FA5205-15-R-0008-0004_Atch_(Rev)_RFP.pdf

PDF 25 KB Posted

Attached to
Improve Military Family Housing (IMFH), Weatherization, Phase I, Misawa AB, Japan
Solicitation number
FA5205-15-R-0008
Issued by

About this file

FA5205-15-R-0008-0004_Atch_(Rev) RFP

View the file

Other files

File Type Posted
FA5205-15-R-0008-0005.pdf PDF
FA5205-15-R-0008-0005_Atch._2_Revised_Solicitation.pdf PDF
FA5205-15-R-0008-0005_Atch._1_Drawings_1B_(Revised).pdf PDF
FA5205-15-R-0008-0004.pdf PDF
FA5205-15-R-0008-0003_Atch._3_Drawings_1A_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._6_Acceptable_Japnese_Product_Substitutes_(Revised).pdf PDF
FA5205-15-R-0008-0003.pdf PDF
FA5205-15-R-0008-0003_Atch._2_Specifications_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._5_Construction_Timeline_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._8_Revised_Solicitation.pdf PDF
FA5205-15-R-0008-0003_Atch._1_Addendum_No._1.pdf PDF
FA5205-15-R-0008-0003_Atch._7_Consolidated_List_of_the_Gov't_Response.pdf PDF
FA5205-15-R-0008-0003_Atch._3_Drawings_1B_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._4_Exhibit_A_and_B_(Revised).xls XLS spreadsheet
FA5205-15-R-0008-0002_Atch_Revised_RFP.pdf PDF
FA5205-15-R-0008-0002.pdf PDF
FA5205-15-R-0008-0001_Atch_Revised_RFP.pdf PDF
FA5205-15-R-0008-0001.pdf PDF
Attachment_4_to_PreProposal_Conference_Minutes_ _Record_of_Site_Visit.pdf PDF
FA5205-15-R-0008_PreProposal_Conference_Minutes_ _Record_of_Site_Visit.pdf PDF
FA5205-15-R-0008_Atch._9_Catalog_Cut.pdf PDF
FA5205-15-R-0008_Atch._1_Specifications.pdf PDF
FA5205-15-R-0008_Atch._5_PPQ.pdf PDF
FA5205-15-R-0008_Atch._8_Acceptable_JP_Products.pdf PDF
FA5205-15-R-0008_Atch._2_Drawings_1_of_2.pdf PDF
FA5205-15-R-0008_Atch._4_PPQ_Cover_Letter.pdf PDF
FA5205-15-R-0008_Atch._2_Drawings_2_of_2.pdf PDF
FA5205-15-R-0008_Atch._3_Exhibit_A_and_B.xls XLS spreadsheet
FA5205-15-R-0008_Atch._7_Schedule_of_Material_Submittals.pdf PDF
FA5205-15-R-0008_RFP.pdf PDF
FA5205-15-R-0008_Atch._6_ConstructionTimeline.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5205-15-R-0008

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot IMFH Weatherization Phase IA

FFP

Project No. QKKA 13-3001-P1, Weatherization Phase IA, Misawa Air Base, Japan. The contractor shall provide all supervision, management, quality control, labor, tools, equipment, and material and performance of all work necessary to improve weatherization in 1012 Military Family Housing (MFH) units in 185 buildings and 4 towers, located in North Area and Main Base Area in Misawa Air

Base, Japan, as called for by the specifications and drawings provided herein.

The offeror shall complete the pricing schedule required under the Exhibit A listed in Section J (see Exhibit Line Item No. (ELIN) A001), then, indicate the total amount of CLIN 0001 in the price fill-in herein.

"See para. F-901 for the performance period."

* Applicability of SCL: The units listed in Exhibit A are subject to the statutory cost limitations (SCL) stipulated in DFARS 252.236-7006, "Cost Limitation", in

Section L. For the purpose of this contract, the most expensive unit (MEU) /

$77,000.00 is the applicable cost limitation. Offeror exceeding the said cost limitation may be rejected IAW DFARS 252.236-7006.

FOB: Destination

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot IMFH Weatherization Phase IB

FFP

Project No. QKKA 13-3001-P1, Weatherization Phase IB, Misawa Air Base, Japan. The contractor shall provide all supervision, management, quality control, labor, tools, equipment, and material and performance of all work necessary to install air conditioning and improve weatherization in 208 Military Family Housing

(MFH) units in 58 buildings (50 4-plex Bldgs. and 8 SOQs), located in North Area and Main Base (only Bldg. 221) in Misawa Air Base, Japan, as called for by specifications and drawings provided herein.

The offeror shall complete the pricing schedule required under the Exhibit B listed in Section J (see Exhibit Line Item No. (ELIN) B001), then, indicate the total amount of CLIN 0002 in the price fill-in herein.

"See para. F-901 for the performance period."

* Applicability of SCL: The units listed in Exhibit B are subject to the statutory cost limitations (SCL) stipulated in DFARS 252.236-7006, "Cost Limitation", in

Section L. For the purpose of this contract, the most expensive unit (MEU) /

$77,000.00 is the applicable cost limitation. Offeror exceeding the said cost limitation may be rejected IAW DFARS 252.236-7006.

FOB: Destination

CLIN 0001, IMFH Weatherization Phase IA Amount: ¥___________________________

CLIN 0002, IMFH Weatherization Phase IB Amount: ¥___________________________

IMFH Weatherization Phase I Total Amount: ¥___________________________

Section L - Instructions, Conditions and Notices to Bidders

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Data Universal Numbering System Number JUL 2013 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7006 Cost Limitation JAN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price (FFP) contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from 35th Contracting Squadron, Attn: Chief, Acquisition "P" Flight, Bldg. 656, Misawa Air Base, Misawa-shi, Aomori-ken, Japan 033-0012.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, “Differing Site Conditions”, and 52.236-3, “Site Investigations and Conditions Affecting the Work”, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Any organized site visit has been scheduled for – Upon completion of pre-proposal conference, see Section

L, AFFARS 5352.215-9001.

(c) Participants will meet at – See Section L, AFFARS 5352.215-9001.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by

File details come from the government source that posted it. Updated .