17 Jun 15, 25 pages
2. Revised Specifications dated 17 Jun 15, 79 pages
3. Revised Drawings dated 17 Jun 15, 77 pages
4. Revised Exhibit A and B dated 17 Jun 15, 3 pages
5. Revised IMFH Weatherization Phase I Construction Timeline dated 17 Jun 15, 1 page
6. Revised Acceptable Japanese Product Substitutes dated 17 Jun 15, 2 pages
7. Consolidated List of the Government Response/Clarification dated 17 Jun 15, 19 pages
8. Revised Solicitation page 1, 24, and 39 numbered with FA5205-15-R-0008-0003, 3 pages
PART TITLE
ELECTRONIC
COPY
PAPER
COPY
PAGE LIMIT DUE DATE
I Summary and Misc Data (File Name: Part I)
1 3 - 10 Jul 15
II
Price (File Name: Part II)
1 1 - 10 Jul 15
III
Past Performance (File Name: Part III)
1 8 50 10 Jul 15