DepartmentofLaborWageDeterminationsAtch1a b c d.doc

DOC document 126 KB Posted

Attached to
SABER - Various Construction Projects Federal contract opportunity
Solicitation number
FA4877-08-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Wage Determinations

View the file

Other files for this federal contract opportunity

Other files attached to SABER - Various Construction Projects, newest first.
File Type Posted
SF30 Amendment 0003.doc DOC document
SF30 Amendment 0002.doc DOC document
Pre-Proposal Sign In Sheet.pdf PDF
SF30 Amendment 0001.doc DOC document
355th Comm. Price Schedule.pdf PDF
Q A.doc DOC document
FA4877-08-R-0007NEWSABERSOLICITATIONDavis-MonthanAFB.doc DOC document
97-0503-ELEV1-WEST-Layout1.pdf PDF
97-0503-PLUMB-PLN-Layout1.pdf PDF
StatementofWorkAtch3.doc DOC document
97-0503-EXHAUST-PLN-Layout1.pdf PDF
97-0503-FOUND-PLAN-FDN.pdf PDF
COMMSQDesignGuideAtch5.doc DOC document
EnhancedDesignEffort65 and95 SummaryAtch7.doc DOC document
ContractorBidforNonPre-PricedItemsAtch4.doc DOC document
97-0503-SITE-WEST-Layout1.pdf PDF
97-0503-ISOMETRICS-Layout1.pdf PDF
97-0503-ELEC-PLN-LAYOUT1.PDF PDF
PastPerformanceEvaluationQuestionnaireAtch2.doc DOC document
97-0503-MECH-PLN-Layout1.pdf PDF
97-0503-FLR-PL-DIM-Layout1.pdf PDF
97-0503-SERVEY-SITE-WEST-Layout1.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: AZ070001 11/30/2007 AZ1

Contract Document 1a (6 pages) Superseded General Decision Number: AZ20030001

State: Arizona

Construction Type: Building

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma

Counties in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/09/2007

1 02/23/2007

2 04/27/2007

3 06/15/2007

4 07/20/2007

5 08/03/2007

6 09/28/2007

7 11/30/2007

BRAZ0003-003 07/01/2007

COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the

San Francisco River to the Gila River), & YUMA COUNTIES

Rates Fringes

Bricklayer - Cement Block

Layer

$ 23.55 4.49

* BRAZ0003-008 10/05/2007

PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES

Bricklayer - Cement Block

Layer

$ 18.90 4.09

CARP0408-001 09/01/2007

CARPENTER

$ 22.00 5.97

CARP1327-001 01/01/2007

DRYWALL HANGER

$ 17.00 4.91

ELEC0570-003 12/01/2006

PIMA, PINAL (Southern Part), AND YUMA COUNTIES

Electrician/Wireman

Zone 1

$ 20.20 16.5%+4.50

ZONE DEFINITIONS:

Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista & Yuma.

Zone 2: Over 29 miles to 46 miles - add $1.25 to Zone 1 rate.

Zone 3: Over 46 miles - add $3.75 to Zone 1 rate.

ELEC0640-005 06/01/2005

COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian

Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with

Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then

North to the Maricopa-Pinal County Lines) COUNTIES

Electrician/Wireman

$ 22.50 3%+6.04

ENGI0428-003 06/01/2007

Power Equipment Operator

(2) Crane under 15 tons

$ 22.08 8.36

(3) Crane,15 tons to 100 tons

$ 23.16 8.36

(4) Crane, 100 tons and over

$ 24.19 8.36

IRON0075-002 08/01/2007

IRONWORKER, STRUCTURAL

Zone 1:

$ 24.165 15.545

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson

Zone 2: 050 to 100 miles - Add $1.50

Zone 3: 100 to 150 miles - Add $2.75

Zone 4: 150 miles and over - Add $4.00

LABO0383-005 11/01/2006

LABORER (Brick/Block Tender)

$ 14.35 4.10

PAIN0086-003 04/01/2007

PAINTER

$ 17.70 4.10

PAIN0086-005 07/01/2006

GLAZIER

$ 23.00 5.00

PLUM0469-003 07/01/2006

COCONINO, MARICOPA, MOHAVE, AND YUMA COUNTIES

PLUMBER/PIPEFITTER

$ 27.00 12.00

ZONE DEFINITIONS FOR PIPEFITTERS, PLUMBERS, STEAMFITTERS

ZONE 1: Area within a 20 mile radius of the center of the following towns: Flagstaff, Holbrook, Kingman, Lake Havasu

City, Prescott, Show Low, Springerville, St John's, Winslow, and Yuma; and the area within a 40 mile radius of the center of Phoenix.

ZONE 2: Area outside the above areas - Add $3.00 to Zone 1 basic hourly rate.

PLUM0741-003 07/01/2007

PIMA AND PINAL COUNTIES

PLUMBER/PIPEFITTER

$ 24.25 12.65

SFAZ0669-001 01/01/2007

SPRINKLER FITTER (Fire

Sprinklers)

$ 26.40 13.85

SHEE0359-002 08/01/2006

PIMA and PINAL (South of the 33rd Parallel) COUNTIES

Sheet Metal Worker (Including

HVAC)

$ 23.29 3%+7.88

Zone 2

$ 25.29 3%+7.88

Zone 1: 0 to 35 miles from the City Hall in Tucson

Zone 2: Over 35 miles from the City Hall in Tucson

SHEE0359-003 07/01/2007

COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES

Sheet Metal Worker (Including HVAC).

$ 26.00 3%+10.35

SUAZ2004-001 01/14/2004

Cement Mason/Finisher

$ 15.25 5.01

Laborers

Concrete Worker

$ 8.88 0.00

Form Setter

$ 9.63 0.00

General/Cleanup

$ 11.37 2.91

Waterproofing

$ 12.59 0.00

PLASTERER

$ 15.00 0.00

Backhoe

$ 14.78 0.00

TILE FINISHER

$ 11.00 0.00

TILE SETTER

$ 14.98 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: AZ070012 09/28/2007 AZ12

Contract Document 2a (6 pages) Superseded General Decision Number: AZ20030012

State: Arizona

Construction Type: Heavy

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma

Counties in Arizona.

HEAVY CONSTRUCTION PROJECTS (excluding dam construction)

Modification Number Publication Date

0 02/09/2007

1 02/23/2007

2 04/27/2007

3 06/01/2007

4 06/15/2007

5 07/20/2007

6 08/03/2007

7 08/31/2007

8 09/28/2007

BOIL0627-004 10/01/2006

BOILERMAKER

$ 26.71 18.26

* CARP0408-003 09/01/2007

Carpenters: (Including Cement

Form Work)

Carpenter

$ 22.50 5.97

Piledrivermen

$ 23.00 5.97

ELEC0518-005 01/01/2007

PINAL COUNTY (North of the line, "First Standard Parallel

South", and East of the line, "Second Guide Meridian East".

$ 22.50 12%+6.50

ELEC0570-001 12/01/2006

PIMA, PINAL [Remaining Southern Area], and YUMA COUNTIES

Zone 1 (Base Rate)

Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista, Wilcox & Yuma

Zone 2: More than 29 miles to 46 miles - add $1.25 to Zone 1 rate

Zone 3: More than 46 miles - add $3.75 to Zone 1 rate

FRINGES:

The fringe of 14.4% is figured on the base amount excluding any additional zone pay.

ELEC0611-005 12/01/2004

APACHE COUNTY [Area North of Highway 66]

$ 24.55 4%+7.80

ZONE 1: 0 to 10 miles from Gallup, NM

ZONE 2: 10 to 30 miles from Gallup - Add 9% to basic hourly rate.

ZONE 3: 30 to 40 miles from Gallup - Add 15%

ZONE 4: Over 40 miles from Gallup - Add 26%

ELEC0640-001 06/01/2005

COCONINO; MARICOPA; MOHAVE COUNTIES; and the following portion of PINAL COUNTY (Area lying North andWest of the boundary line beginning at a point where Papago Indian Reservation Road No.15 crosses the Pima-Pinal County line, then extending in a

Northeasterly direction on Papago Indian Reservation Road No.

15 to the intersection with Highway FAS-267, extending North on Highway FAS-267 to the intersection with the Florence

Canal, North and East on the Florence Canal to the

North to the Pinal-Maricopa County lines )

ELEC0769-001 05/01/2007

Line Construction:

Cable Splicer

$ 34.60 19%+4.93

Groundman

$ 20.13 19%+4.93

Lineman

$ 34.70 19%+4.93

Powderman

$ 24.47 19%+4.93

Technician, Crane 80 Ton & over, Pilot. .

$ 33.72 19%+4.93

Equipment Operator: 75% of Lineman rate.

HD Equipment Operator: 85% of Lineman rate.

Mechanic: 75% of Lineman rate.

ENGI0428-013 06/01/2007

(2) Asphalt Roller

IRON0075-007 08/01/2007

Ironworker

Rebar & Structural (Zone 1).

ZONE 1: 0 to 50 miles from City Hall in Phoenix or Tucson

ZONE 2: 50 to 100 miles - addf $1.50 to basic hourly rate

ZONE 3: 100 to 150 miles - add $2.75

ZONE 4: Over 150 miles - add $4.00

LABO0383-008 06/01/2007

(2) Concrete Worker

$ 15.64 4.55

(3) Power tools

$ 16.34 4.55

(6) Construction Specialist.

$ 18.14 4.55

PLUM0469-011 07/01/2006

COCONINO, MARICOPA, MOHAVE, YUMA COUNTIES

PLUMBER (Zone 1)

Commercial

$ 27.00 12.00

Industrial

$ 31.00 12.00

ZONE 1: Area within a 20 mile radius of the center of the following towns: Flagstaff, Holbrook, Kingman, Lake Havasu

City, Prescott, Show Low, Springerville, St John's, Winslow, and Yuma; and the area withina 40 mile radius of the center of Phoenix.

ZONE 2: Area outside the above areas - Add $3.00 to Zone 1 basic hourly rate

PLUM0741-005 07/01/2007

PIMA AND PINAL COUNTIES

PLUMBER

$ 24.25 12.65

INDUSTRIAL WORK: Add $2.00 to basic hourly rate

SHEE0359-002 08/01/2006

PIMA and PINAL (South of the 33rd Parallel) COUNTIES

HVAC)

$ 23.29 3%+7.88

Zone 2

$ 25.29 3%+7.88

Zone 1: 0 to 35 miles from the City Hall in Tucson

Zone 2: Over 35 miles from the City Hall in Tucson

SHEE0359-003 07/01/2007

COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES

HVAC)

$ 26.00 3%+10.35

SUAZ2004-007 03/04/2004

$ 17.18 2.12

$ 10.32 0.00

Pipelayer

$ 11.11 1.74

MILLWRIGHT

$ 16.97 3.40

$ 16.82 2.52

Blade/Grader

$ 14.45 2.45

Crane

$ 20.76 4.42

Excavator

$ 18.00 0.00

Loader

$ 16.67 2.14

Scraper

$ 12.91 1.68

Sound & Communication

Technician

$ 22.00 0.00

TRUCK DRIVER

Dump

$ 12.13 1.16

Flatbed Utility

$ 12.50 1.48

Water Truck

$ 11.91 1.32

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

END OF GENERAL DECISION

General Decision Number: AZ070002 09/28/2007 AZ2

Contract Document 3a (5 pages) Superseded General Decision Number: AZ20030002

State: Arizona

Construction Type: Highway

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma

Counties in Arizona.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/09/2007

1 02/23/2007

2 03/09/2007

3 04/27/2007

4 06/01/2007

5 06/15/2007

6 07/20/2007

7 08/03/2007

8 08/31/2007

9 09/28/2007

* CARP0408-003 09/01/2007

Carpenters: (Including Cement

Form Work)

Carpenter

$ 22.50 5.97

Piledrivermen

$ 23.00 5.97

ELEC0570-001 12/01/2006

PIMA, PINAL [Remaining Southern Area], and YUMA COUNTIES

Zone 1 (Base Rate)

Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista, Wilcox & Yuma

Zone 2: More than 29 miles to 46 miles - add $1.25 to Zone 1 rate

Zone 3: More than 46 miles - add $3.75 to Zone 1 rate

FRINGES:

The fringe of 14.4% is figured on the base amount excluding any additional zone pay.

ELEC0640-001 06/01/2005

COCONINO; MARICOPA; MOHAVE COUNTIES; and the following portion of PINAL COUNTY (Area lying North andWest of the boundary line beginning at a point where Papago Indian Reservation Road No.15 crosses the Pima-Pinal County line, then extending in a

Northeasterly direction on Papago Indian Reservation Road No.

15 to the intersection with Highway FAS-267, extending North on Highway FAS-267 to the intersection with the Florence

Canal, North and East on the Florence Canal to the

North to the Pinal-Maricopa County lines )

ELEC0769-001 05/01/2007

Line Construction:

Cable Splicer

$ 34.60 19%+4.93

Groundman

$ 20.13 19%+4.93

Lineman

$ 34.70 19%+4.93

Powderman

$ 24.47 19%+4.93

Technician, Crane 80 Ton & over, Pilot.

$ 33.72 19%+4.93

Equipment Operator: 75% of Lineman rate.

HD Equipment Operator: 85% of Lineman rate.

Mechanic: 75% of Lineman rate.

ENGI0428-011 06/01/2007

Group 1

$ 18.81 8.36

Group 2

Group 3

$ 23.16 8.36

Group 4

$ 24.19 8.36

GROUP 1: Forklift; Oiler; Roller (Dirt); Small self-propelled

Compactor; Tractor (wheel type and D-5 & under).

GROUP 2: Backhoe under 1 cu yd; Crane under 15 tons; Drilling

Machine (including water wells); Pneumatic-Tired Scraper;

Roller (asphalt); Self-propelled compactor; Skip Loader over

3cu yd to 6 cu yd.

GROUP 3: backhoe over 1 cu yd to 10 cu yd; Boring Machine;

Crane over 15 tons to 100 tons; Motor Grader; Overhead Crane;

Skip Loader 6 to 10 cu yd; Paving Machine; Tower Crane.

GROUP 4: Crane 100 tons and over; Skip Loader 10 cu yd or more

Multiple-Unit Earth Equipment (Holland Loader etc), Tractor

(track or tired type) Two Units - $0.50 per hour over base rate, and $1.00 per hour for each additional unit.

All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including

Jibs, shall receive $0.01 per foot per hour over 80 ft in addition to regular rate of pay.

Premium pay for performing hazardous wast removal $0.50 per hour over base rate.

IRON0075-006 08/01/2007

Ironworker, Rebar

ZONE 1: 0 to 50 miles from City Hall in Phoenix or Tucson

ZONE 2: 50 to 100 miles -add $1.50 to basic hourly rate

ZONE 3: 100 to 150 miles - add $2.75

ZONE 4: Over 150 miles - add $4.00

LABO0383-006 06/01/2007

(1) General Laborer;

Cleanup Laborer

$ 14.74 4.55

(4) Asphalt Raker/Ironer; Jackhammer

$ 17.28 4.55

(5) Form Setter

$ 18.14 4.55

$0.50 per hour premiuim for performing hazardous waste removal

SUAZ2004-009 03/11/2004

$ 17.88 2.24

Concrete Worker

$ 12.22 2.86

Concrete/Asphalt Saw

$ 14.27 0.74

Fence Erector, Chain Link...

$ 10.27 2.85

Flagger

$ 12.48 0.00

Grade Checker

$ 12.45 0.00

Guard Rail Installer

$ 13.97 0.00

Pipelayer

$ 13.72 2.88

Bulldozer

$ 17.35 4.18

Gradall

$ 23.02 1.97

Grade Checker/Setter

$ 15.00 4.17

Guard Rail Punch

$ 18.61 3.68

Heavy Duty Repairman /

Welder

$ 21.79 4.31

Screedman

$ 14.50 4.15

Belly Dump

$ 13.00 0.00

TEAM0104-005 06/01/2007

(2) 2-3 Axle dump; Water Truck under 2500 gallons $ 17.18 3.40+a

(3) 4 axle dump

$ 17.58 3.40+a

(4) 5 axle dump; Water Trucks 2500 gal to 3900 gal.

$ 18.20 3.40+a

(5) 6-axle dump; Water Trucks 3900 gal and over $ 18.44 3.40+a

(6) 7 axle dump

$ 19.02 3.40+a

FOOTNOTE:

a. Health & Welfare $586.36 per month.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

General Decision Number: AZ070004 09/28/2007 AZ4

Contract Document 4a (3 pages) Superseded General Decision Number: AZ20030004

State: Arizona

Construction Type: Residential

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma

Counties in Arizona.

EXCLUDING NAVAJO INDIAN RESERVATION IN COCONINO COUNTY

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/09/2007

1 04/27/2007

2 07/20/2007

3 08/03/2007

4 09/28/2007

* CARP0408-008 09/01/2007

Carpenters (Except Metal Stud Framing) $ 22.00 5.97

IRON0075-002 08/01/2007

IRONWORKER, STRUCTURAL

Zone 1:

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson

Zone 2: 050 to 100 miles - Add $1.50

Zone 3: 100 to 150 miles - Add $2.75

Zone 4: 150 miles and over - Add $4.00

SUAZ2004-006 03/08/2004

CARPENTER

Metal Stud Framing

$ 15.00 0.00

$ 13.82 0.36

DRYWALL HANGER

$ 12.00 0.00

Drywall taper/finisher

$ 11.72 0.00

$ 12.14 1.83

Form Setting

$ 9.19 0.36

$ 8.72 0.00

PAINTER

$ 10.41 0.44

PLUMBER

$ 15.13 1.18

Power equipment operators:

$ 13.12 0.00

Blade/Grader

$ 10.00 0.00

Loader

$ 12.87 0.00

Tractor

$ 17.00 0.36

ROOFER, Including Built Up, Composition and Single Ply

$ 10.29 0.00

TILE SETTER

$ 13.33 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal interested party (those affected by the action) can request interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .