Sch. Maint Jan. 2020.pdf
PDF 103 KB Posted
- Attached to
- Boiler Maintenance on JBER-Elmendorf Federal contract opportunity
- Solicitation number
- FA5000
About this file
This document contains a performance work statement and solicitation for boiler maintenance services on Joint Base Elmendorf-Richardson in Alaska. The 773rd Civil Engineering Squadron requires maintenance of 113 boilers under 1,000 MBH, 100 boilers over 1,000 MBH, 15 hydronic boilers, 1 furnace, 28 steam hot water heaters, and 28 gas unit heaters. Services include planning, coordination, surveillance, and ensuring disciplined work performance. The contractor must implement and maintain management control systems. The base period of performance is 1 September 2020 through 31 August 2021, with three option periods through 31 August 2024. The contractor shall provide all labor, vehicles, equipment, tools, materials, supervision and other property and services except government furnished property. A fixed price contract is contemplated. This is a competitive total small business set-aside. The NAICS code is 811310 with a $8 million size standard. Interested parties must register in SAM to be eligible for award. The solicitation will be posted on the 673rd Contracting Squadron website.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CM Log 2019.pdf | ||
| (CM) WORK ORDER LOG Week (Main).pdf | ||
| Boiler Maintenance Workload Data for CLIN X002.pdf | ||
| Question for Solicitation FA5000-20-R-0016.pdf | ||
| Amendment FA500020R00160002 SF 30.pdf | ||
| FA500020R00160001 SF 30.pdf | ||
| Pre-Proposal Conference 3-12-20.pdf | ||
| Atch 2 - WD 2015-5681 R9 dated 12232019.pdf | ||
| Solicitation - FA500020R0016.pdf | ||
| Attachment 1 - PWS 20200303.pdf | ||
| Attachment 3 - Past Performance Questionnaire (PPQ).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date/Week Due Bldg. Number Equiptment Est. Hours Type Services/Inspection Completed
1/1/2020 2204 (A2) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 2204A (A3) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/1/2020 2212 (A4) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 2218 (A5) 3 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 4109 (A6) 7 Boilers 1.35 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 4241 (A7) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/31/2020
1/1/2020 4251 (A8) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 5126 (A9) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/1/2020 5201 (A10) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/31/2020
1/1/2020 5223 (A11) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/31/2020
1/1/2020 5250 (A12) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 5253 (A13) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/1/2020 5257 (A14) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/31/2020
1/1/2020 5329 (A15) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 5333 (A16) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 5385 (A17) new Boilers 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 6104 (A18) 3 Boilers 0.85 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 6136 (A19) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/1/2020 6210 (A20) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/1/2020 6211 (A21) 3 Boilers, 1 AC, 1WS 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/1/2020 6230 (A22) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/1/2020 6252 4 UH O ANG Building
1/1/2020 6253 (A23) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/1/2020 6254 (A25) 4 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/1/2020 6256 4 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/7/2020 6258 (A27) 2 Boilers, 1UH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/7/2020 6260 (A28) torn down 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/7/2020 6262 (A29) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/7/2020 6263 (A30) 4 Boilers, 2 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 6264 (A31) 4 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 6266 (A32) 4 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/7/2020 6315 (A33) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/13/2020
1/7/2020 6326 (A34) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/7/2020 6346 (A35) 2 boilers 0.85 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/14/2020
1/7/2020 7079 (A36) 2 Boilers, 2 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/20/2020
1/7/2020 7113 (A37) 2 Boilers, 2 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/14/2020
1/7/2020 7122 (A38) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/7/2020 7137 (A39) 2 Boilers 0.85 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/7/2020 7148 (A40) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/7/2020 7153 (A41) 2 Boilers, 2 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/7/2020 7163 (A42) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7176 (A43) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7179 (A44) 2 Boilers, 2WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7181 (A45) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7228 (A46) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
7250 Work suspended for this building until further notice.
1/7/2020 7265 (A48) 2 Boilers, 1 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7271 (A49) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/7/2020 7301 (A50) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/7/2020 7309 (A51) 2 Boilers 0.85 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/14/2020 7377 (A52) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/14/2020 7508 (A53) 2 boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/9/2020
1/14/2020 7535 (A54) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/9/2020
1/14/2020 8088 (A55) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8113 (A56) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8124 (A57) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8197 (A58) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/30/2020
1/14/2020 8199 (A59) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/14/2020 8237 (A60) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 8288 (A61) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/14/2020 8306 (A62) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8317 (A63) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8326 (A64) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8364 (A65) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8378 (A66) 2 Boilers, 2 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/20/2020
1/14/2020 8450 (A67) 2 Boilers, 1 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/27/2020
1/14/2020 8481 (A68) 1 Furance 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/14/2020 8515 (A69) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/27/2020
1/14/2020 8517 (A70) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/14/2020 8535 (A71) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/31/2020
1/14/2020 8549 (A72) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/14/2020 8559 (A73) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 8565 (A74) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 8574 (A75) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/27/2020
1/14/2020 9268 (A76) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/20/2020
1/14/2020 9311 (A77) 3 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 9327 (A78) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/20/2020
1/14/2020 9336 (A79) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/20/2020
1/14/2020 9341 (A80) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/27/2020
1/14/2020 9361 (A81) 2 Boilers, 2 WH 1.2 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 9387 (A82) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/15/2020
1/14/2020 9477 (A83) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/14/2020 9480 (A84) 3 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/27/2020
1/21/2020 9497 (A85) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 9510 (A86) 3 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/21/2020 9549 (A87) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/21/2020 9551 (A88) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/21/2020 9559 (A89) 1 Boiler 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 9569 (A90) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/28/2020
1/21/2020 10286 (A91) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/30/2020
1/21/2020 10306 (A92) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/21/2020 10369/10364 (A93) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/29/2020
1/21/2020 10427 (A94) 2 Boilers 2.1 Preventive Froze up, Demo
1/21/2020 10435 (A95) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/30/2020
1/21/2020 10437 (A96) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/30/2020
1/21/2020 10441 (A97) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 10471 (A98) 2 Boilers, 2 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/21/2020 10480 (A99) 2 Boilers 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/8/2020
1/21/2020 10488 (A100) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 10555 (A101) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/7/2020
1/21/2020 10571 (A102) 2 Boilers, 1 WH 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 11415 (A103) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 11519 (A104) 3 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 11523 (A105) 3 UH 2.5 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 11525 (A106) 2 Boilers, 1 WH 2.6 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
1/21/2020 11535 (A107) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/13/2020
1/21/2020 11550/11540 (A108) 3 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable 1/6/2020
1/21/2020 11575 (A109) 2 Boilers 2.1 Preventive Boiler insepctions, Vent Fan, Feed water, Lochinvar inspection if applicable
ScheduledMaintenanceList
File details come from the government source that posted it. Updated .