Attch_6_QA1_10_Apr_17.pdf

PDF 661 KB Posted

Attached to
Furnishings Management Section (FMS) Federal contract opportunity
Solicitation number
FA5000-17-R-0010
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attch 6_QA1_10 Apr 17

View the file

Other files for this federal contract opportunity

Other files attached to Furnishings Management Section (FMS), newest first.
File Type Posted
FA5000-17-R-0010-A0002.pdf PDF
Attch_8_QA2_13_Apr_17.pdf PDF
Attch_1_PWS_12_April_17.pdf PDF
Attch_4_PS-excel.xlsx XLSX spreadsheet
Attch_7_Site-Visit_Attendance_&_Slides.pdf PDF
FA5000-17-R-0010-A0001.pdf PDF
Attch_1_PWS_10_April_17.pdf PDF
Attch_2_WD_05-2017_Rv-22.pdf PDF
Attch_4_PS-excel.xlsx XLSX spreadsheet
Attch_4_PriceSchd.pdf PDF
Attch_5_GFP.pdf PDF
Attch_1_PWS_20170327.pdf PDF
FA5000-17-R-0010.pdf PDF
Attch_3_PPQ170329.pdf PDF
Pre-Solicitation_Amendment_04.pdf PDF
PWS_(03_Mar_17)_DRAFT.pdf PDF
Pre-Solicitation_Amendment_03.pdf PDF
FMS_QA_21_Feb_17_A03.pdf PDF
Pre-Solicitation_Amendment_01.pdf PDF
FMS_PWS_09_Feb_2017_DRAFT_A02.pdf PDF
FMS_QA_14_Feb_17_A02.pdf PDF
FMS_Pre-Solicitation.pdf PDF
FMS__PWS_(12_Jan_2017)_DRAFT.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A RFP Ref Submitted Questions Answer

Table 1 dates

& 1449 pg 1

What is the correct time(s) and date(s) for proposal submission?

Proposal Parts are due as stated in Table 1, 1449 block 8 is final due date of all parts

52.212-1

Addendum

Table 1

In the chart on page 26/58 in the “Title” column, the file name for Price is “Part IV”, shouldn’t that be “Part II”?

Administrative error; "IV" will be changed to "II"

Attch 4

Price List

Is the inclusion of IGCE on Price column

(excel and PDF) Need to remove it.

52.212-1

Addendum

Table 1

Will the Government consider changing to

Central Time Zone to match AMRDEC for the time proposals are due?

Yes, the government will change the RFP to Central Time Zone.

52.212-1

Addendum

Will the Government consider changing paragraph D(1) last sentence to reflect the

"Official Time of receipt" as the "uploaded time stamp" provided by AMRDEC on the

Recipients (Gov) email? (instead of the time of the email its self.)

Yes, the government will change the

Addendum to reflect the "upload time" as the official time of receipt.

6 Attch 4

CLINs xxx5 and xxx6 descriptions don't match the Attachment 4 Price Sheet structure. Will the government be updating the CLIN Structure or the Price

Sheet?

Attachment 4 "Price Sheet" will be updated to match the CLIN structure for

CLINS x005 & x006

PWS Appendix

3A

States 3A is subject to 52.245-2, PWS

Appendix Table states Appendix 3A is subject to 52.245-1. Which is correct?

PWS Appendix 3A will be corrected to state that 52.245-1 applies.

3. Part III –

Past

Performance

Proposal

Do the attachments supporting the quality and satisfaction ratings of our contracts count towards the 5 pages we are allowed for each contract?

Yes, attachments count toward the 5 pages allowed per contract. Note: IAW 52.212-1

Addendum, paragraph C (3) "excessive pages will not be evaluated".

Appendix 2

Is supporting lodging a new requirement to this contract? If yes, please provide the estimated workload for supporting lodging?

Reference to supporting lodging facilities has been removed from Section A2.1 in the PWS and will not be a requirement.

Appendix 2

The Base Year workload for items to be disposed through DLA/DS is 13,100 items higher than the Option Year workload, can the government explain the difference?

The government intends to divest multiple aged barracks facilities and dispose of the furnishings from those facilities during the base year.

Question and Answer_A01 10-Apr-17

FA5000‐17‐R‐0010-A0001, Attachment 6 Q&A

Appendix 2

The workload is showing additional 13,100 items that the contractor must disposed of in the base year, will the government please provide an estimated list per item so the offeror can estimated the additional staffing for the increase in workload?

At the current time the government intends to divest multiple barracks facilities

(buildings 602, 624, 628, 630, 632 and 38 temporary barracks) that will no longer be utilized as barracks. The furnishings from those facilities will be moved and disposed through DLA. Inventory was provided by building to determine what will be disposed. Those facilities comprise 1144 bed spaces with approximately: 1223 beds, 1223 mattresses, 2173 2-drawer chests, 418 night stands, 430 4 -drawer chests, 799 desks, 230 microwaves, 348 refrigerators, 108 dryers, 68 washers, 4 ranges, 12 couches, 30 tables, 672 wall lockers, 824 desk chairs. Total number items is current inventory is about 9,291.

PWS 1.3

Is the contractor responsible to perform

100% joint inventories each year of the contract at all Unaccompanied facilities listed in Appendix 2 – A2.1?

Yes, except the inventory will be reduced for option years as barracks are divested and furnishings disposed from 602, 624, 628, 630, 632 and 38 temporary barracks.

PWS 1.3

Please clarify that the contractor must have 100% joint inventory completed of all buildings listed in Appendix 2 –A2.1 in the first 10 months of performance in each contract year?

The contractor must complete the joint inventory in 10 months and will have 2 months to validate and provide a report to the government as indicated in Appendix

2.

PWS 1.4

Paragraph 1.4.1 states, “The contractor will clean dayrooms and common areas furniture in-place at least once a year.”

Please provide the number of dayrooms and common furniture the contractor is responsible to clean each year?

Each building in Appendix 2-A2.1 has a dayroom and a common area. This requirement will not be included in option years for buildings 602, 624, 628, 630, 632.

PWS 1.4.1

Paragraph states, “Upon rare exception, as mission dictates, the Government may require the contractor to inventory, transport, and/or dispose furnishings and appliances for the purpose of, but not limited to: divesture, construction, renovation, or demolition of facilities. In these occurrences, work load may deviate by 10 percent of estimated workload data provided in Appendix 2.” Please provide the estimated workload per year that the government with construction, renovation and demolition of facilities so offerors can estimate the staffing required per year?

This paragraph has been removed from the

PWS.

PWS 1.4.1

Paragraph states, “Upon rare exception, as mission dictates, the Government may require the contractor to inventory, transport, and/or dispose furnishings and appliances for the purpose of, but not limited to: divesture, construction, renovation, or demolition of facilities. In these occurrences, work load may deviate by 10 percent of estimated workload data provided in Appendix 2.” Please clarify if the customer renovates a 400 room new barracks building, the contractor would be required to bar code and inventory the building as price of the firm-fixed price?

This paragraph has been removed from the

PWS.

PWS 1.4.1.1.1

Paragraph 1.4.1.1.1 states, “Delivery and pickup shall be to housing located within a

50 mile radius of the FMS warehouse, building 724.” What is the current delivery and pickup radius of the current contract?

The present contract is based on deliveries in the Anchorage Bowl (Peters Creek to the

North and Rabbit Creek on the South.

PWS 1.4.1.1.1

Paragraph 1.4.1.1.1 states, “Delivery and pickup shall be to housing located within a

50 mile radius of the FMS warehouse, building 724.” Will the government please clarify the delivery radius by city or street or road name so the offeror can estimate travel time?

Deliveries will be made within a 50-mile radius from the FMS warehouse, building

724 on JBER to include as far out as

Girdwood, Big lake and Sutton.

PWS 1.4.1.1.1

Paragraph 1.4.1.1.1 states, “Delivery and pickup shall be to housing located within a

50 mile radius of the FMS warehouse, building 724.” The above statement includes Girdwood, Big Lake and Sutton, can the contractor reschedule deliveries if road conditions are not recommended for safe travel by the DOT?

If road conditions are not recommended for safe travel by the DOT, the delivery may be rescheduled. Contractor will let the government know when this occurs and the new delivery date.

PWS 1.4.1.1.1

Paragraph 1.4.1.1.1 states, “In a government deemed emergency, the

Contractor may be required to perform short notice pickup or deliveries after normal hours or on weekends and holidays with CO/COR directive.” Please provide the estimated workload for emergency pickup and deliveries the contract is responsible for each year?

The government does not have historical workload data for these circumstances.

PWS 1.4.1.1.2

Please clarify if the offerors are allowed to utilize flatbed trucks to move furnishings or if box trucks are required?

Flatbed trucks can be used when turning in or removing large amounts of furniture from a facility. A box truck is required for daily operations.

PWS 1.4.1.1.6

Please clarify if the contractor or the government is responsible for the cost of the replacement appliances?

Replacement appliances will be a government cost. The contractor is responsible for replacement if the appliance is damaged by the contractor.

See Section 1.3.1.1.

PWS 1.4.1.1.6

If a refrigerator is deemed unserviceable, is the contractor or government responsible for the cost to drain and dispose the refrigerants from the unserviceable refrigerator?

The contractor is responsible for proper removal and disposal of refrigerants from unserviceable refrigerators/freezers.

Section 1.4.1.1.6 will be revised to indicated that the contractor is responsible for proper removal and disposal of refrigerants as required by DLA.

PWS 1.4.1.1.6

Please provide the historical number of refrigerators that required for refrigerants to be drained?

The government does not have historical workload data showing the number of refrigerators that required removal of refrigerants prior to disposal.

PWS 1.4.1.1.6

Does the historical appliance repairs listed in Appendix 2, A2.2 include the refrigerators that required for the refrigerant to be drained?

The workload data provided in Appendix 2 includes refrigerators that may need to be repaired, but not disposed. The government does not have historical workload data showing the number of refrigerators that required removal of refrigerants prior to disposal.

PWS 1.4.1.1.6

Is the current JBER Furnishings

Management Contractor performing the

Appliance Repair Program for

Accompanied, Unaccompanied and lodging facilities? If not, who is currently performing the Appliance Repair Program?

In the present contract the contractor does perform repairs on accompanied appliances. Present contract does not have contractor performing appliance repairs for unaccompanied or lodging.

When an appliance needs repairs the government calls a local service to perform the repairs.

PWS 1.4.1.1.6

Please verify that all appliances have been bar code? All appliances have been bar coded.

PWS

1.4.1.1.6.1

Please clarify if the contractor or the government will be responsible for the staffing the service call desk?

The contractor is responsilbe for staffing for accepting and logging service calls as a part of normal operations.

PWS

1.4.1.1.6.1

Paragraph 1.4.1.1.6.1 states, “The

Contractor shall response to service calls within two (2) days and complete work within three (3) duty days.” If the contractor has to order a specialized parts will the contractor be allowed additional time from when the parts arrive?

The contractor will be allotted additional when specialized parts need to be ordered or when parts delivery cannot be accomplished within the time period specified in the PWS. The contractor will be responsible to give the government an estimated time when the part is to arrive and a completion time. If there is a significant delay in obtaining parts, the contractor may be required to replace the un-serviced appliance with a functioning unit from the warehouse. The un-serviced appliance will be repaired at the warehouse and returned to inventory.

PWS

1.4.1.1.6.1

Is the contractor responsible for 24/7 response on service calls?

Service calls will only be conducted during normal business hours.

PWS 3.3

Is the government providing any forklifts or vehicles to utilize during the contract?

The items listed in Appendix 3B are the only items the government will provide to the contractor. Forklifts will not be provided.

General Will the government authorize the contractor to lease vehicles through GSA?

No, GSA leases will not be authorized.

RFP, Page

25/58, Table 1

(Part I Due

Date

FBO and the RFP state that Part I Summary and Misc. Data is due 10 days prior to the due date for other parts (FBO states 14

April the RFP states 25 April). As Part I includes amendments will offerors be required to resubmit this part if further amendments are issued?

Question appears to referance Pre-

Solitation documents. Current documents are under "Solicitation 1" dated Mar 29, 2017 and any Amendments dated after that date.