FA5205-15-R-0008-0003_Atch._1_Addendum_No._1.pdf

PDF 88 KB Posted

Attached to
Improve Military Family Housing (IMFH), Weatherization, Phase I, Misawa AB, Japan
Solicitation number
FA5205-15-R-0008
Issued by

About this file

FA5205-15-R-0008-0003_Atch. 1_Addendum No. 1

View the file

Other files

File Type Posted
FA5205-15-R-0008-0005.pdf PDF
FA5205-15-R-0008-0005_Atch._2_Revised_Solicitation.pdf PDF
FA5205-15-R-0008-0005_Atch._1_Drawings_1B_(Revised).pdf PDF
FA5205-15-R-0008-0004_Atch_(Rev)_RFP.pdf PDF
FA5205-15-R-0008-0004.pdf PDF
FA5205-15-R-0008-0003_Atch._3_Drawings_1A_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._6_Acceptable_Japnese_Product_Substitutes_(Revised).pdf PDF
FA5205-15-R-0008-0003.pdf PDF
FA5205-15-R-0008-0003_Atch._2_Specifications_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._5_Construction_Timeline_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._8_Revised_Solicitation.pdf PDF
FA5205-15-R-0008-0003_Atch._7_Consolidated_List_of_the_Gov't_Response.pdf PDF
FA5205-15-R-0008-0003_Atch._3_Drawings_1B_(Revised).pdf PDF
FA5205-15-R-0008-0003_Atch._4_Exhibit_A_and_B_(Revised).xls XLS spreadsheet
FA5205-15-R-0008-0002_Atch_Revised_RFP.pdf PDF
FA5205-15-R-0008-0002.pdf PDF
FA5205-15-R-0008-0001_Atch_Revised_RFP.pdf PDF
FA5205-15-R-0008-0001.pdf PDF
Attachment_4_to_PreProposal_Conference_Minutes_ _Record_of_Site_Visit.pdf PDF
FA5205-15-R-0008_PreProposal_Conference_Minutes_ _Record_of_Site_Visit.pdf PDF
FA5205-15-R-0008_Atch._9_Catalog_Cut.pdf PDF
FA5205-15-R-0008_Atch._1_Specifications.pdf PDF
FA5205-15-R-0008_Atch._5_PPQ.pdf PDF
FA5205-15-R-0008_Atch._8_Acceptable_JP_Products.pdf PDF
FA5205-15-R-0008_Atch._2_Drawings_1_of_2.pdf PDF
FA5205-15-R-0008_Atch._4_PPQ_Cover_Letter.pdf PDF
FA5205-15-R-0008_Atch._2_Drawings_2_of_2.pdf PDF
FA5205-15-R-0008_Atch._3_Exhibit_A_and_B.xls XLS spreadsheet
FA5205-15-R-0008_Atch._7_Schedule_of_Material_Submittals.pdf PDF
FA5205-15-R-0008_RFP.pdf PDF
FA5205-15-R-0008_Atch._6_ConstructionTimeline.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM No. 1

TO

SOLICITAION NO. FA5205-15-R-0008

FOR

PROJECT QKKA 13-3001P1

IMPROVE MILITARY FAMILY HOUSIGN WEATHERIZATION, Phase-1

MISAWA AB, JAPAN

17 Jun 15

The project scope of work is amended to provide the following changes:

1. Revision of Work:

1). Handling clarification of existing blinds is inserted to Specifications and drawings.

2). Installation of thermal-break plastic window and frame to the existing aluminum and wood trim is clarified and the revised documents are provided.

i) Existing wood trim width except type 2 is larger than new plastic window frame, therefore the installation is in accordance with the manufacturer’s instruction without the attachment.

Following unit types uses wood trim only:

1A 1B 4R 2

(40x30mm trim, see drawing) 6A 3R 7 4

7A 4A

7R 5AR

12J - 15N - 16N -

ii) Existing aluminum trim width is less than the new plastic window frame, therefore additional wood trim with support element (nail to wall furring) is required.

2. Changes in Specifications:

1). Section 00 00 1, INDEX: “NOT USED” is deleted from the DIVISION 06, and Section 06 20 00 FINISH CARPENTRY is added to DIVISION 06.

2). Section 01 11 00, paragraph 1.1.2 is revised to as below:

Atch. 1 to FA5205-15-R-0008-0003 Dated 17 Jun 15

From: 1.1.2 HAZARDOUS MATERIAL

To: 1.1.2 HAZARDOUS MATERIAL (applies to 1B only)

3). Section 01 11 10, paragraph 1.1.1) is revised to add new sentence to the end:

From: Remove existing inner sash panels where the existing window is double sliding sash. Provide thermal-break plastic window assembly with its frame, and accessories to windows only. For the rest of patio sliding door (large size window is included), sun control window film shall be provided.

To: Remove existing inner sash panels where the existing window is double sliding additional wood trim where required. For the rest of patio sliding door (large size window is included), sun control window film shall be provided.

Contractor shall remove existing vertical/horizontal blinds and reinstall them to the existing wood curtain rail nailer. Where the curtain rail exists on the nailer, remove and dispose curtain rail.

4). Section 01 11 10, paragraph 1.1.2) is revised to add new sentence to the end:

From: Remove existing inner sash panel of bedroom only where the existing window is double sliding sashes. Provide thermal-break plastic window assembly with its frame, and accessories to those windows only. For the rest of kitchen area windows and patio sliding doors, sun control window film shall be provided.

To: Remove existing inner sash panel of bedroom only where the existing window its frame, and an additional wood trim where required. For the rest of kitchen area windows and patio sliding doors, sun control window film shall be provided. Contractor shall remove existing vertical/horizontal blinds and reinstall them to the existing wood curtain rail nailer. Where the curtain rail exists on the nailer, remove and dispose curtain rail.

5). Section 01 11 10, paragraph 1.1 Table for Overall Unit

Type 12J: Location Main: Quantity is revised from 11 to 6.

BLDG-QTY: Quantity is revised from 11 to 6 TOTAL UNITS: Quantity is revised from 44 to 24

Type 12JF:Location Main: Quantity is revised from 5 to 10.

BLDG-QTY: Quantity is revised from 5 to 10 TOTAL UNITS: Quantity is revised from 20 to 40

Type 7: Location Main: Quantity is revised from 8 to 6.

BLDG-QTY: Quantity is revised from 11 to 9 TOTAL UNITS: Quantity is revised from 44 to 36

Type 7R: Location Main: Quantity is revised from 1 to 3.

BLDG-QTY: Quantity is revised from 1 to 3 TOTAL UNITS: Quantity is revised from 4 to 12

6). Section 01 11 10, paragraph 1.1 Table for FGO (3BR)

#12-16: Building 251, 252, 253, 255, 257

BLDG TYPE is revised from 12J to 12JF WORK INCLUDE/WINDOW is revised form X to X*.

7). Section 01 11 10, paragraph 1.1 Table for SNCO (4BR)

#8-9: Building 400, 403: BLDG TYPE is revised from 7 to 7R WORK INCLUDE/ROOF is revised form N.I.C to X.

8). Section 01 11 10, sub-paragraph 1 Table for FGO (3BR)

Revise the caption of “80 UNITS IN 20” to “76 UNITS IN 19”.

9). Section 01 11 20, paragraph 1.1.1) is revised and add new sentence to the end:

To: Remove existing inner sash panels where the existing window is double sliding additional wood trim where required. For the rest of patio sliding door (large size window is included), sun control window film shall be provided.

Contractor shall remove existing vertical/horizontal blinds and reinstall them to

10). Section 01 11 20, paragraph 1.1.2) is revised and add new sentence to the end:

To: Remove existing inner sash panel of bedroom only where the existing window its frame, and additional wood trim where required. For the rest of kitchen area windows and patio sliding doors, sun control window film shall be provided.

Contractor shall remove existing vertical/horizontal blinds and reinstall them to

11). Section 01 11 20, paragraph 1.1.4) is revised and add new sentence to the end:

From: Remove existing inner sash panel where the existing window is double sliding sashes. Provide thermal-break plastic window assembly with its frame, and accessories to windows only. For the rest of kitchen area windows, laundry, patio sliding doors, sun control window film shall be provided.

To: Remove existing inner sash panel where the existing window is double sliding sashes. Provide thermal-break plastic window assembly with its frame, and accessories to windows only. For the rest of kitchen area windows, laundry, patio sliding doors, sun control window film shall be provided. Contractor shall remove existing vertical/horizontal blinds and reinstall them to the existing wood curtain rail nailer. Where the curtain rail exists on the nailer, 12). Section 01 11 20,Table for Overall Unit breakdown is revised as below:

Type 4: Location North: Quantity is revised from 4 to 6.

BLDG-QTY: Quantity is revised from 4 to 6 TOTAL UNITS: Quantity is revised from 16 to 24

Type 4A: Location North: Quantity is revised from 3 to 1.

BLDG-QTY: Quantity is revised from 3 to 1 TOTAL UNITS: Quantity is revised from 12 to 4

13). Section 01 11 20, paragraph 1.1 Table for SNCO/CGO/JNCO (3BR)

#2: Building 1823 BLDG TYPE is revised from 4A to 4

#7: Building 1828: BLDG TYPE is revised from 4A to 4

14). Section 08 51 15, paragraph 2.1 is revised:

From: LIXIL To: YKK

15). Section 08 87 13, paragraph 2.2 is revised:

From: 20mil (50micron) To: 45 micron

16). Specification 23 05 15, part 1, para 1.1, page 4, page 7 and para 2.1.3, page12 is revised to add the followings:

a) ASTM D2464 (2013) Standard Specification for Threaded Poly Vinyl Chloride (PVC) Plastic Pipe Fittings, Schedule 80

b) ASTM D2466 (2013) Standard Specification for Poly Vinyl Chloride (PVC) Plastic Pipe

Fittings, Schedule 40.

c) ASTM D2665 (2012) Standard Specification for Poly Vinyl Chloride (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings

d) JAPANEAS INDUSTRIAL STANDARD (JIS)

JIS K 6741 (2007; Reaffirmed 2011) Unplasticized poly (vinyl chloride) (PVC-U) pipes

e) Screwed PVC drainage piping conforming to ASTM D2464, ASTM D2466, ASTM D2665 and JIS K 6741.

17). Specification 23 82 02, page 8, para2.2.1, first block is revised.

From: The variable capacity, heat pump air conditioning system shall be a Variable

Refrigerant Flow Zoning System. The systems shall be a cool/heat single-phase 208 Volts/50 HZ split heat pump.

To: The variable capacity, heat pump air conditioning system shall be a Variable

Refrigerant Flow Zoning System. The systems shall be a cool/heat single phase or 3 phase 200 Volts/50 HZ split heat pump.

18). Specification 23 82 02, page 8, para2.2.1.1, 3rd paragraph.

From: Outdoor unit shall have a sound rating no higher than 52 dB(A).

To: Outdoor unit shall have a sound rating no higher than 54 dB(A).

3. Changes in Drawings:

3.1 Phase 1A

1). PH 1A, G-002:

a) Drawings name revised to G-002R

b) 1 a G002 is revised to G002R.

G003 is revised to G003R.

c) 1 b A-002 is revised to A-002R A-003 is revised to A-003R A-004 is revised to A-004R A-005 is revised to A-005R

d) 1 c 6-AD101 is revised to 6-AD101R.

6-AE101 is revised to 6-AE101R

6-AE201 is revised to 6-AE201R

e) 1 d 6A-AD101 is revised to 6A-AD101R.

6A-AE101 is revised to 6A-AE101R 6A-AE201 is revised to 6A-AE201R

f) 1 e 7-AD101 is revised to 7-AD101R.

7-AE101 is revised to 7-AE101R 7-AE102 is revised to 7-AE102R 7-AE201 is revised to 7-AE201R

g) 1 f 7A-AD101 is revised to 7A-AD101R 7A-AE101 is revised to 7A-AE101R 7A-AE201 is revised to 7A-AE201R

h) 1 g 12J-AD101 is revised to 12J-AD101R.

12J-AE101 is revised to 12J-AE101R

i) 1 h 15N-AD101 is revised to 15N-AD101R.

15N-AE101 is revised to 15N-AE101R

j) 1 i 16N-AD101 is revised to 16N-AD101R

k) 1 j A501 is revised to A501R.

l) 1 k A503 is revised to A503R.

m) 1 l A601 is revised to A601R.

A602 is revised to A602R.

2). PH 1A, G-003:

a) Drawings name revised to G-003R

b) 1 a TABLE:Type 12J: Location Main: Quantity is revised from 11 to 6.

TABLE:Type 12JF: Location Main: Quantity is revised from 5 to 10.

c) 1 b TABLE:Type 12J: BLDG-QTY: Quantity is revised from 11 to 6 TABLE:Type 12JF: BLDG-QTY: Quantity is revised from 5 to 10

d) 1 c TABLE:Type 12J: TOTAL UNITS: Quantity is revised from 44 to 24 TABLE:Type 12JF: TOTAL UNITS: Quantity is revised from 20 to 40

e) 1 d TABLE:Type 7: Location Main: Quantity is revised from 8 to 6.

TABLE:Type 7R: Location Main: Quantity is revised from 1 to 3.

f) 1 e TABLE:Type 7: BLDG-QTY: Quantity is revised from 11 to 9 TABLE:Type 7R: BLDG-QTY: Quantity is revised from 1 to 3

g) 1 f TABLE:Type 7: TOTAL UNITS: Quantity is revised from 44 to 36 TABLE:Type 7R: TOTAL UNITS: Quantity is revised from 4 to 12

h) 1 g Table for FGO (3BR):

BLDG NAME 251 BLDG-TYPE is revised from 12J to 12JF.

BLDG NAME 252 BLDG-TYPE is revised from 12J to 12JF.

BLDG NAME 253 BLDG-TYPE is revised from 12J to 12JF.

BLDG NAME 255 BLDG-TYPE is revised from 12J to 12JF.

BLDG NAME 257 BLDG-TYPE is revised from 12J to 12JF.

BLDG NAME 251 WORK INCLUDE/WINDOW is revised from X to X*.

BLDG NAME 252 WORK INCLUDE/WINDOW is revised from X to X*.

BLDG NAME 253 WORK INCLUDE/WINDOW is revised from X to X*.

BLDG NAME 255 WORK INCLUDE/WINDOW is revised from X to X*.

BLDG NAME 257 WORK INCLUDE/WINDOW is revised from X to X*.

i) 1 h Table for SNCO (4BR) BLDG NAME 400 BLDG-TYPE is revised from 7 to 7R.

BLDG NAME 403 BLDG-TYPE is revised from 7 to 7R.

j) 1 i Table for SNCO (4BR) BLDG NAME 400 WORK INCLUDE/ROOF is revised from N.I.C to X.

BLDG NAME 403 WORK INCLUDE/ROOF is revised from N.I.C to X.

3). PH 1A, A-002:

a) Drawings name revised to A-002R

b) 1 a 15N is revised to 5N for building 215.

c) 1 b Add existing window trim information of Aluminum or wood in column..

4). PH 1A, A-003:

a) Drawings name revised to A-003R

b) 1 a 15N is revised to 5N for building 217.

c) 1 b 12J is revised to 12JF for building 241 to 257.

d) 1 c Information row of building 246 is deleted.

e) 1 d Information row of building 374 is added.

f) 1 e Add existing window trim information of Aluminum or wood in column..

5). PH 1A, A-004:

a) Drawings name revised to A-004R

b) 1 a Add existing window trim information of Aluminum or wood in column.

6). PH 1A, A-005:

a) Drawings name revised to A-005R

b) 1 a Add existing window trim information of Aluminum or wood in column.

7). PH 1A, 6-AD101:

a) Drawings name revised to 6-AD101R

b) 1 a 198* is revised to 198 in Building Legend.

8). PH 1A, 6-AE101:

a) Drawings name revised to 6-AE101R

9). PH 1A, 6-AE201:

a) Drawings name revised to 6-AE201R

10). PH 1A, 6A-AD101:

a) Drawings name revised to 6A-AD101R

b) 1 a 2nd floor: Revise #1 to #2 in Diamond for kitchen window.

11) PH 1A, 6A-AE101:

a) Drawings name revised to 6A-AE101R

b) 1 a 2nd floor: Revise #1 to #2 in Hex for kitchen window.

12). PH 1A, 6A-AE201:

a) Drawings name revised to 6A-AE201R

b) 1 a Demolition Rear elevation: Revise #1 to #2 in Diamond for kitchen window.

c) 1 b New Rear elevation: Revise #1 to #2 in Hex for kitchen window.

13). PH 1A, 7-AD101:

a) Drawings name revised to 7-AD101R

b) 1 a building Legend: Add (*) to Building 400 and 403

14) PH 1A, 7-AE101:

a) Drawings name revised to 7-AE101R

15). PH 1A, 7-AE102:

a) Drawings name revised to 7-AE102R

16) PH 1A, 7-AE201:

a) Drawings name revised to 7-AE201R

17) PH 1A, 7A-AD101:

a) Drawings name revised to 7A-AD101R

18) PH 1A, 7A-AE101:

a) Drawings name revised to 7A-AE101R

19) PH 1A, 7A-AE201:

a) Drawings name revised to A-AE201R

b) 1 a Demolition Rear elevation: Revise #1 to #2 in Diamond for kitchen window.

c) 1 b New Rear elevation: Revise #1 to #2 in Hex for kitchen window.

20) PH 1A, 12J-AD101:

a) Drawings name revised to 12J-AD101R

b) 1 a 1st floor: Add #2 with Diamond to Service door.

c) 1 b 1st floor: Revise #1 to #2 in Diamond for kitchen window.

d) 1 c Demolition Rear elevation: Revise #1 to #2 in Diamond for service door.

e) 1 d Demolition Rear elevation: Add #2 in Diamond to window.

f) 1 e building Legend: Add (*) to 251/252/253/255/257.

g) 1 f building Legend: Delete duplicated buildings of 877/878.

21) PH 1A, 12J-AE101:

a) Drawings name revised to 12J-AE101R

b) 1 a Demolition 1st floor: Add #2 with Hex to Service door.

c) 1 b Demolition 1st floor: Revise #1 to #2 in Hex for kitchen window.

d) 1 c New Rear elevation: Add #2 in Hex to service door glasses.

e) 1 d New Rear elevation: Revise #1 to #2 in Hex for kitchen window.

f) 1 e building Legend: Add (*) to 251/252/253/255/257.

g) 1 f building Legend: Delete duplicated buildings of 877/878.

22) PH 1A, 15N-AD101:

a) Drawings name revised to 15N-AD101R

b) 1 a 1st floor: Add #2 with Diamond to Service door.

c) 1 b 1st floor: Revise #1 to #2 in Diamond for kitchen window.

d) 1 c Demolition Rear elevation: Add #2 in Diamond to service door glasses.

e) 1 d Demolition Rear elevation: Revise #1 to #2 in Diamond for kitchen window.

23) PH 1A, 15N-AE101:

a) Drawings name revised to 15N-AE101R

b) 1 a 1st floor: Add #2 with Hex to Service door.

c) 1 b 1st floor: Revise #1 to #2 in Hex for kitchen window.

d) 1 c New Rear elevation: Add #2 in Hex to service door glasses.

e) 1 d New Rear elevation: Revise #1 to #2 in Hex for kitchen window.

24) PH 1A, 16N-AD101:

a) Drawings name revised to 16N-AD101R

b) 1 a-c Demolition Rear elevation: Revise to hatch #1 to #3 in Diamond for terrace doors.

25). PH 1A, A-501:

a) Drawings name revised to A-501R

b) 1 a Photo 16: Description is revised;

From: EXISTING TRIM AND COVER TO REMAIN

To: REMOVE EXISTING VERT/HORI BLINDS AND REINSTALL TO

EXSTING WOOD CURTAIN RAIL NAILER.WHERE CURTAIN RAIL

EXISTS ON NAILER, REMOVE AND DISPOSE RAILS.

26). PH 1A, A-503:

a) Drawings name revised to A-503R

b) 1 a Detail 1: Sectional details are revised to show 2 types of installation:

A: Plastic inner window to fit to existing wood window sill.

B: Plastic inner window to be installed to new additional wood sill, oil varnish painted, with support nailed to existing Light Gauge Steel (LGS) wall furring.

c) 1 b Detail 2: Plan details are revised to show 2 types of installation:

A: Plastic inner window to fit to existing wood window jamb.

B: Plastic inner window to be installed to new additional wood jamb, painted, to contact to existing aluminum window trim.

d) 1 c Note: Note 4 is added as following.

EXST VERT/HORI BLINDS TO BE REMOVED AND RESTORED TO EXST

CURTAIN RAIL NAILER. WHERE CURTAIN RAIL EXISTS ON NAILER,

REMOVE AND DISPOSE RAILS.

e) 1 d Detail 3: Void the canopy details.

27) PH 1A, A-601:

a) Drawings name revised to A-601R

b) 1 a TYPE 5/5R in title is revised to 5.

c) 1 b TYPE 6A: Opening Type 2: Add all information.

Opening Type: 2

Size Width: 1,650 Size Height: 2,100 Exst Material: Aluminum Exst Win Type: D-Sash Requirement: Film

Remarks: SLD

d) 1 c TYPE 6A: Opening Type A: Glazing Thickness is revised as following.

From: PLASTIC SASH To: FILM/PLASTIC SASH

e) 1 d TYPE 7A: Opening Type B: Glazing Thickness is revised as following.

f) 1 e Opening Types: Abbreviations are revised as following.

Delete: DH, FX and AW.

Add: S-SASH: SINGLE SASH.

D-SASH: DOUBLE SASH.

IGU: INSULATED GLASS UNIT

g) 1 f-o Tables: Revise the column titles, and provide reference detail symbols.

From To 3rd Column from left

MATERIAL EXST MATERIAL

4th Column from left

FINISH EXST WIN TUPE

5th Column from left

GLAZING

REQUIREMENT

6th Column from left

GLAZING THICKNESS

28). PH 1A, A-602:

a) Drawings name revised to A-602R

b) 1 a TYPE 12J: Opening Type C Size is revised as following.

From: Width 1,700, Height 1260 To: Width 1,100, Height 1,000

c) 1 b-c TYPE 12J: Opening Type A and C Glazing Thickness is revised as following.

To: FILM

d) 1 d TYPE 15N: Opening Type B Glazing Thickness is revised as following.

e) 1 e-k Tables : Revise the column titles, and provide reference detail symbols.

from left

MATERIAL EXST MATERIAL

4th Column from left

FINISH EXST WIN TUPE

5th Column from left

GLAZING

REQUIREMENT

6th Column

3.2 Phase 1B

3.2.1 GENERAL

1). PH 1B, G-002:

a) Drawings name revised to G-002R

b) 1 a G002 is revised to G002R.

G003 is revised to G003R.

c) 1 b A-002 is revised to A-002R.

d) 1 c 1-AE102 is revised to 1-AE102R.

1-AE201 is revised to 1-AE201R.

1-AE202 is revised to 1-AE202R.

e) 1 d 4-AD101 is revised to 4-AD101R.

4-AE101 is revised to 4-AE101R 4-AE102 is revised to 4-AE102R

f) 1 e 4-AE201 is revised to 4-AE201R

g) 1 f 4A-AD101 is revised to 4A-AD101R.

4A-AE101 is revised to 4A-AE101R 4A-AE102 is revised to 4A-AE102R 4A-AE201 is revised to 4A-AE201R

h) 1 g 5-AE102 is revised to 5-AE102R.

i) 1 h 5A-AE101 is revised to 5A-AE101R.

5A-AE102 is revised to 5A-AE102R

i) 1 i 6A-AD101 is revised to 6A-AD101R.

6A-AD201 is revised to 6A-AD201R 6A-AE101 is revised to 6A-AE101R

j) 1 j 6A-AE201 is revised to 6A-AE201R

k) 1 k A501 is revised to A501R.

A502 is revised to A502R.

l) 1 l A601 is revised to A601R.

m) 1 m 1-MH101 is revised to 1-MH101R.

2-MH101 is revised to 2-MH101R.

3-MH101 is revised to 3-MH101R.

4-MH101 is revised to 4-MH101R.

4A-MH101 is revised to 4A-MH101R.

5-MH101 is revised to 5-MH101R.

o) 1 n 1-EP101 is revised to 1-EP101R.

1-E601 is revised to 1-E601R.

2-EP101 is revised to 2-EP101R.

2-E601 is revised to 2-E601R.

3-EP101 is revised to 3-EP101R.

3-E601 is revised to 3-E601R.

4-EP101 is revised to 4-EP101R.

4-E601 is revised to 4-E601R.

4A-EP101 is revised to 4A-EP101R.

4A-E601 is revised to 4A-E601R.

5-EP101 is revised to 5-EP101R.

5-E601 is revised to 5-E601R.

5A-EP101 is revised to 5A-EP101R.

5A-E601 is revised to 5A-E601R.

6-EP101 is revised to 6-EP101R.

6-E601 is revised to 6-E601R.

6A-EP101 is revised to 6A-EP101R.

6A-E601 is revised to 6A-E601R.

E601 is revised to E601R.

2). PH 1B, G-003:

a) Drawings name revised to G-003R

b) 1 a Table Type 4: Revise quantity of 4 to 6 in Location Main.

Table Type 4: Revise quantity of 3 to 1 in Location Main.

c) 1 b Table Type 4: Revise quantity of 4 to 6 in BLDG-QTY.

Table Type 4: Revise quantity of 3 to 1 in BLDG-QTY.

d) 1 c Table Type 4: Revise quantity of 16 to 24 in TOTAL-UNIT.

Table Type 4: Revise quantity of 12 to 4 in TOTAL-UNIT.

e) 1 d-e Table SNCO/CGO/JNCO (3BR): Revise building type of 4A to 4.

3.2.2 ARCH

1). PH 1B, A-002:

a) Drawings name revised to A-002R

b) 1 a Building Type of 3 is revised to 3R for building 1809.

Building Type of 5 is revised to 5R for building 1810.

Building Type of 5A is revised to 5AR for building 1811.

Building Type of 5 is revised to 5R for building 1812.

Building Type of 3 is revised to 3R for building 1813.

Building Type of 4 is revised to 4R for building 1814.

Building Type of 5 is revised to 5R for building 1815.

c) 1 b Building Type of 4A is revised to 4 for building 1823

d) 1 c Building Type of 4A is revised to 4 for building 1828

e) 1 d Building Type of 4 is revised to 4R for building 1830.

Building Type of 5 is revised to 5R for building 1831.

Building Type of 5 is revised to 5R for building 1832.

Building Type of 4 is revised to 4R for building 1833.

Building Type of 4 is revised to 4R for building 1834.

Building Type of 4 is revised to 4R for building 1835.

Building Type of 3 is revised to 3R for building 1836.

Building Type of 5 is revised to 5R for building 1837.

Building Type of 4 is revised to 4R for building 1838.

Building Type of 4 is revised to 4R for building 1839.

Building Type of 5 is revised to 5R for building 1840.

Building Type of 4 is revised to 4R for building 1841.

Building Type of 5 is revised to 5R for building 1842.

f) 1 e Add existing window trim information of Aluminum or wood in column.

2). PH 1B, 1-AE102:

a) Drawings name revised to 1-AE102R

b) 1 a Ceiling plan is revised to delete/move the ceiling access.

3). PH 1B, 1-AE201:

a) Drawings name revised to 1-AE201R

b) 1 a Add the front view of A/C canopies.

c) 1 b Add the side view of A/C canopy.

4). PH 1B, 1-AE202:

a) Drawings name revised to 1-AE202R

b) 1 a Add the side view of A/C canopy.

5). PH 1B, 4-AD101:

a) Drawings name revised to 4-AD101R

b) 1 a Building Legend: Add building numbers of 1823 and 1828.

6). PH 1B, 4-AE101:

a) Drawings name revised to 4-AE101R

7) . PH 1B, 4-AE102:

a) Drawings name revised to 4-AE102R

8) . PH 1B, 4-AE201:

a) Drawings name revised to 4-AE201R

9) . PH 1B, 4A-AD101:

a) Drawings name revised to 4A-AD101R

b) 1 b Building Legend: Delete building number of 1823 and 1828.

10). PH 1B, 4A-AE101:

a) Drawings name revised to 4A-AE101R

11). PH 1B, 4A-AE102:

a) Drawings name revised to 4A-AE102R

b) 1 a 1st floor: Delete #6 in Hex.

2nd floor: Delete #6 and 7 in Hex.

12). PH 1B, 4A-AE201:

a) Drawings name revised to 4A-AE201R

b) 1 a Rear Elevation: Add #7 with Hex to 1st floor rest room.

c) 1 b Rear Elevation: Revise #6 to #7 in Hex for kitchen window.

d) 1 c Demolition Rear elevation: Revise #1 to #2 in Hex for kitchen window.

e) 1 d Demolition Rear elevation: Add #2 in Hex to1st floor rest room.

13). PH 1B, 5-AE102:

a) Drawings name revised to 5-AE102R

b) 1 a Roof Plan: Revise roof shape.

14). PH 1B, 5A-AE101:

a) Drawings name revised to 5A-AE101R

b) 1 a building Legend: Delete Options and provide building information.

15). PH 1B, 5A-AE102:

a) Drawings name revised to 5A-AE102R

b) 1 a Roof Plan: Revise roof shape.

16). PH 1B, 6A-AD101:

a) Drawings name revised to 6A-AD101R

17). PH 1B, 6A-AD201:

a) Drawings name revised to 6A-AD201R

18). PH 1B, 6A-AE101:

a) Drawings name revised to 6A-AE101R

b) 1 a 2nd floor: Revise #6 to #7 in Hex for kitchen window.

19). PH 1B, 6A-AE201:

a) Drawings name revised to 6A-AE201R

b) 1 a 2nd floor: Revise #6 to #7 in Hex for kitchen window.

20). PH 1B, A-501:

a) Drawings name revised to A-501R

b) 1 a Photo 16: Description is revised;

From: EXISTING TRIM AND COVER TO REMAIN

To: REMOVE EXISTING VERT/HORI BLINDS AND REINSTALL TO EXST

WOOD CURTAIN RAIL NAILER. WHERE CURTAIN RAIL EXISTS ON

NAILER, REMOVE DISPOSE RAILS.

21). PH 1B, A-502:

a) Drawings name revised to A-502R

b) 1 a Detail 1: Sectional details are revised to show 2 types of installation:

A: Plastic inner window to fit to existing wood window sill.

B: Plastic inner window to be installed to new additional wood sill, painted, with support nailed to existing Light Gauge Steel (LGS) wall furring.

c) 1 b Detail 2: Plan details are revised to show 2 types of installation:

A: Plastic inner window to fit to existing wood window jamb.

B: Plastic inner window to be installed to new additional wood jamb, painted, to contact to existing aluminum window trim.

d) 1 c Note: Note 4 is added as following.

EXST VERT/HORI BLINDS TO BE REMOVED AND RESTORED TO EXST

CURTAIN RAIL NAILER. WHERE CURTAIN RAIL EXISTS ON NAILER,

REMOVE AND DISPOSE RAILS.

22). PH 1B, A-601:

a) Drawings name revised to A-601R

b) 1 a TYPE 4A: Opening Type B: Glazing Thickness is revised as following.

c) 1 b TYPE 4A: Opening Type E: Glazing Thickness is revised as following.

d) 1 c TYPE 4A: Opening Type F: Add all information.

Opening Type: F

Size Width: 900 Size Height: 1,320 Exst Material: Aluminum Exst Win Type: D-Sash Requirement: Film Remarks: SLD

e) 1 d TYPE 6A: Opening Type A: Glazing Thickness is revised as following.

f) 1 e-m Tables : Revise the column titles, and provide reference detail symbols.

from left

MATERIAL EXST MATERIAL

4th Column from left

FINISH EXST WIN TYPE

5th Column from left

GLAZING

REQUIREMENT

6th Column

g) 1 n General Notes: General Notes 1 to3 with frame are deleted.

h) 1 o Opening Types: Abbreviations are revised as following.

Delete: DH, FX and AW.

Add: S-SASH: SINGLE SASH.

D-SASH: DOUBLE SASH.

IGU: INSULATED GLASS UNIT

3.2.3 MECH

1). PH 1B, 1-MH101

a) Drawings name revised to 1-MH101R.

b) 1 a Heat pump AC size TAG revised.

From: HP-2 To: HP-1

2). PH 1B, 2-MH101

a) Drawings name revised to 2-MH101R.

b) 1 a Heat pump AC size TAG revised.

From: HP-2 To: HP-1

c) 1 b Add Heat pump condensing unit HP-1.

3) . PH 1B, 3-MH101

a) Drawings name revised to 3-MH101R.

b) 1 a Add steel pipe cover & steel cover box.

4) . PH 1B, 4-MH101

a) Drawings name revised to 4-MH101R.

b) 1 a Title Block:

From: 4 BEDROOM To: 3 BEDROOM

5) . PH 1B, 4A-MH101

a) Drawings name revised to 4A-MH101R.

From: 4 BEDROOM To: 3 BEDROOM

c) 1 b Delete one thermostat from Room 202.

d) 1 c Add room thermostat for Room102.

6) . PH 1B, 5-MH101

a) Drawings name revised to 5-MH101R.

From: 3 BEDROOM To: 2 BEDROOM

c) 1 b Add housing unit “C & D” for B1852.

3.2.4 ELEC

1). PH 1B, 1-EP101

a) Drawings name revised to 1-EP101R.

b) 1 a Delete sheet Note #5.

c) 1 b Delete partial sheet Note #3.

d) 1 c Add sheet Note #6, 7.

e) 1 d Delete General Note #1.

2). PH 1B, 1-E-601

a) Drawings name revised to 1-E-601R.

b) 1 a Revise Load Calculation.

c) 1 b Revise panel M-H.

d) 1 c Revise Power Riser Diagram.

e) 1 d Revise One-line Diagram.

3). PH 1B, 2-EP101

a) Drawings name revised to 2-EP101R.

b) 1 a Delete sheet Note1, 6.

c) 1 b Delete partial sheet Note #4, 5.

d) 1 c Add sheet Note #7, 8.

e) 1 d Delete General Note #1.

4). PH 1B, 2-E-601

a) Drawings name revised to 2-E-601R.

b) 1 a Revise Load Calculation.

c) 1 b Revise panel M-H.

d) 1 c Revise Power Riser Diagram.

e) 1 d Revise One-line Diagram.

5). PH 1B, 3-EP101

a) Drawings name revised to 3-EP101R.

b) 1 a Revise General Note #1.

c) 1 b Revise sheet Note1, 2, 5, and 6.

d) 1 c Add Under/Ground conduit.

6). PH 1B, 3-E-601

a) Drawings name revised to 3-E-601R.

b) 1 a Revise MEP Coordination schedule.

c) 1 b Revise Riser Diagram – 4 Plex.

d) 1 c Revise Enclosure Diagram.

e) 1 d Revise Riser Diagram – SOQ 3BR.

7). PH 1B, 4-EP101

a) Drawings name revised to 4-EP101R.

b) 1 a Revise General Note #1.

8). PH 1B, 4-E-601

a) Drawings name revised to 4-E-601R.

b) 1 a Revise Power Riser Diagram

c) 1 b Revise Load Calculation..

d) 1 c Revise Panel schedule.

9). PH 1B, 4A-EP101

a) Drawings name revised to 4A-EP101R.

b) 1 a Revise General Note #1.

c) 1 b Revise sheet Note1, 2, 5, and 6.

e) 1 d Change HP-1 to HP-2.

10) PH 1B, 4A-E-601

a) Drawings name revised to 4A-E-601R.

b) 1 a Revise Power Riser Diagram

11) PH 1B, 5-EP101

a) Drawings name revised to 5-EP101R.

b) 1 a Revise General Note #1.

c) 1 b Revise sheet Note1, 2, and 5.

12). PH 1B, 5-E-601

a) Drawings name revised to 5-E-601R.

b) 1 a Revise Power Riser Diagram

13) PH 1B, 5A-EP101

a) Drawings name revised to 5A-EP101R.

b) 1 a Revise General Note #1.

c) 1 b Revise sheet Note1, 2, and 5.

14) PH 1B, 5A-E-601

a) Drawings name revised to 5A-E-601R.

b) 1 a Revise Power Riser Diagram

15) PH 1B, 6-EP101

a) Drawings name revised to 6-EP101R.

b) 1 a Revise General Note #1.

16). PH 1B, 6-E-601

a) Drawings name revised to 6-E-601R.

b) 1 a Revise Power Riser Diagram

17). PH 1B, 6A-EP101

a) Drawings name revised to 6A-EP101R.

b) 1 a Revise General Note #1.

c) 1 b Revise sheet Note1, 2, 5, and 6.

18) PH 1B, 6A-E-601

a) Drawings name revised to 6A-E-601R.

b) 1 a Revise Power Riser Diagram

19) PH 1B, E-601

a) Drawings name revised to E-601R.

b) 1 a Revise MEP Coordination schedule.

c) 1 b Revise Riser Diagram – 4 Plex.

d) 1 c Revise Enclosure Diagram.

e) 1 d Revise Riser Diagram – SOQ 3BR.

4. Change in Construction Timeline

Timeline is updated.

Attachments:

1 Revised TOC 2 pages 2 Revised 01 11 00 10 pages 3 Revised 01 11 10 8 pages 4 Revised 01 11 20 4 pages 5 Revised 06 20 00 3 pages 6 Revised 08 51 15 4 pages 7 Revised 08 87 13 5 pages 8 Revised 23 05 15 24 pages 9 Revised 23 82 02 19 pages

10 Revised drawings 1A G002R 11 Revised drawings 1A G003R 12 Revised drawings 1A A002R 13 Revised drawings 1A A003R 14 Revised drawings 1A A004R 15 Revised drawings 1A A005R 16 Revised drawings 1A 6-AD101R 17 Revised drawings 1A 6-AE101R 18 Revised drawings 1A 6-AE201R 19 Revised drawings 1A 6A-AD101R 20 Revised drawings 1A 6A-AE101R 21 Revised drawings 1A 6A-AE201R 22 Revised drawings 1A 7-AD101R 23 Revised drawings 1A 7-AE101R 24 Revised drawings 1A 7-AE102R 25 Revised drawings 1A 7-AE201R 26 Revised drawings 1A 7A-AD101R 27 Revised drawings 1A 7A-AE101R 28 Revised drawings 1A 7A-AE201R 29 Revised drawings 1A 12J-AD101R 30 Revised drawings 1A 12J-AE101R 31 Revised drawings 1A 15N-AD101R 32 Revised drawings 1A 15N-AE101R 33 Revised drawings 1A 16N-AD101R 34 Revised drawings 1A A-501R 35 Revised drawings 1A A-503R 36 Revised drawings 1A A-601R 37 Revised drawings 1A A-602R

38 Revised drawings 1B G-002R 39 Revised drawings 1B G-003R 40 Revised drawings 1B A-002R 41 Revised drawings 1B 1-AE102R 42 Revised drawings 1B 1-AE201R 43 Revised drawings 1B 1-AE202R 44 Revised drawings 1B 4-AD101R 45 Revised drawings 1B 4-AE101R 46 Revised drawings 1B 4-AE102R 47 Revised drawings 1B 4-AE201R 48 Revised drawings 1B 4A-AD101R 49 Revised drawings 1B 4A-AE101R 50 Revised drawings 1B 4A-AE102R 51 Revised drawings 1B 4A-AE201R 52 Revised drawings 1B 5-AE102R 53 Revised drawings 1B 5A-AE101R 54 Revised drawings 1B 5A-AE102R 55 Revised drawings 1B 6A-AD101R 56 Revised drawings 1B 6A-AD201R 57 Revised drawings 1B 6A-AE101R 58 Revised drawings 1B 6A-AE201R 59 Revised drawings 1B A-501R 60 Revised drawings 1B A-502R 61 Revised drawings 1B A-601R 62 Revised drawings 1B 1-MH101R 63 Revised drawings 1B 2-MH101R 64 Revised drawings 1B 3-MH101R 65 Revised drawings 1B 4-MH101R 66 Revised drawings 1B 4A-MH101R 67 Revised drawings 1B 5-MH101R 68 Revised drawings 1B 1-EP-101R 69 Revised drawings 1B 1-E-601R 70 Revised drawings 1B 2-EP-101R 71 Revised drawings 1B 2-E-601R 72 Revised drawings 1B 3-EP-101R 73 Revised drawings 1B 3-E-601R 74 Revised drawings 1B 4-EP-101R 75 Revised drawings 1B 4-E-601R 76 Revised drawings 1B 4A-EP-101R 77 Revised drawings 1B 4A-E-601R

78 Revised drawings 1B 5-EP-101R 79 Revised drawings 1B 5-E-601R 80 Revised drawings 1B 5A-EP-101R 81 Revised drawings 1B 5A-E-601R 82 Revised drawings 1B 6-EP-101R 83 Revised drawings 1B 6-E-601R 84 Revised drawings 1B 6A-EP-101R 85 Revised drawings 1B 6A-E-601R 86 Revised drawings 1B E-601R 87 Revised Timeline

File details come from the government source that posted it. Updated .