Solicitation Amendment FA500021R00220001 SF 30.pdf

PDF 533 KB Posted

Attached to
JBER Exterior Paint IDIQ***Amendment 0003*** Federal contract opportunity
Solicitation number
FA500021R0022
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is an amendment to a solicitation for an Indefinite Delivery/Indefinite Quantity (IDIQ) multiple award construction contract for exterior painting projects at Joint Base Elmendorf-Richardson in Alaska. The amendment extends the response due date to September 23, 2021, provides a site visit sign-in sheet and questions and answers, revises sections L and M, adds a question deadline, and extends the DoD SAFE drop-off link deadline to September 20, 2021. The contract ceiling is $30 million over five years, and task order values are expected between $500 and $3 million. The government anticipates awarding up to five contracts to responsible offerors whose proposals meet requirements and provide best overall value based on past performance, technical acceptability, and price for an identified seed project.

View the file

Other files for this federal contract opportunity

Other files attached to JBER Exterior Paint IDIQ***Amendment 0003***, newest first.
File Type Posted
Amendment 0003 - QUESTIONS AND ANSWERS.pdf PDF
Solicitation Amendment FA500021R00220003 SF 30.pdf PDF
Solicitation Amendment FA500021R00220002 SF 30.pdf PDF
Attachment 22 - Teaming Consent.pdf PDF
Attachment 2 JBER Paint IDIQ Questions Submitted.pdf PDF
Attachment 1 - Exterior Paint IDIQ_Seed Project Bldg. 798.pdf PDF
Attachment 2 - JBER Paint IDIQ - Questions Submitted.pdf PDF
Solicitation - FA500021R0022 20210802.pdf PDF
Attachment 15 - Seed Project - FOPR 20210802.pdf PDF
Attachment 15 - Seed Project - FOPR 20201208.pdf PDF
Attachment 12 - Past Performance Cover Letter and Questionnarire.pdf PDF
Attachment 07 - Contractors Fire Safety Guide 20201208.pdf PDF
Attachment 08 - 673ABW Form 3 Dig Permit (20 Version) 20201208.pdf PDF
Attachment 03 - JBER Hazardous Waste Management Plan 20200507.pdf PDF
Attachment 05 - Environmental PRECON Checklist 2020.pdf PDF
Attachment 19 - Seed Project Drawings.pdf PDF
Attachment 16 - Seed Project Price Schedule.pdf PDF
Attachment 17 - Seed Project AF Form 66.pdf PDF
Attachment 13 - Financial Data Form 20201208.pdf PDF
Attachment 11 - DD1354 AUG2013 20201208.pdf PDF
Attachment 02 - Wage Determination AK20210001.pdf PDF
Attachment 20 - Seed Project Lead Paint Analysis.pdf PDF
Attachment 21 - Seed Project Liquidated Damages.pdf PDF
Attachment 06 - CAD GIS RECORD DRAWING DESIGN AND AS BUILT STANDARD 20201208.pdf PDF
Attachment 04 - JBER_Elmendorf_IFS_20201208.pdf PDF
Attachment 01 - Paint IDIQ SOW 05 MAR 21.pdf PDF
Attachment 10 - Dig Permit Custom Map Rich 20201208.pdf PDF
Solicitation - FA500021R0022.pdf PDF
Attachment 18 - Seed Project SOW.pdf PDF
Attachment 14 - AF Form 66.pdf PDF
Attachment 09 - Dig Permit Custom Map Elmo 20201208.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Seed Project HJZH 19-1123 Maintain Paint Exterior Bldg. 798Block 5 (Project Number):

The purpose of this Amendment is to:Block 14 (Description of Amendment/Modification):

A.) Provide site visit sign-in sheet for the seed project, the questions and answers, and attachment J-22 Teaming Consent Form.

B.) Revise the Section L and M of the Solicitation.

C.) Add an additional Questions due date of 07 of September 2021 by 2:00 PM.

D.) Extend the DoD Safe request for drop-off link to the 20th of September 2021 by 2:00 PM.

E.) Extend the proposal due date to the 23rd of September 2021 by 2:00 PM.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Contract Description

The Multiple Award Construction Contract herein referred to as the Paint IDIQ, is an Indefinite Delivery, Indefinite-Quantity (IDIQ) contract that supplements Civil Engineer’s (CE) Construction and Facility Management’s (CFMO) in-house capabilities to perform minor construction, facility repair/alteration, and real property repair/alteration projects on an as needed basis. The Paint IDIQ is for exterior painting projects that are beyond the capability of the base civil engineers to perform with Government resources.

The solicitation is issued as a Small business set-aside.

This solicitation will be conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Department of Defense (DoD) FAR Supplement Procedures, Guidance and Information Subpart 215.3, and Air Force FAR Supplement (AFFARS) Mandatory Procedure

(MP) 5315.3.

Contract value is expected to be no less than $500.00 and the ceiling for the Multiple Award Contract is $30,000,000.00 - 5-year Base period.

The Task Order values are expected to be between $500.00 and NTE $3,000,000.00.

The Government anticipates award of up to 5 contracts.

NAICS 238320 Size Standard $16.5M.

A bid guarantee shall be furnished by the offeror for the seed project proposal only.

The Multiple Award Construction Contract herein referred to as the Paint IDIQ, is an Indefinite Delivery, Indefinite-Quantity (IDIQ) contract that supplements Civil Engineer’s (CE) Construction and Facility Management’s (CFMO) in-house capabilities to perform minor construction, facility repair/alteration, and real property repair /alteration projects on an as needed basis. The Paint IDIQ is for exterior painting projects that are beyond the capability of the base civil engineers to perform with Government resources.

The solicitation is issued as a Small business set-aside.

This solicitation will be conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Department of Defense (DoD) FAR Supplement Procedures, Guidance and Information Subpart 215.3, and Air Force FAR Supplement (AFFARS) Mandatory Procedure (MP) 5315.3.

Contract value is expected to be no less than $500.00 and the ceiling for the Multiple Award Contract is $30,000,000.00 - 5-year Base period.

The Task Order values are expected to be between $500.00 and

NTE $3,000,000.00.

The Government anticipates award of up to 5 contracts.

NAICS 238320 Size Standard $16.5M.

A bid guarantee shall be furnished by the offeror for the seed project proposal only.

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

Response Due Date

30 Aug 2021 23 Sep 2021

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

FA500021R00220001

Attachment 01 - Paint IDIQ SOW 05 MAR 21 Attachment 02 - Wage Determination AK20210001 Attachment 03 - JBER Hazardous Waste Management Plan 20200507 Attachment 04 - JBER_Elmendorf_IFS_20201208 Attachment 05 - Environmental PRECON Checklist 2020 Attachment 06 - CAD GIS RECORD DRAWING DESIGN AND AS BUILT STANDARD 20201208 Attachment 07 - Contractors Fire Safety Guide 20201208 Attachment 08 - 673ABW Form 3 Dig Permit (20 Version) 20201208 Attachment 09 - Dig Permit Custom Map Elmo 20201208 Attachment 10 - Dig Permit Custom Map Rich 20201208 Attachment 11 - DD1354 AUG2013 20201208 Attachment 12 - Past Performance Cover Letter and Questionnaire Attachment 13 - Financial Data Form 20201208 Attachment 14 - AF Form 66 Attachment 15 - Seed Project - FOPR 20201208 Attachment 16 - Seed Project Price Schedule Attachment 17 - Seed Project AF Form 66 Attachment 18 - Seed Project SOW Attachment 19 - Seed Project Drawings Attachment 20 - Seed Project Lead Paint Analysis Attachment 21 - Seed Project Liquidated Damages Attachment 22 - Teaming Consent Form

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

L-01. PROPOSAL PREPARATION INSTRUCTIONS

A. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those criteria identified as evaluation factors. The response shall consist of four (4) separate parts; Part I - Summary and Miscellaneous Data, Part II - Past Performance Proposal, Part III - Technical Propsoal, and Part IV Price Proposal.

B. SPECIFIC INSTRUCTONS:

1. Proposals shall be submitted by email no later than the solicitation closing date and time to both solicitation points of contact: Ms. Hannah Tolbert at hannah.tolbert.1@us.af.mil and Mr. Dan Swoyer at daniel.swoyer.

1@us.af.mil. See C. 4(a) for additional submission instructions.

2. PART I - SUMMARY AND MISCELLANEOUS DATA - Submit one (1) electronic copy.

(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.

(b) Complete blocks 14-20c of the RFP Section A, SF1442. In doing so, the offeror agrees to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(c) Complete block 19 of the RFP Section A, SF 1442. If any solicitation amendment(s) to the original solicitation documents were issued, amendments will not be counted against the page limits.

(d) Complete the necessary fill-ins and certifications in Sections C through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(e) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

(f) Offerors must clearly identify any exception to the solicitation and provide complete accompanying rationale. If no exceptions, deviations or waivers are proposed, submit an Affirmation of no Exceptions, Deviations, or Waivers.

3. PART II - PAST PERFORMANCE - Submit one (1) electronic copy.

Part II has two (2) parts. Part IIa, Past Performance Questionnaires (Attachment J-12) and Part IIb, Past Performance Information. Only references and information for recent past efforts/contracts of relevance to the scope of this solicitation are desired. Recency is defined in Sect. M, para. C.2. Relevancy is defined in Sect. M, para. C.3.

(a) Part IIa, Past Performance Questionnaires: Past Performance Questionnaires (PPQs) shall be used by the offeror in obtaining and providing past performance information. The Government requires the offeror send out a PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal (paragraph (b) below). The offeror shall send out the Cover Letter and attached PPQ (Attachment J-12), to each of its references.

1. THE RESPONSIBILITY TO SEND OUT THE PAST PERFORMANCE QUESTIONNAIRE RESTS

SOLELY WITH THE OFFEROR.

2. Once the PPQs are completed by the POCs, the information contained therein will be considered source selection sensitive and will not be released outside the Government. The POCs shall forward their completed PPQs directly to the Government - NOT BACK TO THE OFFEROR.

3. PPQs shall be emailed directly from your reference to both of the following solicitation points of contact: Ms.

Hannah Tolbert at hannah.tolbert.1@us.af.mil and Mr. Dan Swoyer at daniel.swoyer.1@us.af.mil. Offerors are requested to submit Part II, Past Performance Questionnaires, so that it is received ten (10) calendar days prior to the required due date for proposals. Failure to submit Part II by the earlier date will not result in offeror disqualification.

(b) Part IIb, Past Performance Information: Provide a summary of up to five (5) completed relevant contracts /projects similar in scope, complexity mentioned in the SOW paragraph 1.1 (J-01), magnitude of projects found in Section L 5(f) and completed within the last three (3) years prior to the issuance date of the solicitation (See Sec M-01, paragraph C.2 and 3.) If a teaming arrangement is contemplated, complete the Teaming Consent Form (Attachment J-22) and identify the teaming arrangement and fully disclose the relationships between parties to the teaming arrangement. The government will evaluate not more than five (5) completed relevant contracts/projects for the proposed team.

1. Summary of each contract/project shall be limited to 2 pages per contract/project. Furnish the following information for each contract listed:

a) Company/Division name

b) Contract/Project Title

c) Contract/Project Location

d) Contracting Agency/Customer

e) Contract Number

f) Contract Dollar Value

g) Period of Performance

h) Verified, up-to-date name, mailing and e-mail addresses, and telephone number for the contract Point-of- Contact

i) Comments regarding compliance with contract terms and conditions (e.g. scope, cost and period of performance, labor and statutory requirements).

j) Describe any known performance deemed unacceptable by the customer, or not in accordance with the contract terms and conditions. Include description of how this was resolved

k) Provide a summary description of the project scope of work.

i. Include rationale supporting your assertion of relevance and identify aspects (scope, magnitude of effort, and complexity) of the contracts deemed relevant and how they relate to the proposed effort.

ii. Provide project information including:

- Describe the performance of exterior painting and explain methods used for preparations prior to the application of exterior coatings.

- Describe meeting project cost, quality standards and schedule.

l) Discussion of noteworthy aspects and challenges that may relate to this solicitation.

m) Pictures of projects may be included, if desired. NOTE: Pictures will count as part of the page limit, and picture size resolution visible if printed.

2. If an offeror has no past performance history of relevance, the offeror must state affirmatively it possesses no past performance history of relevance.

3. Submit past performance information for the five (5) completed projects conforming to recency and relevancy criteria defined in Sect. M, para. C.2. and Sect. M, para. C.3, respectively. Submissions should reflect individual projects, and/or task orders.

4. PART III - TECHNICAL ACCEPTABILITY - Submit one (1) electronic copy.

(a) Complete a narrative of the technical approach for the seed project to perform testing, abatement, and disposal of hazardous materials in accordance with paragraph 3.3.3 of the SOW and JBER Hazardous Waste Management Plan (Attachment J-03). [Narrative must include a description of planned partnering arrangement, subcontract arrangement, or in-house capability. (5 page limitation)]

(b) Submit training and certification complying with local, state and federal standards for planned abatement personnel who will perform testing, abatement, and disposal of hazardous material.

5. PART IV - PRICE PROPOSAL - Submit one (1) electronic copy.

(a) Complete the Seed Project Price Schedule (Attachment J-16). The Seed Project Price Schedule shall be the only place in the RFP that a price will be included. Section B (Supplies or Services and Prices) of the SF1442 shall not be filled in.

(b) Insert proposed unit price and extended amount in Seed Project Price Schedule for the Contract Line Item Number (CLIN). The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct. Unit prices and extended amounts are limited to two decimal places.

(c) Extreme care should be exercised to ensure that no price data of any kind are included in any other part of the proposal.

(d) Complete the Financial Data Form (Attachment J-13).

(e) Provide a scanned copy of the bid guarantee for the seed project in this section of the proposal. Ensure it is completed according to FAR 52.228-1 (Section I of the solicitation). A bid bond will only be required for the seed project in response to this solicitation (SOW 4.11.2.4).

(f) Future Workload Estimates.

1. The Government has an estimate of $6M annually in total volume over the next five (5) years.

2. The Government's estimate for the number of projects per year is approximately 12.

3. The estimated breakdown of project's projected during the ordering period in accordance with FAR 36.204, "Magnitude of Construction" is estimated to be:

(a) Less than $25,000 - 1 project

(b) Between $25,000 and $100,000 - 24 projects

(c) Between $100,000 and $250,000 - 3 projects

(d) Between $250,000 and $500,000 - 17 projects

(e) Between $500,000 and $1,000,000 - 12 projects

(f) Between $1,000,000 and $5,000,000 - 9 projects

*Note that all future workload data listed above is only an estimate to aid in your proposal development. There is no implied guarantee of the quantity and volume of projects. Refer to Section's B and I of the solicitation for ordering limits, including minimum guarantee amount and maximum order and contract values.

C. Documents submitted in response to this RFP must be consistent with the following:

1. Requirements of the solicitation (CLINs and SOW) and Government standards and regulations pertaining to the SOW.

2. Evaluation Factors for Award in Section M of this solicitation.

3. If a part in a proposal exceeds the specified page limit cited in the part content, the excess pages will not be evaluated.

4. Format for proposal Parts I, II, III, and IV shall be as follows:

(a) Each part of the proposal shall be submitted in an electronic version only. E-mail or DoD SAFE is an acceptable means of submission. If using DoD Safe, email daniel.swoyer.1@us.af.mil and hannah.tolbert.1@us.

af.mil , ask for a drop-off request via DoD SAFE (Secure Access File Exchange) Service by 2:00 PM on 20 September 2021. Instructions on how to use DoD SAFE can be found at https://safe.apps.mil/. Physical media will not be accepted this includes, printed copies, compact discs and thumb drives. Printed hard-copy proposals will not be accepted. The following paragraphs provide format parameters for each part, if printed by the Government.

(b) Each part shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable).

(c) Cover pages, Table of Contents, and Tabs will not be counted against the page limits. However, pages depicting tables, charts, graphs and figures will count toward the page limit.

(d) The proposals will be on 8 1/2" x 11" paper, except for fold-outs used for charts, tables, or diagrams, which may not exceed 11" x 17".

(e) A page is defined as one side of a sheet of paper containing information. Both sides may be printed on one sheet of paper, but count as two pages in the overall page count.

(f) All printing shall be single-spaced. Spacing characteristics are applicable to charts and graphs.

(g) Written entries shall not be less than 11 font size. Size of print is applicable to charts and graphs.

(h) Page margins shall be a minimum of 1 inch top, bottom, and each side.

(i) Each part shall be complete in itself and shall not reference information contained in other parts. Page 1 of a part is defined as the first page after the Table of Contents. All pages shall be numbered.

(j) Price data of any kind shall be presented only in the Price Proposal Part.

(k) Elaborate formats, bindings, and color presentations are not desired or required.

(l) All files must be in searchable PDF format and must be able to be opened on Government computers. The same format used for the initial proposal shall be used for the final proposal resulting from any discussions and /or updates, if applicable. Offerors are advised to submit proposals in time to verify that the Government received the files and that the files can be opened and read. Any unreadable portions of the contractor's proposal will be processed IAW FAR 15.207(c).

(m) Each page should contain the following footer at the bottom of each sheet:

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

CONTROLLED UNCLASSIFIED INFORMATION

The following table summarizes the proposal submission:

PART I:

TITLE: Summary and Miscellaneous Data (File Name: Part I) Electronic copy: 1 Page limit: Only required documents will be accepted (See B 2 Part I -Summary and Miscellaneous Data)

PART IIa:

TITLE: Past Performance Questionnaires (File Name: Part IIa) Electronic copy: 1 Page limit: Only required documents will be accepted (See B 3 (a) Part IIa, Past Performance Questionnaires)

PART IIb:

TITLE: Past Performance Information (File Name: Part IIb) Electronic copy: 1 Page limit: Ten (10) Pages (See B 3 (b) Part IIb - Past Performance Information) *Three additional pages given, if Teaming Consent Form and additional required information is completed*

PART III:

TITLE: Technical Acceptability (File Name: Part III) Electronic copy: 1 Page limit: Five (5) Pages (See B 4 Part III - Technical Acceptability)

PART IV:

TITLE: Price Proposal (File Name: Part IV)

Electronic copy: 1 Page limit: Only required documents will be accepted (See B 5 (a) and (d) Part IV - Price Proposal)

D. General Information:

1. Late proposals will be processed in accordance with FAR 52.2151(c)(3), "Submission, modification, revision and withdrawal of proposals."

2. Offerors are cautioned that JBER has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance.

Note: Contractors must comply with Joint Base Elmendorf-Richardson, State of Alaska, and local Municipality Health Mandates, and respect any guidelines or restrictions imposed by local businesses. These policies frequently change. The latest COVID-19 information can be found at:

Joint Base Elmendorf-Richardson (JBER) JBER COVID-19 POLICY MEMO https://www.jber.jb.mil /Coronavirus/Municipality of Anchorage EMERGENCY ORDERS https://covid-response-moa-muniorg.hub.arcgis.com/pages/emergency-orders State of Alaska COVID-19 (CORONAVIRUS) INFORMATION https://covid19.alaska.gov/

(a) A site visit for the seed project will be held at Joint Base Elmendorf Richardson (JBERE) on 09 August 21 to start at 10:00 AM Alaska Time (AKDT) at Building 798. All costs associated with attending the site visit shall be borne by the offeror. Prospective offerors are urged to attend the site visit. If a contractor is unable to attend, there will be no future site visits scheduled.

(b) All contractors, including those that have access to Joint Base Elmendorf-Richardson (JBER), wishing to participate in the site visit shall provide the following information for individuals attending the scheduled site visit:

**SAMPLE**

Company Member: Name, Phone, Email, Driver's License with State and Date of Birth or Copy of Driver's License.

Provide the information to 673 CONS NLT 12:00 Noon AKDT 5 August 21. Provide the information via email to the following address: hannah.tolbert.1@us.af.mil and daniel.swoyer.1@us.af.mil.

(c) Visitor passes will be processed for issue at the Visitor Control Center. Due to construction, the Boniface Visitor Gate is closed. Visitors can obtain visitor passes at the Fort Richardson Visitor Gate, if needed. Allow some delay while obtaining the pass. The following information will be required when getting your pass:

(i) License

(ii) Registration

(iii) Proof of Insurance

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

M-01 Section M - Evaluation Factors for Award

BASIS FOR CONTRACT AWARD

A. General. This is a competitive Subjective Tradeoff Technically Acceptable (STOTA) best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Department of Defense (DoD) FAR Supplement Procedures, Guidance and Information Subpart 215.3, and Air Force FAR Supplement (AFFARS) Mandatory Procedure (MP) 5315.3 in which competing offerors past performance and technical acceptability combined are significantly more important than price. By submission of its offer, the offeror agrees to all solicitation requirements, including terms and conditions, representations and certifications, in addition to those identified as evaluation factors or sub factors. Failure to meet a solicitation requirement may result in an offer being determined unacceptable. The Government reserves the right to award a contract to other than the lowest Total Evaluated Price. In that event, among the technically acceptable proposals, the Source Selection Authority will make an integrated assessment best value award decision using the Total Evaluated Price (TEP) and the Past Performance Confidence Rating. The evaluation process will include the following.

1. The Government will only evaluate one proposal from each offeror. Up to five (5) awards will be made to the responsible offerors whose proposals conform to all required terms and conditions, includes all required representations and certifications, meets all requirements set forth in the RFP, and provides the best value to the Government based on the results of the evaluation as described in Section M below. The Government will also select not more than ten (10) On-Ramp contractors, as described in Section H, with effective dates "To Be Determined."

B. Proposal Evaluation

1. The following evaluation factors will be used to evaluate each proposal.

Factor 1 - Past Performance Factor 2 - Technical Factor 3 - Price

C. Part II, Past Performance The purpose of the past performance evaluation is to assess the degree of confidence the Government has in the offerors ability to meet the contract performance based on the offerors demonstrated record of performance. All past performance records will be assessed for recency. Only recent past performance records will be assessed for relevancy. Only records determined to be recent and relevant will be assessed for quality. The overall assessment process will result in an offerors overall performance confidence assessment rating of one of the following ratings: Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence, or No Confidence.

1. The Government will evaluate past performance information on all eligible offerors. The evaluation may be based upon (i) the references provided by the offeror, (ii) past performance information obtained from questionnaires (Attachment J-12), (iii) relevant contracts/projects information, and (iv) any other information independently obtained by the Government. If a reference identified by the offeror in accordance with Sec L, paragraph 3(b)(1)(h), does not submit a questionnaire, the Government will follow up with the reference POC, but it is not responsible for the failure of a reference POC to provide a survey/questionnaire.

2. Recent Past Performance is defined as those efforts completed for any customer(s) within the last three (3) years prior to the issuance date of the solicitation.

3. Relevant Past Performance includes exterior commercial painting projects of multiple stories with varying surfaces, completed above the 60th parallel (e.g. Alaska).

4. The evaluation of past performance information (i) will not take into account past performance regarding predecessor companies, (ii) will not take into account past performance of key personnel who have relevant experience, (iii) will not take into account past performance regarding subcontractors, (iv) will not take into account past performance information regarding sister companies, and (v) will not take into account past performance as a subcontractor. The government will only consider past performance for subcontractors who are identified as a party to a valid teaming arrangement IAW FAR Subpart 9.6.

5. Relevancy of past performance is defined as follows.

Past Performance Relevancy Ratings:

Rating: Relevant. Definition: Past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Rating: Not Relevant. Definition: Past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

6. Performance Quality Assessment: Recent and relevant past performance will be assessed for quality with a focus on quality control, timely performance, effectiveness of management, and regulatory compliance.

7. Past Performance Confidence Assessment Ratings. As a result of the assessment of past performance information (as described above), each offeror will be assigned a single past performance confidence rating at the factor level.

Rating: SUBSTANTIAL CONFIDENCE. Description: Based on the offerors recent/relevant performance record, the government has a high expectation that the offeror will successfully perform the required effort.

Rating: SATISFACTORY CONFIDENCE. Description: Based on the offerors recent/relevant performance record, the government has a reasonable expectation that the offeror will successfully perform the required effort.

Rating: NEUTRAL CONFIDENCE. Description: No recent/relevant performance is available or the offerors performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Rating: LIMITED CONFIDENCE. Description: Based on the offerors recent/relevant performance record, the government has a low expectation that the offeror will successfully perform the required effort.

Rating: NO CONFIDENCE. Description: Based on the offerors recent/relevant performance record, the government has no expectation that the offeror will successfully perform the required effort.

Note: In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation.

Offerors with no recent or relevant past or present performance history or the offerors performance record is so limited that no confidence assessment rating can be reasonably assigned will receive the rating "Neutral Confidence," meaning the offeror is treated neither favorably nor unfavorably (neutral). Offerors with neutral past performance may still be considered for award.

D. Part III, Technical Acceptability The Government will evaluate the offeror's proposal against the following subfactors to determine whether the proposal is acceptable or unacceptable. Failure to receive an acceptable rating in any one subfactor will result in an overall unacceptable rating of the technical proposal.

Rating: Acceptable - Proposal meets the requirements of the solicitation.

Rating: Unacceptable - Proposal does not meet the requirements of the solicitation.

1. Subfactor - Technical Narrative: The subfactor will be accessed as acceptable if offeror's technical approach for the seed project is complete and compliant with SOW Section 3.3.3 Hazardous Material Handling and JBER

Hazardous Waste Management Plan (Attachment J-03).

2. Subfactor - Training and Certifications: The subfactor will be accessed as acceptable if offeror's provide requested certifications for planned abatement personnel who will perform the seed project that meet local, state and federal regulatory laws and regulations for testing, abatement, and disposal of hazardous material, IAW SOW Section 3.3.3 Hazardous Material Handling.

E. Part IV, Price Proposal

1. Price Evaluation Factor- Offerors must include a price for the seed project listed Seed Project Price Schedule (Attachment J-16). The price evaluation team will evaluate Total Evaluated Price (TEP) for all offerors. The TEP is the extended price for the seed project.

2. The Government may use various price analysis techniques and procedures to ensure a fair and reasonable price. Examples of such techniques include, but are not limited to the following:

(a) Price analysis: The process of examining and evaluating a proposed price without evaluating its separate cost elements and proposed profit.

(b) Comparison of proposed prices received in response to the solicitation. Normally, adequate price competition establishes price reasonableness.

(c) Comparison of previously proposed prices and previous Government contract prices with current proposed prices for the same or similar effort.

2. The Government reserves the right to perform price realism analysis. Price realism is the evaluation of the proposed price and determination that the project can realistically be completed within the proposed constraints.

If the Government elects to perform a price realism analysis, the Government reserves discretion over the method within which it performs its price realism analysis. If the Government elects to perform a price realism analysis and finds a proposal unrealistically low, the Government may withhold award to that offeror.

3. The seed project is an actual project that the Government may award.

F. The Government intends to award without discussions, but reserves the right to conduct discussions if deemed necessary. If the Government establishes a competitive range to conduct discussions, the contracting officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

G. Upon completion of the integrated assessment, the Government intends to award up to five (5) Exterior Paint IDIQ contracts to the offerors whose proposals represent best value. The Government may award a contract to other than the lowest price offeror.

H. Once selected awardees have been identified for the IDIQ, the Government will rank each selected awardee by price from lowest to highest for the seed project (Attachment J-16) and award the lowest priced proposal for seed project. A pre-performance orientation seminar will be held in which all awardees will receive their first task order for $500.00 for attendance.

I. The Government will identify a rank ordered pool of on-ramp contractors not to exceed ten (10) contractors in the event that future contractors deemed necessary to on-ramp onto the contract. The rank order will be established using the same evaluation criteria herein. Refer to the On/Off-Ramp Clauses in Section H of the solicitation for further detail.

IDCode:
Page: 1
Pages: 12
AmendNo: 0001
EffDate: 27 Aug 2021
ReqNo:
ProjNo: See Schedule
IssCode: FA5000
AdmCode:
IssuedBy: FA5000 673 CONS LGC

10480 SIJAN AVE STE 242

CP 907 552 5614

JBER, AK 99506-2501

UNITED STATES

HANNAH TOLBERT, Email: hannah.tolbert.1@us.af.mil Telephone: 907-552-3771

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA500021R0022
SolDate: 29 July 2021
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Susan Reinhart

Email: susan.reinhart.1@us.af.mil Telephone: 907-552-8116

ContDate:
CODate: