FA5000-17-R-0010-A0001.pdf
PDF 88 KB Posted
- Attached to
- Furnishings Management Section (FMS) Federal contract opportunity
- Solicitation number
- FA5000-17-R-0010
About this file
FA5000-17-R-0010-A0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5000-17-R-0010-A0002.pdf | ||
| Attch_8_QA2_13_Apr_17.pdf | ||
| Attch_1_PWS_12_April_17.pdf | ||
| Attch_4_PS-excel.xlsx | XLSX spreadsheet | |
| Attch_6_QA1_10_Apr_17.pdf | ||
| Attch_7_Site-Visit_Attendance_&_Slides.pdf | ||
| Attch_1_PWS_10_April_17.pdf | ||
| Attch_2_WD_05-2017_Rv-22.pdf | ||
| Attch_4_PS-excel.xlsx | XLSX spreadsheet | |
| Attch_4_PriceSchd.pdf | ||
| Attch_5_GFP.pdf | ||
| Attch_1_PWS_20170327.pdf | ||
| FA5000-17-R-0010.pdf | ||
| Attch_3_PPQ170329.pdf | ||
| Pre-Solicitation_Amendment_04.pdf | ||
| PWS_(03_Mar_17)_DRAFT.pdf | ||
| FMS_QA_21_Feb_17_A03.pdf | ||
| Pre-Solicitation_Amendment_03.pdf | ||
| Pre-Solicitation_Amendment_01.pdf | ||
| FMS_PWS_09_Feb_2017_DRAFT_A02.pdf | ||
| FMS_QA_14_Feb_17_A02.pdf | ||
| FMS_Pre-Solicitation.pdf | ||
| FMS__PWS_(12_Jan_2017)_DRAFT.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1W3EE6154A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make corrections to the solicitation, preceeding the site-visit, and addressing the vendor's questions in the attached Q&A1. Changes have been made to the follow ing areas of the solicitation document:
A. FAR Provisions 52.212-1 and 52.212-2 (Adendums) B. Attachment 4, Price List
C. PWS
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5000-17-R-0010
X 9B. DATED (SEE ITEM 11)
29-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2017
CODE
FA5000 - 673D CONTRACTING SQUADRON
10480 SIJAN AVE
JBER AK 99506-2501
FA5000 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
FA5000-17-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 PWS 171 27-MAR-2017 Attachment 2 WD 05-2017 Rv-22 19 20-FEB-2017 Attachment 3 PPQ 3 29-MAR-2017 Attachment 4 Price Schedule 2 29-MAR-2017 Attachment 5 GFP 2 21-MAR-2017 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 PWS 10-APR-2017 Attachment 2 WD 05-2017 Rv-22 19 20-FEB-2017 Attachment 3 PPQ 3 29-MAR-2017 Attachment 4 Price Schedule 07-APR-2017 Attachment 5 GFP 2 21-MAR-2017 Attachment 6 QA1 10-APR-2017 Attachment 7 Site-Visit Attendance &
Slides
10-APR-2017
The following have been modified:
52.212-1 ADDENDUM
Addenda to FAR 52.212-1 Instructions to Offerors - Commercial Items
(a) Paragraphs 52.212-1(b), “Submission of offers”, and 52.212-1(f), “Late submissions, modifications, revisions, and withdrawals of offers”, are deleted in their entirety and replaced with 52.215-1(c), “Submission, modification, revision, and withdrawal of proposals, by reference”.
(b) Paragraph 52.212-1(c), Period for Acceptance of Offers, is tailored as follows: “The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.”
(c) The following is inserted as new paragraph (m) of the provision:
Proposal Preparation Instructions.
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts: Part I - Summary and Miscellaneous Data, Part II – Price Proposal and Part III Past Performance.
B. Specific Instructions:
1. PART I – SUMMARY AND MISCELLANEOUS DATA. Limited to no more than ten (15) pages. Submit one (1) electronic.
(a) The offeror shall provide a Table of Contents for Part I of the proposal.
(b) Standard Form (SF) 1449. Complete blocks 12, 17a, 30a, 30b, and 30c. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation.
(i) Discount terms offered, if any.
(ii) Contractor/Offeror business name, address, cage code, and telephone no.
(iii) A signed statement acceding to the contract terms and conditions as written in the solicitation.
(iv) Name and Title of Signatory Official in para. (iii), above.
(v) Date of signature of the statement in para. (iii), above.
(c) Complete the necessary fill-ins and certifications in provisions/clauses and in the on-line
Representations and Certifications at www.sam.gov. Return the provision FAR 52.212-3, along with all other provisions and clauses with completed fill-ins, as part of Part I.
(d) Submit an acknowledgment of the all solicitation amendments, if issued.
(e) RESERVED
(f) If none proposed, submit an Affirmation of no Exceptions, Deviations, or Waivers.
2. PART II – PRICE PROPOSAL - Submit one (1) electronic.
(a) This Part shall contain a completed copy of the Section SF 1449 - CONTINUATION SHEET (pgs 3-17) proposed pricing information along with a completed copy of Attachment 4, Price Schedule.
(b) Insert proposed unit price(s) and extended amount(s) in the SF 1449 Schedule of
Supplies/Services for each Contract Line Item Number (CLIN), including all option periods. The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct; particular care should be taken to ensure the amounts match when using the EXCEL program and the rounding of figures.
(c) Use the Excel work sheet (Attachment 4) to provide the pricing information that matches the
SF 1449 Schedule of Supplies/Services for each Contract Line Item Number (CLIN) 0001-0006 and for each option year (1001-1006, 2001-2006, 3001-3006, and 4001-4006)
(d) All dollar amounts provided shall be rounded to the nearest dollar.
(e) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.
3. PART III – PAST PERFORMANCE PROPOSAL - Limited to five (5) contracts with no more than five (5) pages per contract listed. Only references for past efforts/contracts of relevance are desired. Submit one (1) Electronic copy.
(a) Quality and Satisfaction Rating of Contracts: Provide any information currently available
(letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc. (See 52.212- 2(d)(2))
(b) Performance Surveys/Questionnaires: Past Performance Questionnaires (PPQs) shall be used by the offeror in obtaining and providing past performance information. The government requires the offeror send out a PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal (paragraph (c) below).
The offeror shall send out the PPQ (Attachment 3), using the Past Performance Evaluation Cover Letter and Questions to each of their references.
THE RESPONSIBILITY TO SEND OUT THE PAST PERFORMANCE QUESTIONNAIRE RESTS SOLELY
WITH THE OFFEROR.
Once the questionnaires are completed by the POCs, the information contained therein will be considered source selection sensitive and will not be released outside the government. The POCs shall forward their completed questionnaires directly to the government – NOT BACK TO THE
OFFEROR.
PPQs shall be sent directly from your reference to this office marked to the attention of Theresa Derby and Stuart McElhinney via e-mail to theresa.derby@us.af.mil and 673CONS.LGCB.Acquisition@us.af.mil, or mailed to the following address: 673 CONS/LGCB
Attn: Theresa Derby/Stuart McElhinney Sijan Avenue, Suite 240 Joint Base Elmendorf-Richardson, AFB AK 99506
(c) Past Performance Information: Provide a list of no more than five (5), of the most relevant contracts performed for any customer in the last five (5) years. (See addendum to 52.212-2, paragraph (d)(2))
Furnish the following information for each contract listed:
(i) Company/Division name
(ii) Product/Service
(iii) Contracting Agency/Customer
(iv) Contract Number
(v) Contract Dollar Value
(vi) Period of Performance
(vii) Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer (Point-of-Contact)
(viii) Comments regarding compliance with contract terms and conditions
(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.
(x) Include rationale supporting your assertion of relevance and identify aspects of the contracts deemed relevant and how they relate to the proposed effort.
If an offeror has no past performance history of relevance, the offeror must affirmatively state it possesses no past performance history of relevance.
(d) The evaluation of past performance information will take into account past performance regarding (i) predecessor companies, (ii) will take into account past performance of key personnel who have relevant experience, and/or (iii) will take into account past performance regarding subcontractors that will perform major aspects identified in PWS Sectios1.3.1.1.3 (Warehouse Management), 1.4.1.1 (Pick-up and Delivery) and
1.4.1.1.6 (furnishings and Appliance Repair Program) of the requirement when such information is relevant to this acquisition.
If subcontractors are going to be utilized, the prime contractor shall provide the percentage of work and type of work to be performed by each subcontractor.
(e) If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past contracts of relevance.
(f) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from each subcontractor consenting to the release of its past performance information to the prime contractor that will perform major aspects identified in PWS sections 1.3.1.1.3 (Warehouse Management), 1.4.1.1 (Pick-up and Delivery) and
1.4.1.1.6 (furnishings and Appliance Repair Program) of the requirement.
C. Documents submitted in response to this RFP must be consistent with the following:
1. Requirements of the solicitation (CLINs and PWS) and government standards and regulations pertaining to the PWS.
2. FAR 52.212-2, Evaluation – Commercial Items, of this solicitation.
3. If a Part in a proposal exceeds the specified page limit cited in the Part Content, the excessive pages will not be evaluated.
(i) Each Part shall be complete in itself and shall not reference information contained in other Parts. Page 1 of a Part is defined as the first page after the Table of Contents. All pages shall be numbered.
(j) Price data of any kind shall be presented only in the Price Proposal Part.
(k) Elaborate formats, bindings, and color presentations are not desired or required.
The following table summarizes the proposal submission:
Table 1:
PART TITLE ELECTRONIC
COPY
PAGE LIMIT DUE DATE
I Summary and Misc. Data (File Name: Part I) via AMRDEC 15 pages 14 Apr 17; 01:00 PM (Central Time Zone)
II Price (File Name: Part II) via AMRDEC No page limit 24 Apr 17; 01:00 PM (Central Time Zone)
III Past Performance (File Name:
Part III) via AMRDEC 25 pages 24 Apr 17; 01:00 PM (Central Time Zone)
4. Format for proposal Parts I and III shall be as follows:
*NOTE – The following information is to be understood if the Contracting Office were to print the proposals*
(a) Each written Part of the proposal shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable). Cover pages, Table of Contents, and Tabs will not be counted against the page limits. However, pages depicting tables, charts, graphs and figures will count toward the page limit. The number of copies of each part is specified in Table 1.
(b) A page is defined as one face of a sheet of paper containing information.
(c) All pages shall be single-spaced. Spacing characteristics are applicable to charts and graphs.
(d) Typing shall not be less than 12 point font; a minimum of 10 point font will be accepted for charts and graphs.
(e) Page margins shall be a minimum of 1 inch top, bottom, and each side.
(f) Proposal Parts must be uploaded via AMRDEC by the date/time stated in Table 1. The proposal shall be submitted in a PDF format or format readable by Microsoft Office 2010 which includes software programs such as EXCEL, MS WORD or PowerPoint. Attachment 4, Price Schedule, must be submitted in MS-Excel format compatible with MS 2010. The Price Part shall be submitted in spreadsheet format, such as EXCEL, and MS WORD for price narrative.
(g) Each Part shall be complete in itself and shall not reference information contained in other Parts. Page 1 of a Part is defined as the first page after the Table of Contents. All pages shall be numbered.
(h) Price data of any kind shall be presented only in the Price Proposal Part.
(i) Elaborate formats, bindings, and color presentations are not desired or required.
D. General Information:
1. Proposals will only be accepted via the AMRDEC upload. The AMRDEC website is accessed at https://safe.amrdec.army.mil/safe/. When submitting Offerors should use the non-CAC user instructions. Include the following in requested blocks; “Description of Files” [FMO-company name and Proposal Part] and enter:
theresa.derby@us.af.mil and stuart.mcelhinney@us.af.mil as “Recipients”. You will receive a “Verification is Required” email from AMRDEC with instructions which include a link and a password. Once upload has occurred, you will receive a confirmation on the website and a “Package Status”. The Recipients will receive a similar email stating “download is available” and will send an acknowledgement email back to the originator.
The Date/Time stamp on the Recipients “download available” email stating the upload time/date (Central Time Zone) will be used as the government’s Official Receipt of the proposal.
2. Questions/requests for clarifications shall be submitted in writing via email to all of the following personnel:
Theresa Derby; theresa.derby@us.af.mil Stuart McElhinney; stuart.mcelhinney@us.af.mil
3. Responses to questions and request for clarifications will be posted no later than seven calendar days before the SF 1449 block 8 date. No additional questions will be received after that time
(End of Addenda)
(End of Summary of Changes)
| Proposal Preparation Instructions. |
| 4. Format for proposal Parts I and III shall be as follows: |
| *NOTE – The following information is to be understood if the Contracting Office were to print the proposals* |
| D. General Information: |
File details come from the government source that posted it. Updated .