ContractorBidforNonPre-PricedItemsAtch4.doc

DOC document 29 KB Posted

Attached to
SABER - Various Construction Projects Federal contract opportunity
Solicitation number
FA4877-08-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Non Pre-Priced Item (NPI) Sheet

View the file

Other files for this federal contract opportunity

Other files attached to SABER - Various Construction Projects, newest first.
File Type Posted
SF30 Amendment 0003.doc DOC document
SF30 Amendment 0002.doc DOC document
Pre-Proposal Sign In Sheet.pdf PDF
Q A.doc DOC document
SF30 Amendment 0001.doc DOC document
355th Comm. Price Schedule.pdf PDF
StatementofWorkAtch3.doc DOC document
FA4877-08-R-0007NEWSABERSOLICITATIONDavis-MonthanAFB.doc DOC document
97-0503-ELEV1-WEST-Layout1.pdf PDF
97-0503-PLUMB-PLN-Layout1.pdf PDF
97-0503-SITE-WEST-Layout1.pdf PDF
97-0503-ISOMETRICS-Layout1.pdf PDF
97-0503-ELEC-PLN-LAYOUT1.PDF PDF
PastPerformanceEvaluationQuestionnaireAtch2.doc DOC document
97-0503-MECH-PLN-Layout1.pdf PDF
97-0503-FLR-PL-DIM-Layout1.pdf PDF
DepartmentofLaborWageDeterminationsAtch1a b c d.doc DOC document
97-0503-SERVEY-SITE-WEST-Layout1.pdf PDF
97-0503-EXHAUST-PLN-Layout1.pdf PDF
97-0503-FOUND-PLAN-FDN.pdf PDF
COMMSQDesignGuideAtch5.doc DOC document
EnhancedDesignEffort65 and95 SummaryAtch7.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Document #4

Contractor Bid for

Non Pre-Priced Items (NPI)

Material Description: ____________________________________________________________

Supplier: ______________________________________________________________________

Contact: _______________________________________________ Phone: ________________

Material Cost: _________________________________________

Description - include cost of freight and equipment

Material Cost Overhead:

____% x Material Cost

(Includes subcontractor Overhead)

Profit:

____% x Material Cost

(Includes subcontractor Profit)

Total Material Cost { Material Cost + Overhead + Profit } Labor Cost:

RS Means Classification (Electrician, laborer, etc)

RS Means wage rate

Labor rate per hour _________ x ___________ hours

Labor cost

RS Means productivity # ______________

(Similar item in RS Means used to determine labor hours)

Total Labor Cost { Labor Cost}

Total NPI Cost { Total Material Cost + Total Labor Cost } NOTE: When this item is accepted as a “Priced item”, adjust the labor and material total costs by the Coefficient before entering into the Database.

Labor costs will come out of the last page in the R. S. Means Guide. The contractor will use column A (base rate including fringes – hourly rate).

Prepared by:

Print Name

Date

Signature