ContractorBidforNonPre-PricedItemsAtch4.doc
DOC document 29 KB Posted
- Attached to
- SABER - Various Construction Projects Federal contract opportunity
- Solicitation number
- FA4877-08-R-0006
About this file
Non Pre-Priced Item (NPI) Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 0003.doc | DOC document | |
| SF30 Amendment 0002.doc | DOC document | |
| Pre-Proposal Sign In Sheet.pdf | ||
| Q A.doc | DOC document | |
| SF30 Amendment 0001.doc | DOC document | |
| 355th Comm. Price Schedule.pdf | ||
| StatementofWorkAtch3.doc | DOC document | |
| FA4877-08-R-0007NEWSABERSOLICITATIONDavis-MonthanAFB.doc | DOC document | |
| 97-0503-ELEV1-WEST-Layout1.pdf | ||
| 97-0503-PLUMB-PLN-Layout1.pdf | ||
| 97-0503-SITE-WEST-Layout1.pdf | ||
| 97-0503-ISOMETRICS-Layout1.pdf | ||
| 97-0503-ELEC-PLN-LAYOUT1.PDF | ||
| PastPerformanceEvaluationQuestionnaireAtch2.doc | DOC document | |
| 97-0503-MECH-PLN-Layout1.pdf | ||
| 97-0503-FLR-PL-DIM-Layout1.pdf | ||
| DepartmentofLaborWageDeterminationsAtch1a b c d.doc | DOC document | |
| 97-0503-SERVEY-SITE-WEST-Layout1.pdf | ||
| 97-0503-EXHAUST-PLN-Layout1.pdf | ||
| 97-0503-FOUND-PLAN-FDN.pdf | ||
| COMMSQDesignGuideAtch5.doc | DOC document | |
| EnhancedDesignEffort65 and95 SummaryAtch7.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Document #4
Contractor Bid for
Non Pre-Priced Items (NPI)
Material Description: ____________________________________________________________
Supplier: ______________________________________________________________________
Contact: _______________________________________________ Phone: ________________
Material Cost: _________________________________________
Description - include cost of freight and equipment
Material Cost Overhead:
____% x Material Cost
(Includes subcontractor Overhead)
Profit:
____% x Material Cost
(Includes subcontractor Profit)
Total Material Cost { Material Cost + Overhead + Profit } Labor Cost:
RS Means Classification (Electrician, laborer, etc)
RS Means wage rate
Labor rate per hour _________ x ___________ hours
Labor cost
RS Means productivity # ______________
(Similar item in RS Means used to determine labor hours)
Total Labor Cost { Labor Cost}
Total NPI Cost { Total Material Cost + Total Labor Cost } NOTE: When this item is accepted as a “Priced item”, adjust the labor and material total costs by the Coefficient before entering into the Database.
Labor costs will come out of the last page in the R. S. Means Guide. The contractor will use column A (base rate including fringes – hourly rate).
Prepared by:
Print Name
Date
Signature
File details come from the government source that posted it. Updated .